메뉴 건너뛰기




Volumn 63, Issue 9-12, 2012, Pages 1177-1189

Determination of number of kanban in a cellular manufacturing system with considering rework process

Author keywords

Cellular manufacturing system; Kanban; Mixed integer non linear programming (MINLP); Particle swarm optimization; Rework; Simulated annealing

Indexed keywords

BATCH SIZES; COMPUTATIONAL TIME; DEFECTIVE ITEMS; JUST-IN-TIME PRODUCTION SYSTEMS; KANBAN; META-HEURISTIC METHODS; MIXED-INTEGER NONLINEAR PROGRAMMING; NEAR-OPTIMAL SOLUTIONS; OPTIMAL SOLUTIONS; PRODUCT INVENTORY; PRODUCTION RUN; PSO ALGORITHMS; RESEARCH STUDIES; REWORK; REWORK PROCESS; SIMULATED ANNEALING ALGORITHMS;

EID: 84870061774     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-012-3973-y     Document Type: Article
Times cited : (17)

References (49)
  • 1
    • 60549085550 scopus 로고    scopus 로고
    • An optimal operating policy for the production system with rework
    • Liu N, Kim Y, Hwang H (2009) An optimal operating policy for the production system with rework. Comput Ind Eng 56(3):874-887
    • (2009) Comput Ind Eng , vol.56 , Issue.3 , pp. 874-887
    • Liu, N.1    Kim, Y.2    Hwang, H.3
  • 2
    • 81855164891 scopus 로고    scopus 로고
    • Replenishment run time problem with machine breakdown and failure in rework
    • doi:10.1016/j.eswa.2011.08.005
    • Chiu YS, Chen KK, Ting CK (2012) Replenishment run time problem with machine breakdown and failure in rework. Expert Syst Appl. doi:10.1016/j.eswa. 2011.08.005
    • (2012) Expert Syst Appl
    • Chiu, Y.S.1    Chen, K.K.2    Ting, C.K.3
  • 3
    • 34548565651 scopus 로고    scopus 로고
    • Optimal batch sizing in a multi-stage production system with rework consideration
    • DOI 10.1016/j.ejor.2006.12.005, PII S0377221706012033
    • Sarker BR, Jamal AMM, Mondal S (2008) Optimal batch sizing in a multi-stage production system with rework consideration. Eur J Oper Res 184(3):915-929 (Pubitemid 47391152)
    • (2008) European Journal of Operational Research , vol.184 , Issue.3 , pp. 915-929
    • Sarker, B.R.1    Jamal, A.M.M.2    Mondal, S.3
  • 4
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • Chiu SW, Chiu YSP (2006) Mathematical modeling for production system with backlogging and failure in repair. J Sci Ind Res 65 (6):499-506 (Pubitemid 43942050)
    • (2006) Journal of Scientific and Industrial Research , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 5
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • Jamal AMM, Sarker BR, Mondal S (2004) Optimal manufacturing batch size with rework process at a single-stage production system. Comput Ind Eng 47(1):77-89
    • (2004) Comput Ind Eng , vol.47 , Issue.1 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 6
    • 80051594167 scopus 로고    scopus 로고
    • Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
    • Chiu YSP, Liu SC, Chiu CL, Chang HH (2011) Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments. Math Comput Model 54(9- 10):2165-2174
    • (2011) Math Comput Model , vol.54 , Issue.9-10 , pp. 2165-2174
    • Chiu, Y.S.P.1    Liu, S.C.2    Chiu, C.L.3    Chang, H.H.4
  • 7
    • 34247863936 scopus 로고    scopus 로고
    • Optimal production lot sizing with rework, scrap rate, and service level constraint
    • DOI 10.1016/j.mcm.2006.11.031, PII S0895717706004262
    • Chiu SW, Ting CK, Chiu YSP (2007) Optimal production lot sizing with rework, scrap rate, and service level constraint. Math Comput Model 46(3-4):535-549 (Pubitemid 46702468)
    • (2007) Mathematical and Computer Modelling , vol.46 , Issue.3-4 , pp. 535-549
    • Chiu, S.W.1    Ting, C.-K.2    Chiu, Y.-S.P.3
  • 8
    • 54949157109 scopus 로고    scopus 로고
    • A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • Lin HD, Chiu YSP, Ting CK (2008) A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Comput Math Appl 56(11):2819-2824
    • (2008) Comput Math Appl , vol.56 , Issue.11 , pp. 2819-2824
    • Lin, H.D.1    Chiu, Y.S.P.2    Ting, C.K.3
  • 9
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • DOI 10.1016/0377-2217(94)00339-4
    • Liu JJ, Yang P (1996) Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. Eur J Oper Res 91 (3):517-527 (Pubitemid 126393163)
    • (1996) European Journal of Operational Research , vol.91 , Issue.3 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 10
    • 0030192321 scopus 로고    scopus 로고
    • Scheduling in flowshop and cellular manufacturing systems with multiple objectives - A genetic algorithmic approach
    • Sridhar J, Rajendran C (1996) Scheduling in flow shop and cellular manufacturing systems with multiple objectives-a genetic algorithmic approach. Product Plan Control 7(4):374-382 (Pubitemid 126625491)
    • (1996) Production Planning and Control , vol.7 , Issue.4 , pp. 374-382
    • Sridhar, J.1    Rajendran, C.2
  • 11
    • 0009186505 scopus 로고
    • Productivity Press(India) (P) Ltd, Madras
    • Hutchins D (1993) Just in time. Productivity Press (India) (P) Ltd, Madras
    • (1993) Just in Time
    • Hutchins, D.1
  • 12
    • 0036466891 scopus 로고    scopus 로고
    • Design of bi-criteria kanban system using simulated annealing technique
    • DOI 10.1016/S0360-8352(01)00060-2, PII S0360835201000602
    • Shahabudeen P, Gopinath R, Krishnaiah K (2002) Design of bicriteria kanban system using simulated annealing technique. Comput Ind Eng 41(4):355-370 (Pubitemid 34040912)
    • (2002) Computers and Industrial Engineering , vol.41 , Issue.4 , pp. 355-370
    • Shahabudeen, P.1    Gopinath, R.2    Krishnaiah, K.3
  • 13
    • 0027684952 scopus 로고
    • The determination of the optimal number of kanbans in a JIT production system
    • Fukukawa T, Hong SC (1993) The determination of the optimal number of kanbans in a JIT production system. Comput Ind Eng 24(4):551-559
    • (1993) Comput Ind Eng , vol.24 , Issue.4 , pp. 551-559
    • Fukukawa, T.1    Hong, S.C.2
  • 14
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norcross (GA)
    • Monden Y (1983) The Toyota production system. Industrial Engineering and Management Press, Norcross (GA)
    • (1983) The Toyota Production System
    • Monden, Y.1
  • 15
    • 84952179325 scopus 로고
    • Design and analysis of pull system, A method of multi stage production control
    • Kimura O, Terada H (1981) Design and analysis of pull system, a method of multi stage production control. Int J Product Res 19 (3):241-253
    • (1981) Int J Product Res , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 16
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic kanban system
    • Bitran GR, Chang L (1987) A mathematical programming approach to a deterministic kanban system. Manag Sci 33(4):427-441
    • (1987) Manag Sci , vol.33 , Issue.4 , pp. 427-441
    • Bitran, G.R.1    Chang, L.2
  • 17
    • 0026153765 scopus 로고
    • Determining the number of kanban in a multiproduct multistage production system
    • Bard JF, Golany B (1991) Determining the number of kanban in a multiproduct multistage production system. Int J Product Res 29 (5):881-895
    • (1991) Int J Product Res , vol.29 , Issue.5 , pp. 881-895
    • Bard, J.F.1    Golany, B.2
  • 18
    • 0028439455 scopus 로고
    • Production planning for a multiitem, multi-stage kanban system
    • Mitwasi MG, Askin RG (1994) Production planning for a multiitem, multi-stage kanban system. Int J Product Res 32(5):1173-1195
    • (1994) Int J Product Res , vol.32 , Issue.5 , pp. 1173-1195
    • Mitwasi, M.G.1    Askin, R.G.2
  • 19
    • 0032089489 scopus 로고    scopus 로고
    • Adapting just-in-time manufacturing systems to preventive maintenance interruptions
    • Gupta SM, Al-Turki YAY (1998) Adapting JIT manufacturing systems to preventive maintenance interrupts. Product Plan Control 9(4):349-359 (Pubitemid 128625492)
    • (1998) Production Planning and Control , vol.9 , Issue.4 , pp. 349-359
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 20
    • 0030269796 scopus 로고    scopus 로고
    • Operations planning for kanbans between two adjacent workstations
    • Sarker BR, Balan CV (1996) Operations planning for kanbans between two adjacent workstations. Comput Ind Eng 31 (1-2):221-224 (Pubitemid 126380023)
    • (1996) Computers and Industrial Engineering , vol.31 , Issue.1-2 , pp. 221-224
    • Sarker, B.R.1    Balan, C.V.2
  • 21
    • 0031999406 scopus 로고    scopus 로고
    • Operations planning for a single-stage kanban system operating under linear demand
    • Sarker BR, Balan CV (1998) Operations planning for a singlestage kanban system operating under linear demand. Int J Product Res 36(2):357-375 (Pubitemid 128565055)
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 357-375
    • Sarker, B.R.1    Balan, C.V.2
  • 22
    • 0032708083 scopus 로고    scopus 로고
    • Operations planning for a multi-stage kanban system
    • Sarker BR, Balan CV (1999) Operations planning for a multi-stage kanban system. Eur J Oper Res 112(2):284-303
    • (1999) Eur J Oper Res , vol.112 , Issue.2 , pp. 284-303
    • Sarker, B.R.1    Balan, C.V.2
  • 23
    • 32544454181 scopus 로고    scopus 로고
    • Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
    • DOI 10.1016/j.ejor.2004.10.001, PII S0377221704007787
    • Wang S, Sarker BR (2006) Optimal model for a multi-stage supply chain system controlled by kanban under JIT philosophy. Eur J Oper Res 172(1):179-200 (Pubitemid 43234028)
    • (2006) European Journal of Operational Research , vol.172 , Issue.1 , pp. 179-200
    • Wang, S.1    Sarker, B.R.2
  • 24
    • 55349094633 scopus 로고    scopus 로고
    • Performance evaluation of SCM in JIT environment
    • Kojima M, Nakashima K, Ohno K (2008) Performance evaluation of SCM in JIT environment. Int J Product Econ 115(2):439-443
    • (2008) Int J Product Econ , vol.115 , Issue.2 , pp. 439-443
    • Kojima, M.1    Nakashima, K.2    Ohno, K.3
  • 25
    • 60849118080 scopus 로고    scopus 로고
    • Determination of number of kanbans in a supply chain system via Memetic algorithm
    • Rabbani M, Layegh J, Mohammad Ebrahim R (2009) Determination of number of kanbans in a supply chain system via Memetic algorithm. Adv Eng Softw 40(6):431-437
    • (2009) Adv Eng Softw , vol.40 , Issue.6 , pp. 431-437
    • Rabbani, M.1    Layegh, J.2    Mohammad Ebrahim, R.3
  • 26
    • 77951132551 scopus 로고    scopus 로고
    • Determining the optimal number of kanban in multi-products supply chain system
    • Widyadana GA, Wee HM, Chang JY (2010) Determining the optimal number of kanban in multi-products supply chain system. Int J Syst Sci 41(2):189-201
    • (2010) Int J Syst Sci , vol.41 , Issue.2 , pp. 189-201
    • Widyadana, G.A.1    Wee, H.M.2    Chang, J.Y.3
  • 27
    • 78951481949 scopus 로고    scopus 로고
    • Determination of the number of kanbans and batch sizes in a JIT supply chain system
    • Chaharsooghi SK, Sajedinejad A (2010) Determination of the number of kanbans and batch sizes in a JIT supply chain system. Sci Iran 17(2E):143-149
    • (2010) Sci Iran , vol.17 , Issue.2 E , pp. 143-149
    • Chaharsooghi, S.K.1    Sajedinejad, A.2
  • 28
    • 73349094349 scopus 로고    scopus 로고
    • The search for the optimal number of kanbans in unstable assembly-tree layout systems under intensive loading conditions
    • Lannone R, Miranda S, Riemma S (2009) The search for the optimal number of kanbans in unstable assembly-tree layout systems under intensive loading conditions. Int J Comput Integr Manuf 22(4):315-324
    • (2009) Int J Comput Integr Manuf , vol.22 , Issue.4 , pp. 315-324
    • Lannone, R.1    Miranda, S.2    Riemma, S.3
  • 29
    • 77951141667 scopus 로고    scopus 로고
    • A hybrid GAsimulation approach to improve JIT systems
    • Azadeh A, Ebrahimipour V, Bavar P (2010) A hybrid GAsimulation approach to improve JIT systems. Int J Product Res 48(8):2323-2344
    • (2010) Int J Product Res , vol.48 , Issue.8 , pp. 2323-2344
    • Azadeh, A.1    Ebrahimipour, V.2    Bavar, P.3
  • 30
    • 77954289368 scopus 로고    scopus 로고
    • Optimal batch size in a singlestage and optimal number of kanbans in a multi-stage JIT production-delivery system with rework consideration
    • Parveen M, Rao TVVLN (2010) Optimal batch size in a singlestage and optimal number of kanbans in a multi-stage JIT production-delivery system with rework consideration. Int J logist Syst manag 7(1):56-80
    • (2010) Int J Logist Syst Manag , vol.7 , Issue.1 , pp. 56-80
    • Parveen, M.1    Rao, T.V.V.L.N.2
  • 31
    • 79151483326 scopus 로고    scopus 로고
    • An integrated MOGA approach to determine the Pareto-optimal kanban number and size for a JIT system
    • Hou TH, Hu WC (2011) An integrated MOGA approach to determine the Pareto-optimal kanban number and size for a JIT system. Expert Syst Appl 38(5):5912-5918
    • (2011) Expert Syst Appl , vol.38 , Issue.5 , pp. 5912-5918
    • Hou, T.H.1    Hu, W.C.2
  • 32
    • 79956140753 scopus 로고    scopus 로고
    • Effects of imperfect products on lot sizing with work in process inventory
    • Barzoki MR, Jahanbazi M, Bijari M (2011) Effects of imperfect products on lot sizing with work in process inventory. Appl Math Comput 217(21):8328-8336
    • (2011) Appl Math Comput , vol.217 , Issue.21 , pp. 8328-8336
    • Barzoki, M.R.1    Jahanbazi, M.2    Bijari, M.3
  • 34
    • 54349091548 scopus 로고    scopus 로고
    • Optimal batch quantity models for a lean production system with in-cycle rework and scrap
    • Biswas P, Sarker BR (2008) Optimal batch quantity models for a lean production system with in-cycle rework and scrap. Int J Product Res 46(23):6585-6610
    • (2008) Int J Product Res , vol.46 , Issue.23 , pp. 6585-6610
    • Biswas, P.1    Sarker, B.R.2
  • 35
    • 63549134363 scopus 로고    scopus 로고
    • Optimal jit production and delivery lot size model that considers vendor reworking process and variable setup cost
    • Chiu Y, Chang CY (2009) Optimal jit production and delivery lot size model that considers vendor reworking process and variable setup cost. J Chin Inst Ind Eng 26(2):99-108
    • (2009) J Chin Inst Ind Eng , vol.26 , Issue.2 , pp. 99-108
    • Chiu, Y.1    Chang, C.Y.2
  • 36
    • 77749271490 scopus 로고    scopus 로고
    • Hybrid Taguchi-harmony search algorithm for solving engineering optimization problems
    • Yildiz AR (2008) Hybrid Taguchi-harmony search algorithm for solving engineering optimization problems. Int J Ind Eng Theory, Appl Pract 15(3):286-293
    • (2008) Int J Ind Eng Theory, Appl Pract , vol.15 , Issue.3 , pp. 286-293
    • Yildiz, A.R.1
  • 37
    • 59749087555 scopus 로고    scopus 로고
    • A novel particle swarm optimization approach for product design and manufacturing
    • Yildiz AR (2009) A novel particle swarm optimization approach for product design and manufacturing. Int J Adv Manuf Technol 40 (5-6):617-628
    • (2009) Int J Adv Manuf Technol , vol.40 , Issue.5-6 , pp. 617-628
    • Yildiz, A.R.1
  • 38
    • 64849115856 scopus 로고    scopus 로고
    • Hybrid immune-simulated annealing algorithm for optimal design and manufacturing
    • Yildiz AR (2009) Hybrid immune-simulated annealing algorithm for optimal design and manufacturing. Int J Mater Prod Technol 34 (3):217-226
    • (2009) Int J Mater Prod Technol , vol.34 , Issue.3 , pp. 217-226
    • Yildiz, A.R.1
  • 39
    • 69349099465 scopus 로고    scopus 로고
    • A new design optimization framework based on immune algorithm and Taguchi method
    • Yildiz AR (2009) A new design optimization framework based on immune algorithm and Taguchi method. Comput Ind 60(8):613-620
    • (2009) Comput Ind , vol.60 , Issue.8 , pp. 613-620
    • Yildiz, A.R.1
  • 40
    • 63749123634 scopus 로고    scopus 로고
    • A novel hybrid immune algorithm for global optimization in design and manufacturing
    • Yildiz AR (2009) A novel hybrid immune algorithm for global optimization in design and manufacturing. Robotics Comput Integr Manuf 25(2):261-270
    • (2009) Robotics Comput Integr Manuf , vol.25 , Issue.2 , pp. 261-270
    • Yildiz, A.R.1
  • 41
    • 79956102176 scopus 로고    scopus 로고
    • An effective hybrid immune-hill climbing optimization approach for solving design and manufacturing optimization problems in industry
    • Yildiz AR (2009) An effective hybrid immune-hill climbing optimization approach for solving design and manufacturing optimization problems in industry. J Mater Process Technol 50(4):224-228
    • (2009) J Mater Process Technol , vol.50 , Issue.4 , pp. 224-228
    • Yildiz, A.R.1
  • 42
    • 78651313263 scopus 로고    scopus 로고
    • Topology synthesis of multicomponent structural assemblies in
    • continuum domains
    • Yildiz AR, Saitou K (2011) Topology synthesis of multicomponent structural assemblies in continuum domains. ASME J Mech Des 133:1
    • (2011) ASME J Mech des , vol.133 , pp. 1
    • Yildiz, A.R.1    Saitou, K.2
  • 45
    • 0037291006 scopus 로고    scopus 로고
    • A hybrid particle swarm optimization for distribution state estimation
    • Shigenori N, Takamu GJ, Toshiki Y, Yoshikazu F (2003) A hybrid particle swarm optimization for distribution state estimation. IEEE Trans Power Syst 18(1):60-68
    • (2003) IEEE Trans Power Syst , vol.18 , Issue.1 , pp. 60-68
    • Shigenori, N.1    Takamu, G.J.2    Toshiki, Y.3    Yoshikazu, F.4
  • 47
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick S, Gelatt CD, Veechi MP (1983) Optimization by simulated annealing. Sci 220(4598):671-679
    • (1983) Sci , vol.220 , Issue.4598 , pp. 671-679
    • Kirkpatrick, S.1    Gelatt, C.D.2    Veechi, M.P.3
  • 49
    • 34548850594 scopus 로고    scopus 로고
    • A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system
    • DOI 10.1016/j.ejor.2006.12.058, PII S0377221707000811
    • Safaei N, Saidi-Mehrabad M, Jabal-Ameli MS (2008) A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system. Eur J Oper Res 185(2):563-592 (Pubitemid 47446037)
    • (2008) European Journal of Operational Research , vol.185 , Issue.2 , pp. 563-592
    • Safaei, N.1    Saidi-Mehrabad, M.2    Jabal-Ameli, M.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.