메뉴 건너뛰기




Volumn 58, Issue 7, 2007, Pages 630-643

Stability-oriented evaluation of rescheduling strategies, by using simulation

Author keywords

Evaluation and benchmarking; Production scheduling and rescheduling; Simulation; Stability

Indexed keywords

PRODUCTION SCHEDULING; RESCHEDULING; STABILITY ORIENTED EVALUATIONS;

EID: 34447296449     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compind.2007.05.009     Document Type: Article
Times cited : (70)

References (43)
  • 2
    • 0037563233 scopus 로고    scopus 로고
    • Rescheduling of identical parallel machines under machine eligibility constraints
    • Alagöz O., and Azizoglu M. Rescheduling of identical parallel machines under machine eligibility constraints. European Journal of Operational Research 149 (2003) 523-532
    • (2003) European Journal of Operational Research , vol.149 , pp. 523-532
    • Alagöz, O.1    Azizoglu, M.2
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: a review and some future directions
    • Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research 161 (2005) 86-117
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-117
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 4
    • 0031621768 scopus 로고    scopus 로고
    • A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull
    • Baker A.D. A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull. Journal of Manufacturing Systems 17 (1998) 297-320
    • (1998) Journal of Manufacturing Systems , vol.17 , pp. 297-320
    • Baker, A.D.1
  • 7
    • 0033093715 scopus 로고    scopus 로고
    • Production scheduling and rescheduling with genetic algorithms
    • Bierwirth C., and Mattfeld D.C. Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation 7 1 (1999) 1-17
    • (1999) Evolutionary Computation , vol.7 , Issue.1 , pp. 1-17
    • Bierwirth, C.1    Mattfeld, D.C.2
  • 8
    • 0034298926 scopus 로고    scopus 로고
    • An experimental benchmarking of two multi-agent architectures for production scheduling and control
    • Cavalieri S., Garetti M., Macchi M., and Taisch M. An experimental benchmarking of two multi-agent architectures for production scheduling and control. Computers in Industry 43 (2000) 139-152
    • (2000) Computers in Industry , vol.43 , pp. 139-152
    • Cavalieri, S.1    Garetti, M.2    Macchi, M.3    Taisch, M.4
  • 11
    • 0001947856 scopus 로고
    • Probabilistic learning combinations of local job shop scheduling rules
    • Muth J.F., and Thompson G.L. (Eds), Prentice Hall, Englewood Cliffs
    • Fisher H., and Thompson G.L. Probabilistic learning combinations of local job shop scheduling rules. In: Muth J.F., and Thompson G.L. (Eds). Industrial Scheduling (1963), Prentice Hall, Englewood Cliffs
    • (1963) Industrial Scheduling
    • Fisher, H.1    Thompson, G.L.2
  • 12
    • 0000131281 scopus 로고
    • Algorithms for solving production-scheduling problems
    • Giffler B., and Thompson G.L. Algorithms for solving production-scheduling problems. Operations Research 8 (1960) 487-503
    • (1960) Operations Research , vol.8 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 13
    • 34447305918 scopus 로고    scopus 로고
    • S. Gören, Robustness and stability measures for scheduling policies in a single machine environment, MSc Thesis, Department of Industrial Engineering, Institute of Engineering and Sciences, Bilkent University, Turkey, 2002.
  • 15
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: survey and research potential
    • Herroelen W., and Leus R. Project scheduling under uncertainty: survey and research potential. European Journal of Operational Research 165 2 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 16
    • 0000062615 scopus 로고
    • Tabu search fort he job shop scheduling problem with multi-purpose machine
    • Hurink E., Jurisch B., and Thole M. Tabu search fort he job shop scheduling problem with multi-purpose machine. Operations Research Spektrum 15 (1994) 205-215
    • (1994) Operations Research Spektrum , vol.15 , pp. 205-215
    • Hurink, E.1    Jurisch, B.2    Thole, M.3
  • 17
    • 1642270229 scopus 로고    scopus 로고
    • Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures
    • Jensen T.M. Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures. Applied Soft Computing 1 (2001) 32-35
    • (2001) Applied Soft Computing , vol.1 , pp. 32-35
    • Jensen, T.M.1
  • 18
    • 34447320354 scopus 로고    scopus 로고
    • T.M. Jensen, Robust and flexible scheduling with evolutionary computation, PhD Thesis, Department of Computer Science, University of Aarhus, Denmark, 2001.
  • 19
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules
    • Jeong K.J., and Kim Y.D. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. International Journal of Production Research 36 (1998) 2609-2626
    • (1998) International Journal of Production Research , vol.36 , pp. 2609-2626
    • Jeong, K.J.1    Kim, Y.D.2
  • 20
    • 34447310440 scopus 로고    scopus 로고
    • B. Kádár, Intelligent approaches to manage changes and disturbances in manufacturing systems, PhD Thesis, Technical University of Budapest, Hungary, 2002.
  • 22
    • 0033728696 scopus 로고    scopus 로고
    • Evaluation and comparison of production schedules
    • Kempf K., Uzsoy R., Smith S., and Gary K. Evaluation and comparison of production schedules. Computers in Industry 42 (2000) 203-220
    • (2000) Computers in Industry , vol.42 , pp. 203-220
    • Kempf, K.1    Uzsoy, R.2    Smith, S.3    Gary, K.4
  • 23
    • 0028594405 scopus 로고
    • Simulation based real-time scheduling in a flexible manufacturing system
    • Kim M., and Kim Y.D. Simulation based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing System 13 (1994) 85-93
    • (1994) Journal of Manufacturing System , vol.13 , pp. 85-93
    • Kim, M.1    Kim, Y.D.2
  • 24
    • 0001694846 scopus 로고    scopus 로고
    • Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing
    • Kimms A. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing. International Journal of Management Sciences 26 3 (1998) 355-366
    • (1998) International Journal of Management Sciences , vol.26 , Issue.3 , pp. 355-366
    • Kimms, A.1
  • 27
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon V.J., Wu S.D., and Storer R.H. Robustness measures and robust scheduling for job shops. IIE Transactions 26 5 (1994) 32-43
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 28
    • 0001008727 scopus 로고    scopus 로고
    • Unifying the theory and practice of production scheduling
    • McKay K.N., and Wiers V.C.S. Unifying the theory and practice of production scheduling. Journal of Manufacturing Systems 18 4 (1999) 241-255
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 241-255
    • McKay, K.N.1    Wiers, V.C.S.2
  • 30
  • 36
    • 0035396337 scopus 로고    scopus 로고
    • Automatic simulation model generation for simulation-based, real-time shop floor control
    • Son Y.J., and Wysk R.A. Automatic simulation model generation for simulation-based, real-time shop floor control. Computers in Industry 45 (2001) 291-308
    • (2001) Computers in Industry , vol.45 , pp. 291-308
    • Son, Y.J.1    Wysk, R.A.2
  • 38
    • 0141558653 scopus 로고    scopus 로고
    • Reactive scheduling in real-time production control
    • Springer, New York
    • Szelke E., and Monostori L. Reactive scheduling in real-time production control. Modeling Manufacturing Systems (1999), Springer, New York
    • (1999) Modeling Manufacturing Systems
    • Szelke, E.1    Monostori, L.2
  • 39
    • 3142757956 scopus 로고    scopus 로고
    • Aggregation-the key to integrating production planning and scheduling
    • Váncza J., Kis T., and Kovács A. Aggregation-the key to integrating production planning and scheduling. CIRP Annals-Manufacturing Technology 53 1 (2004) 377-380
    • (2004) CIRP Annals-Manufacturing Technology , vol.53 , Issue.1 , pp. 377-380
    • Váncza, J.1    Kis, T.2    Kovács, A.3
  • 40
    • 0040518040 scopus 로고    scopus 로고
    • Predicting the performance of rescheduling strategies for parallel machines systems
    • Vieira G.E., Herrmann J.W., and Lin E. Predicting the performance of rescheduling strategies for parallel machines systems. Journal of Manufacturing Systems 19 (2000) 256-266
    • (2000) Journal of Manufacturing Systems , vol.19 , pp. 256-266
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 41
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: a framework of strategies, policies and methods
    • Vieira G.E., Herrmann J.W., and Lin E. Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling 6 1 (2003) 39-62
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 43
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu S.D., Storer R.H., and Chang P.C. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research 20 (1993) 1-14
    • (1993) Computers and Operations Research , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.