-
1
-
-
0027654294
-
A systematic simulation approach for the design of JIT manufacturing systems
-
Abdou, G., & Dutta, S. P. (1993). A systematic simulation approach for the design of JIT manufacturing systems. Journal of Operations Management, 11, 225-238.
-
(1993)
Journal of Operations Management
, vol.11
, pp. 225-238
-
-
Abdou, G.1
Dutta, S.P.2
-
2
-
-
3543081615
-
Trade off between maximizing throughput rate and minimizing system time in kanban systems
-
Andijani, A. (1997). Trade off between maximizing throughput rate and minimizing system time in kanban systems. International Journal of Operations and Productions Management, 17, 429-445.
-
(1997)
International Journal of Operations and Productions Management
, vol.17
, pp. 429-445
-
-
Andijani, A.1
-
3
-
-
0026153765
-
Determining the number of kanbans in a multiproduct multistage production system
-
Bard, J. F., & Golany, B (1991). Determining the number of kanbans in a multiproduct multistage production system. International Journal of Production Research, 29, 881-895.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 881-895
-
-
Bard, J.F.1
Golany, B.2
-
4
-
-
84986958388
-
A review of the kanban production control research literature
-
Berkley, B. J. (1992). A review of the kanban production control research literature. Production and Operations Management, 1, 393-411.
-
(1992)
Production and Operations Management
, vol.1
, pp. 393-411
-
-
Berkley, B.J.1
-
5
-
-
84985774777
-
A decomposition approximation for periodic kanban controlled flow shops
-
Berkley, B. J. (1992). A decomposition approximation for periodic kanban controlled flow shops. Decision Sciences, 23, 291-311.
-
(1992)
Decision Sciences
, vol.23
, pp. 291-311
-
-
Berkley, B.J.1
-
6
-
-
84990578213
-
Simulation tests of FCFS and SPT sequencing in kanban systems
-
Berkley, B. J. (1993). Simulation tests of FCFS and SPT sequencing in kanban systems. Decision Sciences, 24, 218-226.
-
(1993)
Decision Sciences
, vol.24
, pp. 218-226
-
-
Berkley, B.J.1
-
7
-
-
0028201993
-
Testing minimum performance levels for kanban-controlled lines
-
Berkley, B. J. (1994). Testing minimum performance levels for kanban-controlled lines. International Journal of Production Research, 32, 93-109.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 93-109
-
-
Berkley, B.J.1
-
8
-
-
0030401255
-
A simulation study of container size in two-card kanban system
-
Berkley, B. J. (1996). A simulation study of container size in two-card kanban system. International Journal of Production Research, 34, 3417-3445.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 3417-3445
-
-
Berkley, B.J.1
-
9
-
-
84985803928
-
A simulation study of sequencing rules in a kanban - Controlled flow shop
-
Berkley, B. J., & Kiran, A. S. (1991). A simulation study of sequencing rules in a kanban - Controlled flow shop. Decision Sciences, 22, 559-582.
-
(1991)
Decision Sciences
, vol.22
, pp. 559-582
-
-
Berkley, B.J.1
Kiran, A.S.2
-
10
-
-
0023330726
-
A mathematical programming approach to a deterministic kanban system
-
Bitran, G. R., & Chang (1987). A mathematical programming approach to a deterministic kanban system. Management Sciences, 33, 427-441.
-
(1987)
Management Sciences
, vol.33
, pp. 427-441
-
-
Bitran, G.R.1
Chang2
-
11
-
-
0021819411
-
A thermodynamical approach to the travelling salesman problem: An efficient simulated algorithm
-
Cerny, V. (1985). A thermodynamical approach to the travelling salesman problem: An efficient simulated algorithm. Journal of Optimization Theory and Application, 45, 41-51.
-
(1985)
Journal of Optimization Theory and Application
, vol.45
, pp. 41-51
-
-
Cerny, V.1
-
12
-
-
0000436165
-
Kanban controlled pull systems: An analytic approach
-
Deleersnyder, J., Hodgson, T. J., Muller, H., & O'Grady, P. J. (1989). Kanban controlled pull systems: An analytic approach. Management Science, 35, 1079-1091.
-
(1989)
Management Science
, vol.35
, pp. 1079-1091
-
-
Deleersnyder, J.1
Hodgson, T.J.2
Muller, H.3
O'Grady, P.J.4
-
13
-
-
0025449198
-
Simulated annealing: A tool for operational research
-
Eglese, R. W. (1989). Simulated annealing: A tool for operational research. European Journal of Operational Research, 46, 271-281.
-
(1989)
European Journal of Operational Research
, vol.46
, pp. 271-281
-
-
Eglese, R.W.1
-
14
-
-
0027684952
-
The determination of optimum number of kanbans in a just in time production system
-
Fukukawa, T., & Hong, S. C. (1993). The determination of optimum number of kanbans in a just in time production system. Computers and Industrial Engineering, 24, 551-559.
-
(1993)
Computers and Industrial Engineering
, vol.24
, pp. 551-559
-
-
Fukukawa, T.1
Hong, S.C.2
-
16
-
-
0007644458
-
Visual interactive modelling shows how to use Kanban in small business
-
Gravel, M., & Price, W. L. (1991). Visual interactive modelling shows how to use Kanban in small business. Interfacess (ORAS/ TIMS), 21, 22-24.
-
(1991)
Interfacess (ORAS/ TIMS)
, vol.21
, pp. 22-24
-
-
Gravel, M.1
Price, W.L.2
-
17
-
-
0032089489
-
Adapting just-in-time manufacturing systems to preventive maintenance interrupts
-
Gupta, S. M., & Al-Turki, Y. A. Y. (1998). Adapting just-in-time manufacturing systems to preventive maintenance interrupts. Production Planning and Control, 9, 349-359.
-
(1998)
Production Planning and Control
, vol.9
, pp. 349-359
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
18
-
-
0009186505
-
-
Madras: Productivity Press (India) (P) Ltd.
-
Hutchins, D. (1993). Just in time, Madras: Productivity Press (India) (P) Ltd.
-
(1993)
Just in Time
-
-
Hutchins, D.1
-
19
-
-
84952179325
-
Design and analysis of pull system, a method of multi stage production control
-
Kimura, O., & Terada, H. (1981). Design and analysis of pull system, a method of multi stage production control. International Journal of Production Research, 19, 241-253.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 241-253
-
-
Kimura, O.1
Terada, H.2
-
20
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatti Jr, C. D., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatti Jr., C.D.2
Vecchi, M.P.3
-
21
-
-
0028439455
-
Production planning for a multi-item, single stage kanban system
-
Mitwasi, M. G., & Askin, R. G. (1994). Production planning for a multi-item, single stage kanban system. International Journal of Production Research, 32, 1173-1195.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1173-1195
-
-
Mitwasi, M.G.1
Askin, R.G.2
-
22
-
-
0031641970
-
Optimum number of kanbans between two adjacent stations
-
Nori, V. S., & Sarker, B. R. (1998). Optimum number of kanbans between two adjacent stations. Production Planning and Control, 9, 60-65.
-
(1998)
Production Planning and Control
, vol.9
, pp. 60-65
-
-
Nori, V.S.1
Sarker, B.R.2
-
24
-
-
0028429481
-
Review of optimisation models of kanban based production systems
-
Price, W., Gravel, M., & Nsakanda, A. L. A. (1994). Review of optimisation models of kanban based production systems. European Journal of Operations Research, 75, 1-12.
-
(1994)
European Journal of Operations Research
, vol.75
, pp. 1-12
-
-
Price, W.1
Gravel, M.2
Nsakanda, A.L.A.3
-
25
-
-
0001674548
-
Modelling the performance of a kanban assembly shop
-
Price, W., Gravel, M., Nsakanda, A. L., & Cantin, F. (1995). Modelling the performance of a kanban assembly shop. International Journal of Production Research, 33, 1171-1177.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1171-1177
-
-
Price, W.1
Gravel, M.2
Nsakanda, A.L.3
Cantin, F.4
-
26
-
-
0030269846
-
Effects of kanban withdrawal policies and other factors on the performance of JIT system - A simulation study
-
Savsar, M. (1996). Effects of kanban withdrawal policies and other factors on the performance of JIT system - A simulation study. International Journal of Production Research, 34, 2879-2899.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2879-2899
-
-
Savsar, M.1
-
27
-
-
0027814376
-
Scheduling in a cellular manufacturing system: A simulated annealing approach
-
Sridhar, J., & Rajendran, C. (1993). Scheduling in a cellular manufacturing system: A simulated annealing approach. International Journal of Production Research, 31, 2927-2945.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2927-2945
-
-
Sridhar, J.1
Rajendran, C.2
-
28
-
-
0026374299
-
Optimum number of kanbans between two adjacent workstations in a JIT system
-
Wang, H., & Wang, H. (1991). Optimum number of kanbans between two adjacent workstations in a JIT system. International Journal of Production Economics, 22, 179-188.
-
(1991)
International Journal of Production Economics
, vol.22
, pp. 179-188
-
-
Wang, H.1
Wang, H.2
|