메뉴 건너뛰기




Volumn 58, Issue 2, 2010, Pages 193-198

Analysis of robustness in proactive scheduling: A graphical approach

Author keywords

Decision support; Graphical analysis; Proactive scheduling; Robustness

Indexed keywords

CANDIDATE SOLUTION; CRITICAL PERIODS; DECISION MAKERS; DECISION SUPPORTS; FLOW SHOP PROBLEMS; FLOW SHOP SCHEDULING PROBLEM; GRAPHICAL ANALYSIS; GRAPHICAL APPROACH; GRAPHICAL REPRESENTATIONS; MACHINE BREAKDOWN; PERFORMANCE CRITERION; PROACTIVE SCHEDULING; QUANTITATIVE ANALYSIS; ROBUSTNESS MEASURES; SCHEDULING PROBLEM;

EID: 76649144494     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.03.004     Document Type: Article
Times cited : (38)

References (26)
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161 (2005) 86-110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 5
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Daniels R.L., and Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science 41 2 (1995) 363-376
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 8
    • 27144462119 scopus 로고    scopus 로고
    • Trade-off between maximum completion time and flexibility in the two-machine flow shop scheduling problem
    • Paris, France
    • Esswein, C., & Billaut, J.-C. (2002). Trade-off between maximum completion time and flexibility in the two-machine flow shop scheduling problem. In International symposium on combinatorial optimization. Paris, France.
    • (2002) International symposium on combinatorial optimization
    • Esswein, C.1    Billaut, J.-C.2
  • 10
    • 36148970840 scopus 로고    scopus 로고
    • Robustness and stability measures for scheduling: Single machine environment
    • Goren S., and Sabuncuoglu I. Robustness and stability measures for scheduling: Single machine environment. IIE Transactions 40 (2008) 66-83
    • (2008) IIE Transactions , vol.40 , pp. 66-83
    • Goren, S.1    Sabuncuoglu, I.2
  • 11
    • 0032679037 scopus 로고    scopus 로고
    • Rescheduling and optimization of schedules considering machine failures
    • Guo B., and Nonaka Y. Rescheduling and optimization of schedules considering machine failures. International Journal of Production Economics (1999) 503-513
    • (1999) International Journal of Production Economics , pp. 503-513
    • Guo, B.1    Nonaka, Y.2
  • 12
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen W., and Leus R. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 14
    • 1642270229 scopus 로고    scopus 로고
    • Improving robustness and flexibility of tardiness and total flow time job shops using robustness measures
    • Jensen M.T. Improving robustness and flexibility of tardiness and total flow time job shops using robustness measures. Applied Soft Computing 1 (2001) 35-52
    • (2001) Applied Soft Computing , vol.1 , pp. 35-52
    • Jensen, M.T.1
  • 15
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • Jensen M.T. Generating robust and flexible job shop schedules using genetic algorithms. IEEE Transactions on Evolutionary Computation 7 3 (2003) 275-288
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 16
    • 14844282317 scopus 로고    scopus 로고
    • Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion
    • Kaperski A. Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion. Operations Research Letters 33 (2005) 431-436
    • (2005) Operations Research Letters , vol.33 , pp. 431-436
    • Kaperski, A.1
  • 17
    • 24644495124 scopus 로고    scopus 로고
    • Relative robustness for single-machine scheduling problem with processing time uncertainty
    • Kuo C.Y., and Lin F.J. Relative robustness for single-machine scheduling problem with processing time uncertainty. Journal of Chinese Institute of Industrial Engineering 19 5 (2002) 59-67
    • (2002) Journal of Chinese Institute of Industrial Engineering , vol.19 , Issue.5 , pp. 59-67
    • Kuo, C.Y.1    Lin, F.J.2
  • 18
    • 34248586698 scopus 로고    scopus 로고
    • Single machine scheduling under potential disruption
    • Lee C.Y., and Yu G. Single machine scheduling under potential disruption. Operations Research Letters 35 (2007) 541-548
    • (2007) Operations Research Letters , vol.35 , pp. 541-548
    • Lee, C.Y.1    Yu, G.2
  • 19
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon V.J., Wu S.D., and Storer R.H. Robustness measures and robust scheduling for job shops. IIE Transactions 26 (1994) 32-43
    • (1994) IIE Transactions , vol.26 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 22
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu I., and Bayiz M. Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research 126 (2000) 567-586
    • (2000) European Journal of Operational Research , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 23
    • 60749122333 scopus 로고    scopus 로고
    • Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research
    • Sabuncuoglu I., and Goren S. Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. International Journal of Computer Integrated Manufacturing 22 2 (2009) 138-157
    • (2009) International Journal of Computer Integrated Manufacturing , vol.22 , Issue.2 , pp. 138-157
    • Sabuncuoglu, I.1    Goren, S.2
  • 25
    • 40849142093 scopus 로고    scopus 로고
    • Proactive heuristic procedures for robust project scheduling: An experimental analysis
    • Vonder S.V., Demeulemeester E., and Herroelen W. Proactive heuristic procedures for robust project scheduling: An experimental analysis. European Journal of Operational Research 189 3 (2008) 723-733
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 723-733
    • Vonder, S.V.1    Demeulemeester, E.2    Herroelen, W.3
  • 26
    • 0036498099 scopus 로고    scopus 로고
    • On the robust single machine scheduling problem
    • Yang J., and Yu G. On the robust single machine scheduling problem. Journal of Combinatorial Optimization 6 (2002) 17-33
    • (2002) Journal of Combinatorial Optimization , vol.6 , pp. 17-33
    • Yang, J.1    Yu, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.