메뉴 건너뛰기




Volumn 41, Issue 4, 2002, Pages 355-370

Design of bi-criteria kanban system using simulated annealing technique

Author keywords

Kanban; Simulated annealing

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; PERTURBATION TECHNIQUES; SIMULATED ANNEALING; THROUGHPUT;

EID: 0036466891     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(01)00060-2     Document Type: Article
Times cited : (26)

References (28)
  • 1
    • 0027654294 scopus 로고
    • A systematic simulation approach for the design of JIT manufacturing systems
    • Abdou, G., & Dutta, S. P. (1993). A systematic simulation approach for the design of JIT manufacturing systems. Journal of Operations Management, 11, 225-238.
    • (1993) Journal of Operations Management , vol.11 , pp. 225-238
    • Abdou, G.1    Dutta, S.P.2
  • 2
    • 3543081615 scopus 로고    scopus 로고
    • Trade off between maximizing throughput rate and minimizing system time in kanban systems
    • Andijani, A. (1997). Trade off between maximizing throughput rate and minimizing system time in kanban systems. International Journal of Operations and Productions Management, 17, 429-445.
    • (1997) International Journal of Operations and Productions Management , vol.17 , pp. 429-445
    • Andijani, A.1
  • 3
    • 0026153765 scopus 로고
    • Determining the number of kanbans in a multiproduct multistage production system
    • Bard, J. F., & Golany, B (1991). Determining the number of kanbans in a multiproduct multistage production system. International Journal of Production Research, 29, 881-895.
    • (1991) International Journal of Production Research , vol.29 , pp. 881-895
    • Bard, J.F.1    Golany, B.2
  • 4
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J. (1992). A review of the kanban production control research literature. Production and Operations Management, 1, 393-411.
    • (1992) Production and Operations Management , vol.1 , pp. 393-411
    • Berkley, B.J.1
  • 5
    • 84985774777 scopus 로고
    • A decomposition approximation for periodic kanban controlled flow shops
    • Berkley, B. J. (1992). A decomposition approximation for periodic kanban controlled flow shops. Decision Sciences, 23, 291-311.
    • (1992) Decision Sciences , vol.23 , pp. 291-311
    • Berkley, B.J.1
  • 6
    • 84990578213 scopus 로고
    • Simulation tests of FCFS and SPT sequencing in kanban systems
    • Berkley, B. J. (1993). Simulation tests of FCFS and SPT sequencing in kanban systems. Decision Sciences, 24, 218-226.
    • (1993) Decision Sciences , vol.24 , pp. 218-226
    • Berkley, B.J.1
  • 7
    • 0028201993 scopus 로고
    • Testing minimum performance levels for kanban-controlled lines
    • Berkley, B. J. (1994). Testing minimum performance levels for kanban-controlled lines. International Journal of Production Research, 32, 93-109.
    • (1994) International Journal of Production Research , vol.32 , pp. 93-109
    • Berkley, B.J.1
  • 8
    • 0030401255 scopus 로고    scopus 로고
    • A simulation study of container size in two-card kanban system
    • Berkley, B. J. (1996). A simulation study of container size in two-card kanban system. International Journal of Production Research, 34, 3417-3445.
    • (1996) International Journal of Production Research , vol.34 , pp. 3417-3445
    • Berkley, B.J.1
  • 9
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a kanban - Controlled flow shop
    • Berkley, B. J., & Kiran, A. S. (1991). A simulation study of sequencing rules in a kanban - Controlled flow shop. Decision Sciences, 22, 559-582.
    • (1991) Decision Sciences , vol.22 , pp. 559-582
    • Berkley, B.J.1    Kiran, A.S.2
  • 10
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic kanban system
    • Bitran, G. R., & Chang (1987). A mathematical programming approach to a deterministic kanban system. Management Sciences, 33, 427-441.
    • (1987) Management Sciences , vol.33 , pp. 427-441
    • Bitran, G.R.1    Chang2
  • 11
    • 0021819411 scopus 로고
    • A thermodynamical approach to the travelling salesman problem: An efficient simulated algorithm
    • Cerny, V. (1985). A thermodynamical approach to the travelling salesman problem: An efficient simulated algorithm. Journal of Optimization Theory and Application, 45, 41-51.
    • (1985) Journal of Optimization Theory and Application , vol.45 , pp. 41-51
    • Cerny, V.1
  • 13
    • 0025449198 scopus 로고
    • Simulated annealing: A tool for operational research
    • Eglese, R. W. (1989). Simulated annealing: A tool for operational research. European Journal of Operational Research, 46, 271-281.
    • (1989) European Journal of Operational Research , vol.46 , pp. 271-281
    • Eglese, R.W.1
  • 14
    • 0027684952 scopus 로고
    • The determination of optimum number of kanbans in a just in time production system
    • Fukukawa, T., & Hong, S. C. (1993). The determination of optimum number of kanbans in a just in time production system. Computers and Industrial Engineering, 24, 551-559.
    • (1993) Computers and Industrial Engineering , vol.24 , pp. 551-559
    • Fukukawa, T.1    Hong, S.C.2
  • 16
    • 0007644458 scopus 로고
    • Visual interactive modelling shows how to use Kanban in small business
    • Gravel, M., & Price, W. L. (1991). Visual interactive modelling shows how to use Kanban in small business. Interfacess (ORAS/ TIMS), 21, 22-24.
    • (1991) Interfacess (ORAS/ TIMS) , vol.21 , pp. 22-24
    • Gravel, M.1    Price, W.L.2
  • 17
    • 0032089489 scopus 로고    scopus 로고
    • Adapting just-in-time manufacturing systems to preventive maintenance interrupts
    • Gupta, S. M., & Al-Turki, Y. A. Y. (1998). Adapting just-in-time manufacturing systems to preventive maintenance interrupts. Production Planning and Control, 9, 349-359.
    • (1998) Production Planning and Control , vol.9 , pp. 349-359
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 18
    • 0009186505 scopus 로고
    • Madras: Productivity Press (India) (P) Ltd.
    • Hutchins, D. (1993). Just in time, Madras: Productivity Press (India) (P) Ltd.
    • (1993) Just in Time
    • Hutchins, D.1
  • 19
    • 84952179325 scopus 로고
    • Design and analysis of pull system, a method of multi stage production control
    • Kimura, O., & Terada, H. (1981). Design and analysis of pull system, a method of multi stage production control. International Journal of Production Research, 19, 241-253.
    • (1981) International Journal of Production Research , vol.19 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 21
  • 22
    • 0031641970 scopus 로고    scopus 로고
    • Optimum number of kanbans between two adjacent stations
    • Nori, V. S., & Sarker, B. R. (1998). Optimum number of kanbans between two adjacent stations. Production Planning and Control, 9, 60-65.
    • (1998) Production Planning and Control , vol.9 , pp. 60-65
    • Nori, V.S.1    Sarker, B.R.2
  • 26
    • 0030269846 scopus 로고    scopus 로고
    • Effects of kanban withdrawal policies and other factors on the performance of JIT system - A simulation study
    • Savsar, M. (1996). Effects of kanban withdrawal policies and other factors on the performance of JIT system - A simulation study. International Journal of Production Research, 34, 2879-2899.
    • (1996) International Journal of Production Research , vol.34 , pp. 2879-2899
    • Savsar, M.1
  • 27
    • 0027814376 scopus 로고
    • Scheduling in a cellular manufacturing system: A simulated annealing approach
    • Sridhar, J., & Rajendran, C. (1993). Scheduling in a cellular manufacturing system: A simulated annealing approach. International Journal of Production Research, 31, 2927-2945.
    • (1993) International Journal of Production Research , vol.31 , pp. 2927-2945
    • Sridhar, J.1    Rajendran, C.2
  • 28
    • 0026374299 scopus 로고
    • Optimum number of kanbans between two adjacent workstations in a JIT system
    • Wang, H., & Wang, H. (1991). Optimum number of kanbans between two adjacent workstations in a JIT system. International Journal of Production Economics, 22, 179-188.
    • (1991) International Journal of Production Economics , vol.22 , pp. 179-188
    • Wang, H.1    Wang, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.