-
2
-
-
0037563233
-
Rescheduling of identical parallel machines under machine eligibility constraints
-
Alagöz O., and Azizoglu M. Rescheduling of identical parallel machines under machine eligibility constraints. European Journal of Operational Research 149 (2003) 523-532
-
(2003)
European Journal of Operational Research
, vol.149
, pp. 523-532
-
-
Alagöz, O.1
Azizoglu, M.2
-
3
-
-
5144232431
-
Executing production schedules in the face of uncertainties: a review and some future directions
-
Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research 161 (2005) 86-117
-
(2005)
European Journal of Operational Research
, vol.161
, pp. 86-117
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
4
-
-
0031621768
-
A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull
-
Baker A.D. A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull. Journal of Manufacturing Systems 17 (1998) 297-320
-
(1998)
Journal of Manufacturing Systems
, vol.17
, pp. 297-320
-
-
Baker, A.D.1
-
7
-
-
0033093715
-
Production scheduling and rescheduling with genetic algorithms
-
Bierwirth C., and Mattfeld D.C. Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation 7 1 (1999) 1-17
-
(1999)
Evolutionary Computation
, vol.7
, Issue.1
, pp. 1-17
-
-
Bierwirth, C.1
Mattfeld, D.C.2
-
8
-
-
0034298926
-
An experimental benchmarking of two multi-agent architectures for production scheduling and control
-
Cavalieri S., Garetti M., Macchi M., and Taisch M. An experimental benchmarking of two multi-agent architectures for production scheduling and control. Computers in Industry 43 (2000) 139-152
-
(2000)
Computers in Industry
, vol.43
, pp. 139-152
-
-
Cavalieri, S.1
Garetti, M.2
Macchi, M.3
Taisch, M.4
-
11
-
-
0001947856
-
Probabilistic learning combinations of local job shop scheduling rules
-
Muth J.F., and Thompson G.L. (Eds), Prentice Hall, Englewood Cliffs
-
Fisher H., and Thompson G.L. Probabilistic learning combinations of local job shop scheduling rules. In: Muth J.F., and Thompson G.L. (Eds). Industrial Scheduling (1963), Prentice Hall, Englewood Cliffs
-
(1963)
Industrial Scheduling
-
-
Fisher, H.1
Thompson, G.L.2
-
12
-
-
0000131281
-
Algorithms for solving production-scheduling problems
-
Giffler B., and Thompson G.L. Algorithms for solving production-scheduling problems. Operations Research 8 (1960) 487-503
-
(1960)
Operations Research
, vol.8
, pp. 487-503
-
-
Giffler, B.1
Thompson, G.L.2
-
13
-
-
34447305918
-
-
S. Gören, Robustness and stability measures for scheduling policies in a single machine environment, MSc Thesis, Department of Industrial Engineering, Institute of Engineering and Sciences, Bilkent University, Turkey, 2002.
-
-
-
-
15
-
-
13444269168
-
Project scheduling under uncertainty: survey and research potential
-
Herroelen W., and Leus R. Project scheduling under uncertainty: survey and research potential. European Journal of Operational Research 165 2 (2005) 289-306
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
16
-
-
0000062615
-
Tabu search fort he job shop scheduling problem with multi-purpose machine
-
Hurink E., Jurisch B., and Thole M. Tabu search fort he job shop scheduling problem with multi-purpose machine. Operations Research Spektrum 15 (1994) 205-215
-
(1994)
Operations Research Spektrum
, vol.15
, pp. 205-215
-
-
Hurink, E.1
Jurisch, B.2
Thole, M.3
-
17
-
-
1642270229
-
Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures
-
Jensen T.M. Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures. Applied Soft Computing 1 (2001) 32-35
-
(2001)
Applied Soft Computing
, vol.1
, pp. 32-35
-
-
Jensen, T.M.1
-
18
-
-
34447320354
-
-
T.M. Jensen, Robust and flexible scheduling with evolutionary computation, PhD Thesis, Department of Computer Science, University of Aarhus, Denmark, 2001.
-
-
-
-
19
-
-
0032163477
-
A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules
-
Jeong K.J., and Kim Y.D. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. International Journal of Production Research 36 (1998) 2609-2626
-
(1998)
International Journal of Production Research
, vol.36
, pp. 2609-2626
-
-
Jeong, K.J.1
Kim, Y.D.2
-
20
-
-
34447310440
-
-
B. Kádár, Intelligent approaches to manage changes and disturbances in manufacturing systems, PhD Thesis, Technical University of Budapest, Hungary, 2002.
-
-
-
-
21
-
-
34447312090
-
Discrete event simulation for supporting production planning and scheduling decisions in digital factories
-
Budapest, Hungary
-
Kádár B., Pfeiffer A., and Monostori L. Discrete event simulation for supporting production planning and scheduling decisions in digital factories. Proceedings of the 37th CIRP International Seminar on Manufacturing Systems; Digital Enterprises, Production Networks. Budapest, Hungary (2004) 444-448
-
(2004)
Proceedings of the 37th CIRP International Seminar on Manufacturing Systems; Digital Enterprises, Production Networks
, pp. 444-448
-
-
Kádár, B.1
Pfeiffer, A.2
Monostori, L.3
-
23
-
-
0028594405
-
Simulation based real-time scheduling in a flexible manufacturing system
-
Kim M., and Kim Y.D. Simulation based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing System 13 (1994) 85-93
-
(1994)
Journal of Manufacturing System
, vol.13
, pp. 85-93
-
-
Kim, M.1
Kim, Y.D.2
-
24
-
-
0001694846
-
Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing
-
Kimms A. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing. International Journal of Management Sciences 26 3 (1998) 355-366
-
(1998)
International Journal of Management Sciences
, vol.26
, Issue.3
, pp. 355-366
-
-
Kimms, A.1
-
25
-
-
34447296890
-
-
Intelligent Manufacturing Systems, Elsevier pp. 213-218
-
Kovács A., Váncza J., Kádár B., Monostori L., and Pfeiffer A. Real-Life Scheduling Using Constraint Programming and Simulation (2003), Intelligent Manufacturing Systems, Elsevier pp. 213-218
-
(2003)
Real-Life Scheduling Using Constraint Programming and Simulation
-
-
Kovács, A.1
Váncza, J.2
Kádár, B.3
Monostori, L.4
Pfeiffer, A.5
-
27
-
-
0028499648
-
Robustness measures and robust scheduling for job shops
-
Leon V.J., Wu S.D., and Storer R.H. Robustness measures and robust scheduling for job shops. IIE Transactions 26 5 (1994) 32-43
-
(1994)
IIE Transactions
, vol.26
, Issue.5
, pp. 32-43
-
-
Leon, V.J.1
Wu, S.D.2
Storer, R.H.3
-
28
-
-
0001008727
-
Unifying the theory and practice of production scheduling
-
McKay K.N., and Wiers V.C.S. Unifying the theory and practice of production scheduling. Journal of Manufacturing Systems 18 4 (1999) 241-255
-
(1999)
Journal of Manufacturing Systems
, vol.18
, Issue.4
, pp. 241-255
-
-
McKay, K.N.1
Wiers, V.C.S.2
-
31
-
-
34447316906
-
Simulation supported analysis of a dynamic rescheduling system
-
Athens, Greece
-
Pfeiffer A., Kádár B., Csáji B.Cs., and Monostori L. Simulation supported analysis of a dynamic rescheduling system. Proceedings of the IFAC Conference on Manufacturing, Modelling, Management and Control. Athens, Greece (2004) 24-29
-
(2004)
Proceedings of the IFAC Conference on Manufacturing, Modelling, Management and Control
, pp. 24-29
-
-
Pfeiffer, A.1
Kádár, B.2
Csáji, B.Cs.3
Monostori, L.4
-
35
-
-
0002753338
-
-
Morgan Kaufmann, San Francisco, USA
-
Smith S.F. Intelligent Scheduling, Chap, OPIS: A Methodology and Architecture for Reactive Scheduling (1994), Morgan Kaufmann, San Francisco, USA
-
(1994)
Intelligent Scheduling, Chap, OPIS: A Methodology and Architecture for Reactive Scheduling
-
-
Smith, S.F.1
-
36
-
-
0035396337
-
Automatic simulation model generation for simulation-based, real-time shop floor control
-
Son Y.J., and Wysk R.A. Automatic simulation model generation for simulation-based, real-time shop floor control. Computers in Industry 45 (2001) 291-308
-
(2001)
Computers in Industry
, vol.45
, pp. 291-308
-
-
Son, Y.J.1
Wysk, R.A.2
-
38
-
-
0141558653
-
Reactive scheduling in real-time production control
-
Springer, New York
-
Szelke E., and Monostori L. Reactive scheduling in real-time production control. Modeling Manufacturing Systems (1999), Springer, New York
-
(1999)
Modeling Manufacturing Systems
-
-
Szelke, E.1
Monostori, L.2
-
39
-
-
3142757956
-
Aggregation-the key to integrating production planning and scheduling
-
Váncza J., Kis T., and Kovács A. Aggregation-the key to integrating production planning and scheduling. CIRP Annals-Manufacturing Technology 53 1 (2004) 377-380
-
(2004)
CIRP Annals-Manufacturing Technology
, vol.53
, Issue.1
, pp. 377-380
-
-
Váncza, J.1
Kis, T.2
Kovács, A.3
-
40
-
-
0040518040
-
Predicting the performance of rescheduling strategies for parallel machines systems
-
Vieira G.E., Herrmann J.W., and Lin E. Predicting the performance of rescheduling strategies for parallel machines systems. Journal of Manufacturing Systems 19 (2000) 256-266
-
(2000)
Journal of Manufacturing Systems
, vol.19
, pp. 256-266
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
41
-
-
0242703954
-
Rescheduling manufacturing systems: a framework of strategies, policies and methods
-
Vieira G.E., Herrmann J.W., and Lin E. Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling 6 1 (2003) 39-62
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
42
-
-
0031100831
-
Short shop schedules
-
Williamson D.P., Hall L.A., Hoogeveen J.A., Hurkens C.A., Lenstra J.K., Sevastjanov S.V., and Shmoys D.B. Short shop schedules. Operations Research 45 (1997) 288-294
-
(1997)
Operations Research
, vol.45
, pp. 288-294
-
-
Williamson, D.P.1
Hall, L.A.2
Hoogeveen, J.A.3
Hurkens, C.A.4
Lenstra, J.K.5
Sevastjanov, S.V.6
Shmoys, D.B.7
-
43
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu S.D., Storer R.H., and Chang P.C. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research 20 (1993) 1-14
-
(1993)
Computers and Operations Research
, vol.20
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
|