-
1
-
-
84974858098
-
Production runs for multiple products: The full-capacity heuristic
-
Cook, W.D., Saipe, A.L. & Seiford, L.M. (1980). Production runs for multiple products: the full-capacity heuristic. Journal of Operations Research, 31: 405-412
-
(1980)
Journal of Operations Research
, vol.31
, pp. 405-412
-
-
Cook, W.D.1
Saipe, A.L.2
Seiford, L.M.3
-
2
-
-
0023420909
-
The economic lotscheduling problem: Achieving feasibility using time varying lot-sizes
-
5
-
Dobson, G. (1987). The economic lotscheduling problem: achieving feasibility using time varying lot-sizes. Journal of Operations Research, 35 (5): 764-771
-
(1987)
Journal of Operations Research
, vol.35
, pp. 764-771
-
-
Dobson, G.1
-
3
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
6
-
Elmaghraby, S.F. (1978). The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24 (6): 587-598
-
(1978)
Management Science
, vol.24
, pp. 587-598
-
-
Elmaghraby, S.F.1
-
4
-
-
0031069125
-
Complexity of the ELSP with general cyclic schedules
-
Gallego, G. & Shaw, D.X. (1997). Complexity of the ELSP with general cyclic schedules. IIE Transaction, 29: 109-113
-
(1997)
IIE Transaction
, vol.29
, pp. 109-113
-
-
Gallego, G.1
Shaw, D.X.2
-
5
-
-
0026930528
-
Feasibility of scheduling lot sizes of these products on one machine
-
10
-
Glass, C.A. (1992). Feasibility of scheduling lot sizes of these products on one machine. Management Science, 18 (10): 1482-1495
-
(1992)
Management Science
, vol.18
, pp. 1482-1495
-
-
Glass, C.A.1
-
7
-
-
12344300934
-
On the deterministic demand multi-product single machine for scheduling problem
-
Graves, S.C. (1979). On the deterministic demand multi-product single machine for scheduling problem. Management Science, 25: 276-280
-
(1979)
Management Science
, vol.25
, pp. 276-280
-
-
Graves, S.C.1
-
8
-
-
40649108465
-
A heuristic for zero setup cost lot sizing and scheduling problems
-
27-28, October 1986, Miami, Florida, USA
-
Gunter, S.I. & Swanson, L.A. (1986). A heuristic for zero setup cost lot sizing and scheduling problems. In: ORSA-TIMS Conference, 27-28, October 1986, Miami, Florida, USA
-
(1986)
ORSA-TIMS Conference
-
-
Gunter, S.I.1
Swanson, L.A.2
-
9
-
-
0018724120
-
An improved extended basic period procedure for solving the economic lot scheduling problem
-
Haessler, R.W. (1979). An improved extended basic period procedure for solving the economic lot scheduling problem. AIIE Transaction, 11: 336-340
-
(1979)
AIIE Transaction
, vol.11
, pp. 336-340
-
-
Haessler, R.W.1
-
10
-
-
0029274119
-
Optimum common cycle for scheduling a single machine multi-product system with a budgetary constraint
-
2
-
Haji, R. & Mansuri, M. (1995). Optimum common cycle for scheduling a single machine multi-product system with a budgetary constraint. Production Planning & Control, 6 (2): 151-156
-
(1995)
Production Planning & Control
, vol.6
, pp. 151-156
-
-
Haji, R.1
Mansuri, M.2
-
11
-
-
45849089260
-
Economic production quantity with accumulated rework
-
Taiwan, China
-
Haji, R., Rahmati Tavakol, A. & Haji, B. (2006). Economic production quantity with accumulated rework. In: 36th CIE Conference on Computers and Industrial Engineering, 4196-4203, Taiwan, China
-
(2006)
36th CIE Conference on Computers and Industrial Engineering
, pp. 4196-4203
-
-
Haji, R.1
Rahmati Tavakol, A.2
Haji, B.3
-
13
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality item produced
-
6
-
Hayek, P.A. & Salameh, M.K. (2001). Production lot sizing with the reworking of imperfect quality item produced. Production Planning and Control, 12 (6): 584-590
-
(2001)
Production Planning and Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
14
-
-
3242701287
-
Optimal manufacturing batch size with network process at a single-stage production system
-
Jamal, A.M.M., Sarker, B.R. & Mondel, S. (2004). Optimal manufacturing batch size with network process at a single-stage production system. Computers & Industrial Engineering, 47: 77-89
-
(2004)
Computers & Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondel, S.3
-
16
-
-
0024619851
-
When is the economic lot scheduling problem easy?
-
Jones, P.C. & Inmann, R.R. (1989). When is the economic lot scheduling problem easy? IIE Transactions, 21: 11-20
-
(1989)
IIE Transactions
, vol.21
, pp. 11-20
-
-
Jones, P.C.1
Inmann, R.R.2
-
17
-
-
0001012373
-
Lot sizing to reduce capacity utilization in production process with defective item, process corrections, and rework
-
9
-
Lee, H.L. (1992). Lot sizing to reduce capacity utilization in production process with defective item, process corrections, and rework. Management Science, 38 (9): 1314-1328
-
(1992)
Management Science
, vol.38
, pp. 1314-1328
-
-
Lee, H.L.1
-
18
-
-
0031237390
-
Optimal batch size and investment in multistage production systems with scrap
-
6
-
Lee, H.L., Chandra, M.J. & Deleveaux, V. J. (1997). Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control, 8 (6): 586-596
-
(1997)
Production Planning and Control
, vol.8
, pp. 586-596
-
-
Lee, H.L.1
Chandra, M.J.2
Deleveaux, V.J.3
-
19
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
1
-
Lee, H.L. & Rosenblat, M.J. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18 (1): 48-55
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Lee, H.L.1
Rosenblat, M.J.2
-
20
-
-
0021581827
-
A stepwise partial enumeration algorithm for the economic lot scheduling problem
-
4
-
Park, K.S. & Yun, D.K. (1988). A stepwise partial enumeration algorithm for the economic lot scheduling problem. IIE Transactions, 16 (4): 363-370
-
(1988)
IIE Transactions
, vol.16
, pp. 363-370
-
-
Park, K.S.1
Yun, D.K.2
|