메뉴 건너뛰기




Volumn 41, Issue 2, 2010, Pages 189-201

Determining the optimal number of Kanban in multi-products supply chain system

Author keywords

Genetic algorithm; Kanban; Mix integer programming; Multi product supply chain; Simulated annealing

Indexed keywords

COMPONENT BASED; JUST-IN-TIME SYSTEMS; KEY ELEMENTS; LOT SIZE; META-HEURISTIC METHODS; MIX-INTEGER PROGRAMMING; MULTI-PRODUCT SUPPLY CHAIN; MULTI-PRODUCTS; NEAR-OPTIMAL SOLUTIONS; OPTIMAL METHODS; OPTIMAL NUMBER; OPTIMAL SOLUTIONS; PULL SYSTEMS; RUNTIMES; SUPPLY CHAIN SYSTEMS;

EID: 77951132551     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/00207720903042996     Document Type: Article
Times cited : (13)

References (22)
  • 1
    • 69949155100 scopus 로고    scopus 로고
    • Computer supported design of flexible Kanban system for a multi-stage multi-product manufacturing
    • September 23-27, Amman, Jordan
    • Al-Tahat, M.D., Liverani, A., and Persiani, F. (2001a), Computer Supported Design of Flexible Kanban System for a Multi-stage Multi-product Manufacturing, in First International Industrial Engineering Conference, September 23-27, Amman, Jordan.
    • (2001) First International Industrial Engineering Conference
    • Al-Tahat, M.D.1    Liverani, A.2    Persiani, F.3
  • 2
    • 77951145257 scopus 로고    scopus 로고
    • Design of a marketing decision support method for price quotation in a multi-stage single-product kanban based, manufacturing environment
    • September 5-7, Rimini, Italy
    • Al-Tahat, M.D., Liverani, A., and Persiani, F. (2001b), 'Design of a Marketing Decision Support Method for Price Quotation in a Multi-Stage Single-product Kanbanbased, Manufacturing Environment', in XII ADM International Conference, September 5-7, Rimini, Italy.
    • (2001) XII ADM International Conference
    • Al-Tahat, M.D.1    Liverani, A.2    Persiani, F.3
  • 5
    • 77951123423 scopus 로고    scopus 로고
    • Optimizing of work in progress (WIP) in kanban controlled production lines
    • Al-Tahat, M.D. (2005b), 'Optimizing of Work In Progress (WIP) in Kanban Controlled Production Lines', Dirasat, Engineering Sciences 32(2), 123-132.
    • (2005) Dirasat, Engineering Sciences , vol.32 , Issue.2 , pp. 123-132
    • Al-Tahat, M.D.1
  • 6
    • 33748063302 scopus 로고    scopus 로고
    • Design an analysis of production control scheme for kanban-based JIT environment
    • Al-Tahat, M.D, and Mukattash, A.M. (2006), 'Design an Analysis of Production Control Scheme for Kanban-based JIT Environment', Journal of the Franklin Institute, 343, 521-531.
    • (2006) Journal of the Franklin Institute , vol.343 , pp. 521-531
    • Al-Tahat, M.D.1    Mukattash, A.M.2
  • 7
    • 0026153765 scopus 로고
    • Determining the number of kanbans in a multi product multistage production system
    • Bart, J., and Golany, B. (1991), 'Determining the Number of Kanbans in a Multi product Multistage Production System', International Journal of Production Research, 29(5), 881-895.
    • (1991) International Journal of Production Research , vol.29 , Issue.5 , pp. 881-895
    • Bart, J.1    Golany, B.2
  • 8
    • 33746011471 scopus 로고
    • Determining the number of kanbans and lot sizes in a generic kanban system: A simulated annealing approach
    • Chang, T.M., and Yih, Y. (1994), 'Determining The Number of Kanbans and Lot sizes in a Generic Kanban System: A Simulated Annealing Approach', Computers and Industrial Engineering, 32(8), 1991-2004.
    • (1994) Computers and Industrial Engineering , vol.32 , Issue.8 , pp. 1991-2004
    • Chang, T.M.1    Yih, Y.2
  • 11
    • 0032390295 scopus 로고    scopus 로고
    • Using tabu search to determine the number of kanbans and lotsizes in a generic kanban system
    • Martin, A.D., Chang, T.M., Yih, Y., and Kincaid, R.K. (1998), 'Using Tabu Search to Determine The Number of Kanbans and Lot sizes in Generic Kanban System', Annals of Operations Research, 78, 201-217. (Pubitemid 128404034)
    • (1998) Annals of Operations Research , vol.78 , pp. 201-217
    • Martin, A.D.1    Chang, T.-M.2    Yih, Y.3    Kincaid, R.K.4
  • 12
    • 0011725678 scopus 로고
    • The optimal operational planning of kanban to minimize the total operational cost
    • Miyazaki, S., Ohta, H., and Nishiyama, N. (1988), 'The Optimal Operational Planning of Kanban to Minimize the Total Operational Cost', International Journal of Production Research, 26(10), 1605-1611.
    • (1988) International Journal of Production Research , vol.26 , Issue.10 , pp. 1605-1611
    • Miyazaki, S.1    Ohta, H.2    Nishiyama, N.3
  • 13
    • 84985779120 scopus 로고
    • An approximate solution to deterministic kanban systems
    • Moeeni, F, and Chang, Y. (1990), 'An Approximate Solution to Deterministic Kanban Systems', Decision Science, 21, 596-607.
    • (1990) Decision Science , vol.21 , pp. 596-607
    • Moeeni, F.1    Chang, Y.2
  • 14
    • 0003449926 scopus 로고
    • Norcross, Georgia: Industrial Engineering and Management Press
    • Monden, Y. (1983), Toyota Production System, Norcross, Georgia: Industrial Engineering and Management Press.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 16
    • 0025262876 scopus 로고
    • A mathematical programming approach for determining work centre lot sizes in a just-in-time system with signal kanbans
    • Philipoom, P.R., Rees, L.P., Taylor, B.W., and Huang, P.Y. (1990), 'A Mathematical Programming Approach for Determining Work Centre Lot Sizes in a Just-in-time System with Signal Kanbans', International Journal of Production Research, 28(1), 1-15.
    • (1990) International Journal of Production Research , vol.28 , Issue.1 , pp. 1-15
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3    Huang, P.Y.4
  • 18
    • 60849118080 scopus 로고    scopus 로고
    • Determination of number of kanbans in a supply chain system via memetic algorithm
    • Rabbani, M., Layegh, J., and Ebrahim, R.M. (2008), Determination of Number of Kanbans in a Supply Chain System Via Memetic Algorithm. Advances in Engineering Software, 40(6), 431-437.
    • (2008) Advances in Engineering Software , vol.40 , Issue.6 , pp. 431-437
    • Rabbani, M.1    Layegh, J.2    Ebrahim, R.M.3
  • 21
    • 32544454181 scopus 로고    scopus 로고
    • Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
    • Wang, S., and Sarker, B.R. (2006), 'Optimal Models for a Multi-stage Supply Chain System Controlled by Kanban Under Just-in-time Philosophy', European Journal of Operational Research, 172, 179-200.
    • (2006) European Journal of Operational Research , vol.172 , pp. 179-200
    • Wang, S.1    Sarker, B.R.2
  • 22
    • 0030241843 scopus 로고    scopus 로고
    • Genetic algorithm for non linear mixed integer programming problems and its applications
    • Yokota, T., Gen, M., and Li, Y.X. (1996), 'Genetic Algorithm for Non Linear Mixed Integer Programming Problems and Its Applications', Computers and Industrial Engineering, 30(4), 905-917.
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 905-917
    • Yokota, T.1    Gen, M.2    Li, Y.X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.