메뉴 건너뛰기




Volumn 17, Issue 2, 2008, Pages 230-240

Lot sizing with non-zero setup times for rework

Author keywords

Inventory control; Lot scheduling; Production control; Rework

Indexed keywords

COMPUTER NETWORKS; DYNAMIC PROGRAMMING; INDUSTRIAL ENGINEERING; PAPER; SCHEDULING; SCHEDULING ALGORITHMS; SYSTEMS ENGINEERING; TECHNOLOGY;

EID: 45849091113     PISSN: 10043756     EISSN: None     Source Type: Journal    
DOI: 10.1007/s11518-008-5077-7     Document Type: Conference Paper
Times cited : (31)

References (22)
  • 1
    • 84974858098 scopus 로고
    • Production runs for multiple products: The full-capacity heuristic
    • Cook, W.D., Saipe, A.L. & Seiford, L.M. (1980). Production runs for multiple products: the full-capacity heuristic. Journal of Operations Research, 31: 405-412
    • (1980) Journal of Operations Research , vol.31 , pp. 405-412
    • Cook, W.D.1    Saipe, A.L.2    Seiford, L.M.3
  • 2
    • 0023420909 scopus 로고
    • The economic lotscheduling problem: Achieving feasibility using time varying lot-sizes
    • 5
    • Dobson, G. (1987). The economic lotscheduling problem: achieving feasibility using time varying lot-sizes. Journal of Operations Research, 35 (5): 764-771
    • (1987) Journal of Operations Research , vol.35 , pp. 764-771
    • Dobson, G.1
  • 3
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • 6
    • Elmaghraby, S.F. (1978). The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24 (6): 587-598
    • (1978) Management Science , vol.24 , pp. 587-598
    • Elmaghraby, S.F.1
  • 4
    • 0031069125 scopus 로고    scopus 로고
    • Complexity of the ELSP with general cyclic schedules
    • Gallego, G. & Shaw, D.X. (1997). Complexity of the ELSP with general cyclic schedules. IIE Transaction, 29: 109-113
    • (1997) IIE Transaction , vol.29 , pp. 109-113
    • Gallego, G.1    Shaw, D.X.2
  • 5
    • 0026930528 scopus 로고
    • Feasibility of scheduling lot sizes of these products on one machine
    • 10
    • Glass, C.A. (1992). Feasibility of scheduling lot sizes of these products on one machine. Management Science, 18 (10): 1482-1495
    • (1992) Management Science , vol.18 , pp. 1482-1495
    • Glass, C.A.1
  • 7
    • 12344300934 scopus 로고
    • On the deterministic demand multi-product single machine for scheduling problem
    • Graves, S.C. (1979). On the deterministic demand multi-product single machine for scheduling problem. Management Science, 25: 276-280
    • (1979) Management Science , vol.25 , pp. 276-280
    • Graves, S.C.1
  • 8
    • 40649108465 scopus 로고
    • A heuristic for zero setup cost lot sizing and scheduling problems
    • 27-28, October 1986, Miami, Florida, USA
    • Gunter, S.I. & Swanson, L.A. (1986). A heuristic for zero setup cost lot sizing and scheduling problems. In: ORSA-TIMS Conference, 27-28, October 1986, Miami, Florida, USA
    • (1986) ORSA-TIMS Conference
    • Gunter, S.I.1    Swanson, L.A.2
  • 9
    • 0018724120 scopus 로고
    • An improved extended basic period procedure for solving the economic lot scheduling problem
    • Haessler, R.W. (1979). An improved extended basic period procedure for solving the economic lot scheduling problem. AIIE Transaction, 11: 336-340
    • (1979) AIIE Transaction , vol.11 , pp. 336-340
    • Haessler, R.W.1
  • 10
    • 0029274119 scopus 로고
    • Optimum common cycle for scheduling a single machine multi-product system with a budgetary constraint
    • 2
    • Haji, R. & Mansuri, M. (1995). Optimum common cycle for scheduling a single machine multi-product system with a budgetary constraint. Production Planning & Control, 6 (2): 151-156
    • (1995) Production Planning & Control , vol.6 , pp. 151-156
    • Haji, R.1    Mansuri, M.2
  • 13
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality item produced
    • 6
    • Hayek, P.A. & Salameh, M.K. (2001). Production lot sizing with the reworking of imperfect quality item produced. Production Planning and Control, 12 (6): 584-590
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 14
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with network process at a single-stage production system
    • Jamal, A.M.M., Sarker, B.R. & Mondel, S. (2004). Optimal manufacturing batch size with network process at a single-stage production system. Computers & Industrial Engineering, 47: 77-89
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondel, S.3
  • 16
    • 0024619851 scopus 로고
    • When is the economic lot scheduling problem easy?
    • Jones, P.C. & Inmann, R.R. (1989). When is the economic lot scheduling problem easy? IIE Transactions, 21: 11-20
    • (1989) IIE Transactions , vol.21 , pp. 11-20
    • Jones, P.C.1    Inmann, R.R.2
  • 17
    • 0001012373 scopus 로고
    • Lot sizing to reduce capacity utilization in production process with defective item, process corrections, and rework
    • 9
    • Lee, H.L. (1992). Lot sizing to reduce capacity utilization in production process with defective item, process corrections, and rework. Management Science, 38 (9): 1314-1328
    • (1992) Management Science , vol.38 , pp. 1314-1328
    • Lee, H.L.1
  • 18
    • 0031237390 scopus 로고    scopus 로고
    • Optimal batch size and investment in multistage production systems with scrap
    • 6
    • Lee, H.L., Chandra, M.J. & Deleveaux, V. J. (1997). Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control, 8 (6): 586-596
    • (1997) Production Planning and Control , vol.8 , pp. 586-596
    • Lee, H.L.1    Chandra, M.J.2    Deleveaux, V.J.3
  • 19
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • 1
    • Lee, H.L. & Rosenblat, M.J. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18 (1): 48-55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Lee, H.L.1    Rosenblat, M.J.2
  • 20
    • 0021581827 scopus 로고
    • A stepwise partial enumeration algorithm for the economic lot scheduling problem
    • 4
    • Park, K.S. & Yun, D.K. (1988). A stepwise partial enumeration algorithm for the economic lot scheduling problem. IIE Transactions, 16 (4): 363-370
    • (1988) IIE Transactions , vol.16 , pp. 363-370
    • Park, K.S.1    Yun, D.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.