메뉴 건너뛰기




Volumn 22, Issue 2, 2009, Pages 138-157

Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research

Author keywords

Proactive; Robustness; Scheduling; Stability; Uncertainty

Indexed keywords

CONVERGENCE OF NUMERICAL METHODS; DECISION MAKING; INDUSTRIAL RESEARCH; PRODUCTION CONTROL; ROBUSTNESS (CONTROL SYSTEMS); SCHEDULING; STABILITY; STOCHASTIC SYSTEMS;

EID: 60749122333     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920802209033     Document Type: Article
Times cited : (124)

References (37)
  • 3
  • 5
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., et al., 2005. Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research, 161 (1), 86-110.
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1
  • 6
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean, J.C., et al., 1991. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research, 39 (3), 470-483.
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1
  • 9
    • 0031268742 scopus 로고    scopus 로고
    • β-robust scheduling for single machine systems with uncertain processing times
    • Daniels, R.L. and Carillo, J.E., 1997. β-robust scheduling for single machine systems with uncertain processing times. IIE Transactions, 29, 977-985.
    • (1997) IIE Transactions , vol.29 , pp. 977-985
    • Daniels, R.L.1    Carillo, J.E.2
  • 10
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Daniels, R.L. and Kouvelis, P., 1995. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science, 41 (2), 363-376.
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 12
    • 0032679037 scopus 로고    scopus 로고
    • Rescheduling and optimization of schedules considering machine failures
    • Guo, B. and Nonaka, Y., 1999. Rescheduling and optimization of schedules considering machine failures. International Journal of Production Economics, 60-61, 503-513.
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 503-513
    • Guo, B.1    Nonaka, Y.2
  • 13
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen, W. and Leus, E., 2005. Project scheduling under uncertainty: survey and research potentials. European Journal of Operational Research, 165 (2), 289-306.
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, E.2
  • 14
    • 1642270229 scopus 로고    scopus 로고
    • Improving robustness and flexibility of tardiness and total flow time job shops using robustness measures
    • Jensen, M.T., 2001. Improving robustness and flexibility of tardiness and total flow time job shops using robustness measures. Applied Soft Computing, 1, 35-52.
    • (2001) Applied Soft Computing , vol.1 , pp. 35-52
    • Jensen, M.T.1
  • 15
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • Jensen, M.T., 2003. Generating robust and flexible job shop schedules using genetic algorithms. IEEE Transactions on Evolutionary Computation, 7 (3), 275-288.
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 16
    • 14844282317 scopus 로고    scopus 로고
    • Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion
    • Kasperski, A., 2005. Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion. Operations Research Letters, 33, 431-436.
    • (2005) Operations Research Letters , vol.33 , pp. 431-436
    • Kasperski, A.1
  • 18
    • 0040621775 scopus 로고    scopus 로고
    • Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
    • Kutanoglu, E. and Sabuncuoglu, I., 2001. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop. Journal of Manufacturing Systems, 20 (4), 264-279.
    • (2001) Journal of Manufacturing Systems , vol.20 , Issue.4 , pp. 264-279
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 19
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon, V.J., Wu, S.D., and Storer, R.H., 1994. Robustness measures and robust scheduling for job shops. IIE Transactions, 26 (5), 32-43.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 20
    • 9644275655 scopus 로고    scopus 로고
    • The complexity of machine scheduling for stability with a single disrupted job
    • Leus, R. and Herroelen, W., 2005. The complexity of machine scheduling for stability with a single disrupted job. Operations Research Letters, 33, 151-156.
    • (2005) Operations Research Letters , vol.33 , pp. 151-156
    • Leus, R.1    Herroelen, W.2
  • 21
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • Mehta, S.V. and Uzsoy, R., 1998. Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation, 14 (3), 365-378.
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.2
  • 23
    • 60749127934 scopus 로고    scopus 로고
    • Morton, T.E. and Rachamadugu, R.V., 1982. Myopic heuristics for the single machine weighted tardiness problem. Tech. Report CMU-RI-TR-83-09, Robotics Institute, Carnegie Mellon University.
    • Morton, T.E. and Rachamadugu, R.V., 1982. Myopic heuristics for the single machine weighted tardiness problem. Tech. Report CMU-RI-TR-83-09, Robotics Institute, Carnegie Mellon University.
  • 24
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan, R., Uzsoy, R., and McKay, K.N., 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37 (18), 4217-4233.
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 26
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu, I. and Bayiz, M., 2000. Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research, 126, 567-586.
    • (2000) European Journal of Operational Research , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 27
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and AGVs in a flexible manufacturing system
    • Sabuncuoglu, I. and Hommertzheim, D.L., 1992. Dynamic dispatching algorithm for scheduling machines and AGVs in a flexible manufacturing system. International Journal of Production Research, 30, 1059-1080.
    • (1992) International Journal of Production Research , vol.30 , pp. 1059-1080
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 28
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • Sabuncuoglu, I. and Karabuk, S., 1999. Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. Journal of Manufacturing Systems, 18 (4), 1-16.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 1-16
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 32
    • 40849142093 scopus 로고    scopus 로고
    • Van de Vonder, S., Demeulemeester, E., and Herroelen, W., 2008. Proactive heuristic procedures for robust project scheduling: an experimental analysis. European Journal of Operational Research, 189 (3), 723-733 (in press).
    • Van de Vonder, S., Demeulemeester, E., and Herroelen, W., 2008. Proactive heuristic procedures for robust project scheduling: an experimental analysis. European Journal of Operational Research, 189 (3), 723-733 (in press).
  • 33
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • Vieira, G.E., Herrmann, J.W., and Lin, E., 2003. Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling, 6, 39-62.
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 34
    • 0000927907 scopus 로고    scopus 로고
    • A graphtheoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • Wu, S.D., Byeon, E., and Storer, R.H., 1999. A graphtheoretic decomposition of the job shop scheduling problem to achieve scheduling robustness. Operations Research, 47 (1), 113-124.
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.2    Storer, R.H.3
  • 35
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S.D., Storer, R.N., and Chang, P., 1993. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research, 20 (1), 1-14.
    • (1993) Computers and Operations Research , vol.20 , Issue.1 , pp. 1-14
    • Wu, S.D.1    Storer, R.N.2    Chang, P.3
  • 36
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in a manufacturing operating system environment
    • Yamamoto, M. and Nof, S.Y., 1985. Scheduling/rescheduling in a manufacturing operating system environment. International Journal of Production Research, 23 (4), 705-722.
    • (1985) International Journal of Production Research , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2
  • 37
    • 0036498099 scopus 로고    scopus 로고
    • On the robust single machine scheduling problem
    • Yang, J. and Yu, G., 2002. On the robust single machine scheduling problem. Journal of Combinatorial Optimization, 6, 17-33.
    • (2002) Journal of Combinatorial Optimization , vol.6 , pp. 17-33
    • Yang, J.1    Yu, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.