-
1
-
-
60549085550
-
An optimal operating policy for the production system with rework
-
Liu N, Kim Y, Hwang H (2009) An optimal operating policy for the production system with rework. Comput Ind Eng 56(3):874-887
-
(2009)
Comput Ind Eng
, vol.56
, Issue.3
, pp. 874-887
-
-
Liu, N.1
Kim, Y.2
Hwang, H.3
-
2
-
-
81855164891
-
Replenishment run time problem with machine breakdown and failure in rework
-
doi:10.1016/j.eswa.2011.08.005
-
Chiu YS, Chen KK, Ting CK (2012) Replenishment run time problem with machine breakdown and failure in rework. Expert Syst Appl. doi:10.1016/j.eswa. 2011.08.005
-
(2012)
Expert Syst Appl
-
-
Chiu, Y.S.1
Chen, K.K.2
Ting, C.K.3
-
3
-
-
34548565651
-
Optimal batch sizing in a multi-stage production system with rework consideration
-
DOI 10.1016/j.ejor.2006.12.005, PII S0377221706012033
-
Sarker BR, Jamal AMM, Mondal S (2008) Optimal batch sizing in a multi-stage production system with rework consideration. Eur J Oper Res 184(3):915-929 (Pubitemid 47391152)
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.3
, pp. 915-929
-
-
Sarker, B.R.1
Jamal, A.M.M.2
Mondal, S.3
-
4
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
Chiu SW, Chiu YSP (2006) Mathematical modeling for production system with backlogging and failure in repair. J Sci Ind Res 65 (6):499-506 (Pubitemid 43942050)
-
(2006)
Journal of Scientific and Industrial Research
, vol.65
, Issue.6
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
5
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
Jamal AMM, Sarker BR, Mondal S (2004) Optimal manufacturing batch size with rework process at a single-stage production system. Comput Ind Eng 47(1):77-89
-
(2004)
Comput Ind Eng
, vol.47
, Issue.1
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
6
-
-
80051594167
-
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
-
Chiu YSP, Liu SC, Chiu CL, Chang HH (2011) Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments. Math Comput Model 54(9- 10):2165-2174
-
(2011)
Math Comput Model
, vol.54
, Issue.9-10
, pp. 2165-2174
-
-
Chiu, Y.S.P.1
Liu, S.C.2
Chiu, C.L.3
Chang, H.H.4
-
7
-
-
34247863936
-
Optimal production lot sizing with rework, scrap rate, and service level constraint
-
DOI 10.1016/j.mcm.2006.11.031, PII S0895717706004262
-
Chiu SW, Ting CK, Chiu YSP (2007) Optimal production lot sizing with rework, scrap rate, and service level constraint. Math Comput Model 46(3-4):535-549 (Pubitemid 46702468)
-
(2007)
Mathematical and Computer Modelling
, vol.46
, Issue.3-4
, pp. 535-549
-
-
Chiu, S.W.1
Ting, C.-K.2
Chiu, Y.-S.P.3
-
8
-
-
54949157109
-
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
-
Lin HD, Chiu YSP, Ting CK (2008) A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Comput Math Appl 56(11):2819-2824
-
(2008)
Comput Math Appl
, vol.56
, Issue.11
, pp. 2819-2824
-
-
Lin, H.D.1
Chiu, Y.S.P.2
Ting, C.K.3
-
9
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
DOI 10.1016/0377-2217(94)00339-4
-
Liu JJ, Yang P (1996) Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. Eur J Oper Res 91 (3):517-527 (Pubitemid 126393163)
-
(1996)
European Journal of Operational Research
, vol.91
, Issue.3
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
10
-
-
0030192321
-
Scheduling in flowshop and cellular manufacturing systems with multiple objectives - A genetic algorithmic approach
-
Sridhar J, Rajendran C (1996) Scheduling in flow shop and cellular manufacturing systems with multiple objectives-a genetic algorithmic approach. Product Plan Control 7(4):374-382 (Pubitemid 126625491)
-
(1996)
Production Planning and Control
, vol.7
, Issue.4
, pp. 374-382
-
-
Sridhar, J.1
Rajendran, C.2
-
11
-
-
0009186505
-
-
Productivity Press(India) (P) Ltd, Madras
-
Hutchins D (1993) Just in time. Productivity Press (India) (P) Ltd, Madras
-
(1993)
Just in Time
-
-
Hutchins, D.1
-
12
-
-
0036466891
-
Design of bi-criteria kanban system using simulated annealing technique
-
DOI 10.1016/S0360-8352(01)00060-2, PII S0360835201000602
-
Shahabudeen P, Gopinath R, Krishnaiah K (2002) Design of bicriteria kanban system using simulated annealing technique. Comput Ind Eng 41(4):355-370 (Pubitemid 34040912)
-
(2002)
Computers and Industrial Engineering
, vol.41
, Issue.4
, pp. 355-370
-
-
Shahabudeen, P.1
Gopinath, R.2
Krishnaiah, K.3
-
13
-
-
0027684952
-
The determination of the optimal number of kanbans in a JIT production system
-
Fukukawa T, Hong SC (1993) The determination of the optimal number of kanbans in a JIT production system. Comput Ind Eng 24(4):551-559
-
(1993)
Comput Ind Eng
, vol.24
, Issue.4
, pp. 551-559
-
-
Fukukawa, T.1
Hong, S.C.2
-
14
-
-
0003449926
-
-
Industrial Engineering and Management Press, Norcross (GA)
-
Monden Y (1983) The Toyota production system. Industrial Engineering and Management Press, Norcross (GA)
-
(1983)
The Toyota Production System
-
-
Monden, Y.1
-
15
-
-
84952179325
-
Design and analysis of pull system, A method of multi stage production control
-
Kimura O, Terada H (1981) Design and analysis of pull system, a method of multi stage production control. Int J Product Res 19 (3):241-253
-
(1981)
Int J Product Res
, vol.19
, Issue.3
, pp. 241-253
-
-
Kimura, O.1
Terada, H.2
-
16
-
-
0023330726
-
A mathematical programming approach to a deterministic kanban system
-
Bitran GR, Chang L (1987) A mathematical programming approach to a deterministic kanban system. Manag Sci 33(4):427-441
-
(1987)
Manag Sci
, vol.33
, Issue.4
, pp. 427-441
-
-
Bitran, G.R.1
Chang, L.2
-
17
-
-
0026153765
-
Determining the number of kanban in a multiproduct multistage production system
-
Bard JF, Golany B (1991) Determining the number of kanban in a multiproduct multistage production system. Int J Product Res 29 (5):881-895
-
(1991)
Int J Product Res
, vol.29
, Issue.5
, pp. 881-895
-
-
Bard, J.F.1
Golany, B.2
-
18
-
-
0028439455
-
Production planning for a multiitem, multi-stage kanban system
-
Mitwasi MG, Askin RG (1994) Production planning for a multiitem, multi-stage kanban system. Int J Product Res 32(5):1173-1195
-
(1994)
Int J Product Res
, vol.32
, Issue.5
, pp. 1173-1195
-
-
Mitwasi, M.G.1
Askin, R.G.2
-
19
-
-
0032089489
-
Adapting just-in-time manufacturing systems to preventive maintenance interruptions
-
Gupta SM, Al-Turki YAY (1998) Adapting JIT manufacturing systems to preventive maintenance interrupts. Product Plan Control 9(4):349-359 (Pubitemid 128625492)
-
(1998)
Production Planning and Control
, vol.9
, Issue.4
, pp. 349-359
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
20
-
-
0030269796
-
Operations planning for kanbans between two adjacent workstations
-
Sarker BR, Balan CV (1996) Operations planning for kanbans between two adjacent workstations. Comput Ind Eng 31 (1-2):221-224 (Pubitemid 126380023)
-
(1996)
Computers and Industrial Engineering
, vol.31
, Issue.1-2
, pp. 221-224
-
-
Sarker, B.R.1
Balan, C.V.2
-
21
-
-
0031999406
-
Operations planning for a single-stage kanban system operating under linear demand
-
Sarker BR, Balan CV (1998) Operations planning for a singlestage kanban system operating under linear demand. Int J Product Res 36(2):357-375 (Pubitemid 128565055)
-
(1998)
International Journal of Production Research
, vol.36
, Issue.2
, pp. 357-375
-
-
Sarker, B.R.1
Balan, C.V.2
-
22
-
-
0032708083
-
Operations planning for a multi-stage kanban system
-
Sarker BR, Balan CV (1999) Operations planning for a multi-stage kanban system. Eur J Oper Res 112(2):284-303
-
(1999)
Eur J Oper Res
, vol.112
, Issue.2
, pp. 284-303
-
-
Sarker, B.R.1
Balan, C.V.2
-
23
-
-
32544454181
-
Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
-
DOI 10.1016/j.ejor.2004.10.001, PII S0377221704007787
-
Wang S, Sarker BR (2006) Optimal model for a multi-stage supply chain system controlled by kanban under JIT philosophy. Eur J Oper Res 172(1):179-200 (Pubitemid 43234028)
-
(2006)
European Journal of Operational Research
, vol.172
, Issue.1
, pp. 179-200
-
-
Wang, S.1
Sarker, B.R.2
-
24
-
-
55349094633
-
Performance evaluation of SCM in JIT environment
-
Kojima M, Nakashima K, Ohno K (2008) Performance evaluation of SCM in JIT environment. Int J Product Econ 115(2):439-443
-
(2008)
Int J Product Econ
, vol.115
, Issue.2
, pp. 439-443
-
-
Kojima, M.1
Nakashima, K.2
Ohno, K.3
-
25
-
-
60849118080
-
Determination of number of kanbans in a supply chain system via Memetic algorithm
-
Rabbani M, Layegh J, Mohammad Ebrahim R (2009) Determination of number of kanbans in a supply chain system via Memetic algorithm. Adv Eng Softw 40(6):431-437
-
(2009)
Adv Eng Softw
, vol.40
, Issue.6
, pp. 431-437
-
-
Rabbani, M.1
Layegh, J.2
Mohammad Ebrahim, R.3
-
26
-
-
77951132551
-
Determining the optimal number of kanban in multi-products supply chain system
-
Widyadana GA, Wee HM, Chang JY (2010) Determining the optimal number of kanban in multi-products supply chain system. Int J Syst Sci 41(2):189-201
-
(2010)
Int J Syst Sci
, vol.41
, Issue.2
, pp. 189-201
-
-
Widyadana, G.A.1
Wee, H.M.2
Chang, J.Y.3
-
27
-
-
78951481949
-
Determination of the number of kanbans and batch sizes in a JIT supply chain system
-
Chaharsooghi SK, Sajedinejad A (2010) Determination of the number of kanbans and batch sizes in a JIT supply chain system. Sci Iran 17(2E):143-149
-
(2010)
Sci Iran
, vol.17
, Issue.2 E
, pp. 143-149
-
-
Chaharsooghi, S.K.1
Sajedinejad, A.2
-
28
-
-
73349094349
-
The search for the optimal number of kanbans in unstable assembly-tree layout systems under intensive loading conditions
-
Lannone R, Miranda S, Riemma S (2009) The search for the optimal number of kanbans in unstable assembly-tree layout systems under intensive loading conditions. Int J Comput Integr Manuf 22(4):315-324
-
(2009)
Int J Comput Integr Manuf
, vol.22
, Issue.4
, pp. 315-324
-
-
Lannone, R.1
Miranda, S.2
Riemma, S.3
-
29
-
-
77951141667
-
A hybrid GAsimulation approach to improve JIT systems
-
Azadeh A, Ebrahimipour V, Bavar P (2010) A hybrid GAsimulation approach to improve JIT systems. Int J Product Res 48(8):2323-2344
-
(2010)
Int J Product Res
, vol.48
, Issue.8
, pp. 2323-2344
-
-
Azadeh, A.1
Ebrahimipour, V.2
Bavar, P.3
-
30
-
-
77954289368
-
Optimal batch size in a singlestage and optimal number of kanbans in a multi-stage JIT production-delivery system with rework consideration
-
Parveen M, Rao TVVLN (2010) Optimal batch size in a singlestage and optimal number of kanbans in a multi-stage JIT production-delivery system with rework consideration. Int J logist Syst manag 7(1):56-80
-
(2010)
Int J Logist Syst Manag
, vol.7
, Issue.1
, pp. 56-80
-
-
Parveen, M.1
Rao, T.V.V.L.N.2
-
31
-
-
79151483326
-
An integrated MOGA approach to determine the Pareto-optimal kanban number and size for a JIT system
-
Hou TH, Hu WC (2011) An integrated MOGA approach to determine the Pareto-optimal kanban number and size for a JIT system. Expert Syst Appl 38(5):5912-5918
-
(2011)
Expert Syst Appl
, vol.38
, Issue.5
, pp. 5912-5918
-
-
Hou, T.H.1
Hu, W.C.2
-
32
-
-
79956140753
-
Effects of imperfect products on lot sizing with work in process inventory
-
Barzoki MR, Jahanbazi M, Bijari M (2011) Effects of imperfect products on lot sizing with work in process inventory. Appl Math Comput 217(21):8328-8336
-
(2011)
Appl Math Comput
, vol.217
, Issue.21
, pp. 8328-8336
-
-
Barzoki, M.R.1
Jahanbazi, M.2
Bijari, M.3
-
33
-
-
45849091113
-
Lot sizing with nonzero setup times for rework
-
Haji R, Haji A, SajadifarM, Zolfaghari S (2008) Lot sizing with nonzero setup times for rework. J Syst Sci Syst Eng 17(2):230-240
-
(2008)
J Syst Sci Syst Eng
, vol.17
, Issue.2
, pp. 230-240
-
-
Haji, R.1
Haji, A.2
Sajadifar, M.3
Olfaghari, S.4
-
34
-
-
54349091548
-
Optimal batch quantity models for a lean production system with in-cycle rework and scrap
-
Biswas P, Sarker BR (2008) Optimal batch quantity models for a lean production system with in-cycle rework and scrap. Int J Product Res 46(23):6585-6610
-
(2008)
Int J Product Res
, vol.46
, Issue.23
, pp. 6585-6610
-
-
Biswas, P.1
Sarker, B.R.2
-
35
-
-
63549134363
-
Optimal jit production and delivery lot size model that considers vendor reworking process and variable setup cost
-
Chiu Y, Chang CY (2009) Optimal jit production and delivery lot size model that considers vendor reworking process and variable setup cost. J Chin Inst Ind Eng 26(2):99-108
-
(2009)
J Chin Inst Ind Eng
, vol.26
, Issue.2
, pp. 99-108
-
-
Chiu, Y.1
Chang, C.Y.2
-
36
-
-
77749271490
-
Hybrid Taguchi-harmony search algorithm for solving engineering optimization problems
-
Yildiz AR (2008) Hybrid Taguchi-harmony search algorithm for solving engineering optimization problems. Int J Ind Eng Theory, Appl Pract 15(3):286-293
-
(2008)
Int J Ind Eng Theory, Appl Pract
, vol.15
, Issue.3
, pp. 286-293
-
-
Yildiz, A.R.1
-
37
-
-
59749087555
-
A novel particle swarm optimization approach for product design and manufacturing
-
Yildiz AR (2009) A novel particle swarm optimization approach for product design and manufacturing. Int J Adv Manuf Technol 40 (5-6):617-628
-
(2009)
Int J Adv Manuf Technol
, vol.40
, Issue.5-6
, pp. 617-628
-
-
Yildiz, A.R.1
-
38
-
-
64849115856
-
Hybrid immune-simulated annealing algorithm for optimal design and manufacturing
-
Yildiz AR (2009) Hybrid immune-simulated annealing algorithm for optimal design and manufacturing. Int J Mater Prod Technol 34 (3):217-226
-
(2009)
Int J Mater Prod Technol
, vol.34
, Issue.3
, pp. 217-226
-
-
Yildiz, A.R.1
-
39
-
-
69349099465
-
A new design optimization framework based on immune algorithm and Taguchi method
-
Yildiz AR (2009) A new design optimization framework based on immune algorithm and Taguchi method. Comput Ind 60(8):613-620
-
(2009)
Comput Ind
, vol.60
, Issue.8
, pp. 613-620
-
-
Yildiz, A.R.1
-
40
-
-
63749123634
-
A novel hybrid immune algorithm for global optimization in design and manufacturing
-
Yildiz AR (2009) A novel hybrid immune algorithm for global optimization in design and manufacturing. Robotics Comput Integr Manuf 25(2):261-270
-
(2009)
Robotics Comput Integr Manuf
, vol.25
, Issue.2
, pp. 261-270
-
-
Yildiz, A.R.1
-
41
-
-
79956102176
-
An effective hybrid immune-hill climbing optimization approach for solving design and manufacturing optimization problems in industry
-
Yildiz AR (2009) An effective hybrid immune-hill climbing optimization approach for solving design and manufacturing optimization problems in industry. J Mater Process Technol 50(4):224-228
-
(2009)
J Mater Process Technol
, vol.50
, Issue.4
, pp. 224-228
-
-
Yildiz, A.R.1
-
42
-
-
78651313263
-
Topology synthesis of multicomponent structural assemblies in
-
continuum domains
-
Yildiz AR, Saitou K (2011) Topology synthesis of multicomponent structural assemblies in continuum domains. ASME J Mech Des 133:1
-
(2011)
ASME J Mech des
, vol.133
, pp. 1
-
-
Yildiz, A.R.1
Saitou, K.2
-
45
-
-
0037291006
-
A hybrid particle swarm optimization for distribution state estimation
-
Shigenori N, Takamu GJ, Toshiki Y, Yoshikazu F (2003) A hybrid particle swarm optimization for distribution state estimation. IEEE Trans Power Syst 18(1):60-68
-
(2003)
IEEE Trans Power Syst
, vol.18
, Issue.1
, pp. 60-68
-
-
Shigenori, N.1
Takamu, G.J.2
Toshiki, Y.3
Yoshikazu, F.4
-
47
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick S, Gelatt CD, Veechi MP (1983) Optimization by simulated annealing. Sci 220(4598):671-679
-
(1983)
Sci
, vol.220
, Issue.4598
, pp. 671-679
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Veechi, M.P.3
-
49
-
-
34548850594
-
A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system
-
DOI 10.1016/j.ejor.2006.12.058, PII S0377221707000811
-
Safaei N, Saidi-Mehrabad M, Jabal-Ameli MS (2008) A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system. Eur J Oper Res 185(2):563-592 (Pubitemid 47446037)
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 563-592
-
-
Safaei, N.1
Saidi-Mehrabad, M.2
Jabal-Ameli, M.S.3
|