메뉴 건너뛰기




Volumn 17, Issue 2 E, 2010, Pages 143-149

Determination of the number of kanbans and batch sizes in a JIT supply chain system

Author keywords

Batch size; JIT; Kanban; Stochastic demand; Supply chain

Indexed keywords

JUST IN TIME PRODUCTION; STOCHASTIC SYSTEMS; SUPPLY CHAINS;

EID: 78951481949     PISSN: 10263098     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (6)

References (12)
  • 1
    • 34248550363 scopus 로고    scopus 로고
    • Defining and developing measures of lean production
    • Shah, R. and Ward, P.T. "Defining and developing measures of lean production", Journal of Operations Management, 25, pp. 785-805 (2007).
    • (2007) Journal of Operations Management , vol.25 , pp. 785-805
    • Shah, R.1    Ward, P.T.2
  • 2
    • 0344240982 scopus 로고    scopus 로고
    • Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
    • Naylor, J.B., Nairn, M.M. and Berry, D. "Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain", Int. J. Production Economics, 62, pp. 107-118 (1999).
    • (1999) Int. J. Production Economics , vol.62 , pp. 107-118
    • Naylor, J.B.1    Nairn, M.M.2    Berry, D.3
  • 3
    • 0033225131 scopus 로고    scopus 로고
    • An overview of design and operational issues of kanban systems
    • Akturk, M.S. and Erhun, F. "An overview of design and operational issues of kanban systems", Int. J. Prod. Res., 37(17), pp. 3859-3881 (1999).
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.17 , pp. 3859-3881
    • Akturk, M.S.1    Erhun, F.2
  • 4
    • 34249950138 scopus 로고    scopus 로고
    • An empirical analysis of just-in-time production in Japanese manufacturing companies
    • Matsui, Y. "An empirical analysis of just-in-time production in Japanese manufacturing companies", Int. J. Production Economics, 108, pp. 153-164 (2007).
    • (2007) Int. J. Production Economics , vol.108 , pp. 153-164
    • Matsui, Y.1
  • 5
    • 56949099428 scopus 로고    scopus 로고
    • Optimizing inventory decisions in a multi-stage supply chain under stochastic demands
    • Seliaman, M.E. and Ahmad, A.R. "Optimizing inventory decisions in a multi-stage supply chain under stochastic demands", Applied Mathematics and Computation, 206, pp. 538-542 (2008).
    • (2008) Applied Mathematics and Computation , vol.206 , pp. 538-542
    • Seliaman, M.E.1    Ahmad, A.R.2
  • 6
    • 0000939673 scopus 로고
    • Optimal numbers of two kinds of kanbans in a JIT production system
    • Ohno, K., Nakashima, K. and Kojima, M. "Optimal numbers of two kinds of kanbans in a JIT production system", International Journal of Production Research, 33(5), pp. 1387-1401 (1995).
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1387-1401
    • Ohno, K.1    Nakashima, K.2    Kojima, M.3
  • 7
    • 8344220512 scopus 로고    scopus 로고
    • An assembly-type supply chain system controlled by kanbans under a just-intime delivery policy
    • Wang, S. and Sarker, B.R. "An assembly-type supply chain system controlled by kanbans under a just-intime delivery policy", European Journal of Operational Research, 162, pp. 153-172 (2005).
    • (2005) European Journal of Operational Research , vol.162 , pp. 153-172
    • Wang, S.1    Sarker, B.R.2
  • 8
    • 32544454181 scopus 로고    scopus 로고
    • Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
    • Wang, S. and Sarker, B.R. "Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy", European Journal of Operational Research, 172, pp. 179-200 (2006).
    • (2006) European Journal of Operational Research , vol.172 , pp. 179-200
    • Wang, S.1    Sarker, B.R.2
  • 9
    • 60849118080 scopus 로고    scopus 로고
    • Determination of number of kanbans in a supply chain system via Memetic algorithm
    • June
    • Rabbani, M., Layegh, J. and Ebrahim, R.M. "Determination of number of kanbans in a supply chain system via Memetic algorithm", Advances in Engineering Software, 40(6), pp. 431-437 (June 2009).
    • (2009) Advances in Engineering Software , vol.40 , Issue.6 , pp. 431-437
    • Rabbani, M.1    Layegh, J.2    Ebrahim, R.M.3
  • 10
    • 60649099168 scopus 로고    scopus 로고
    • An inventory model with partial backordering and unit backorder cost linearly increasing with the waiting time
    • Sept.
    • Hu, W., Kim, S. and Banerjee, A. "An inventory model with partial backordering and unit backorder cost linearly increasing with the waiting time", European J. of Operational Res., 197(2), pp. 581-587 (Sept. 2009).
    • (2009) European J. of Operational Res. , vol.197 , Issue.2 , pp. 581-587
    • Hu, W.1    Kim, S.2    Banerjee, A.3
  • 11
    • 55349094633 scopus 로고    scopus 로고
    • Performance evaluation of SCM in JIT environment
    • Kojima, M., Nakashima, K. and Ohno, K. "Performance evaluation of SCM in JIT environment", Int. J. Production Economics, 115, pp. 439-443 (2008).
    • (2008) Int. J. Production Economics , vol.115 , pp. 439-443
    • Kojima, M.1    Nakashima, K.2    Ohno, K.3
  • 12
    • 56049116738 scopus 로고    scopus 로고
    • Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm
    • Sharma, S. and Agrawal, N. "Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm", Computers & Operations Research, pp. 1622-1632 (2009).
    • (2009) Computers & Operations Research , pp. 1622-1632
    • Sharma, S.1    Agrawal, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.