-
1
-
-
0029288837
-
Multi-stage, pull-type production/inventory systems
-
T. Altiok, and R. Ranjan Multi-stage, pull-type production/inventory systems IIE Transactions 27 2 1995 190 200
-
(1995)
IIE Transactions
, vol.27
, Issue.2
, pp. 190-200
-
-
Altiok, T.1
Ranjan, R.2
-
2
-
-
0027353436
-
Determining the number of kanbans in multiitem just-in-time systems
-
R.G. Askin, M.G. Mitwasi, and J.B. Goldberg Determining the number of kanbans in multiitem just-in-time systems IIE Transactions 25 1 1993 89 98
-
(1993)
IIE Transactions
, vol.25
, Issue.1
, pp. 89-98
-
-
Askin, R.G.1
Mitwasi, M.G.2
Goldberg, J.B.3
-
3
-
-
0031142134
-
Overplanning factor in Toyota's formula for computing the number of kanban
-
H.C. Co, and M. Sharafali Overplanning factor in Toyota's formula for computing the number of kanban IIE Transactions 29 5 1997 409 415
-
(1997)
IIE Transactions
, vol.29
, Issue.5
, pp. 409-415
-
-
Co, H.C.1
Sharafali, M.2
-
4
-
-
0002082384
-
Integrating kanban type pull systems and MRP type push systems-Insights from a Markovian model
-
J.L. Deleersnyder, T.J. Hodgson, R.E. King, P.J. Ogrady, and A. Savva Integrating kanban type pull systems and MRP type push systems-Insights from a Markovian model IIE Transactions 24 3 1992 43 56
-
(1992)
IIE Transactions
, vol.24
, Issue.3
, pp. 43-56
-
-
Deleersnyder, J.L.1
Hodgson, T.J.2
King, R.E.3
Ogrady, P.J.4
Savva, A.5
-
5
-
-
0022902024
-
An outer-approximation algorithm for a class of mixed-integer nonlinear programs
-
M.A. Duran, and I.E. Grossman An outer-approximation algorithm for a class of mixed-integer nonlinear programs Mathematical Programming 36 1986 307 339
-
(1986)
Mathematical Programming
, vol.36
, pp. 307-339
-
-
Duran, M.A.1
Grossman, I.E.2
-
6
-
-
0032069806
-
Evaluation of performance measures for multi-part, single-product kanban controlled assembly systems with stochastic acquisition and production lead times
-
O. Fujiwara, X. Yue, and K. Sangaradas Evaluation of performance measures for multi-part, single-product kanban controlled assembly systems with stochastic acquisition and production lead times International Journal of Production Research 36 5 1998 1427 1444
-
(1998)
International Journal of Production Research
, vol.36
, Issue.5
, pp. 1427-1444
-
-
Fujiwara, O.1
Yue, X.2
Sangaradas, K.3
-
7
-
-
0032626103
-
An application of designing products and processes for supply chain management
-
A. Garg An application of designing products and processes for supply chain management IIE Transactions 31 5 1999 417 429
-
(1999)
IIE Transactions
, vol.31
, Issue.5
, pp. 417-429
-
-
Garg, A.1
-
8
-
-
0031103287
-
An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment
-
S.M. Gupta, and Y.A.Y. AlTurki An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment Production Planning and Control 8 2 1997 133 141
-
(1997)
Production Planning and Control
, vol.8
, Issue.2
, pp. 133-141
-
-
Gupta, S.M.1
Alturki, Y.A.Y.2
-
9
-
-
0032632360
-
The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem
-
R.M. Hill The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem International Journal of Production Research 37 11 1999 2463 2475
-
(1999)
International Journal of Production Research
, vol.37
, Issue.11
, pp. 2463-2475
-
-
Hill, R.M.1
-
11
-
-
0029774986
-
An analytical method for performance evaluation of kanban controlled production systems
-
M.D. Mascolo, Y. Frein, and Y. Dallery An analytical method for performance evaluation of kanban controlled production systems Operations Research 44 1 1996 50 64
-
(1996)
Operations Research
, vol.44
, Issue.1
, pp. 50-64
-
-
Mascolo, M.D.1
Frein, Y.2
Dallery, Y.3
-
13
-
-
0003449926
-
-
Industrial Engineering and Management Press Norcross, GA
-
Y. Monden The Toyota Production System 1983 Industrial Engineering and Management Press Norcross, GA
-
(1983)
The Toyota Production System
-
-
Monden, Y.1
-
14
-
-
0030194294
-
Cyclic scheduling for a multi-product, single-facility production system operating under a just-in-time delivery policy
-
V.S. Nori, and B.R. Sarkar Cyclic scheduling for a multi-product, single-facility production system operating under a just-in-time delivery policy Journal of the Operational Research Society 47 3 1996 930 935
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.3
, pp. 930-935
-
-
Nori, V.S.1
Sarkar, B.R.2
-
15
-
-
0031641970
-
Optimum number of kanbans between two adjacent stations
-
V.S. Nori, and B.R. Sarkar Optimum number of kanbans between two adjacent stations Production Planning and Control 9 1 1998 60 65
-
(1998)
Production Planning and Control
, vol.9
, Issue.1
, pp. 60-65
-
-
Nori, V.S.1
Sarkar, B.R.2
-
16
-
-
0033317962
-
Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers
-
G.R. Parija, and B.R. Sarker Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers IIE Transactions 31 11 1999 1075 1082
-
(1999)
IIE Transactions
, vol.31
, Issue.11
, pp. 1075-1082
-
-
Parija, G.R.1
Sarker, B.R.2
-
17
-
-
0023365980
-
Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead time
-
L.P. Rees, P.R. Philipoom, B.W. Taylor, and P.Y. Huang Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead time IIE Transactions 19 2 1987 199 207
-
(1987)
IIE Transactions
, vol.19
, Issue.2
, pp. 199-207
-
-
Rees, L.P.1
Philipoom, P.R.2
Taylor, B.W.3
Huang, P.Y.4
-
19
-
-
0031999406
-
Operations planning for a single-stage kanban system operating under linear demand
-
B.R. Sarker, and C.V. Balan Operations planning for a single-stage kanban system operating under linear demand International Journal of Production Research 36 2 1998 357 375
-
(1998)
International Journal of Production Research
, vol.36
, Issue.2
, pp. 357-375
-
-
Sarker, B.R.1
Balan, C.V.2
-
21
-
-
0026374299
-
Optimum number of kanbans between two adjacent workstations in a JIT system
-
H. Wang, and H.P. Wang Optimum number of kanbans between two adjacent workstations in a JIT system International Journal of Production Economics 22 2 1991 179 188
-
(1991)
International Journal of Production Economics
, vol.22
, Issue.2
, pp. 179-188
-
-
Wang, H.1
Wang, H.P.2
|