메뉴 건너뛰기




Volumn 383-390, Issue , 2012, Pages 1677-1683

Hybrid genetic algorithm-based production planning for steel-making and continuous casting process

Author keywords

Backward inferring algorithm; Genetic algorithm; Steel making and continuous casting; Subset real number code

Indexed keywords

CONTINUOUS CASTING PROCESS; DELIVERY TIME; HIGH QUALITY; HYBRID GENETIC; JUST IN TIME; OPERATION TIME; PRACTICAL PROCESS; PROCESSING UNITS; PRODUCTION DATA; PRODUCTION PLANNING; PRODUCTION PLANS; REAL NUMBER CODES; STEEL PLANT; TRANSPORTATION TIME;

EID: 83755161490     PISSN: 10226680     EISSN: None     Source Type: Book Series    
DOI: 10.4028/www.scientific.net/AMR.383-390.1677     Document Type: Conference Paper
Times cited : (1)

References (7)
  • 1
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang L, Liu J, Rong A, Yang Z. A Review of Planning and Scheduling Systems and Methods for Integrated Steel Production. European Journal of Operational Research, 2001, 133(1): 1-20.
    • (2001) European Journal of Operational Research , vol.133 , Issue.1 , pp. 1-20
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 2
    • 9644281095 scopus 로고    scopus 로고
    • Production scheduling in a steelmaking-continuous casting plant
    • Pacciarelli D, Pranzo M. Production Scheduling in a Steelmaking- Continuous Casting Plant. Computers and Chemical Engineering, 2004, 28(12):2823-2835.
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.12 , pp. 2823-2835
    • Pacciarelli, D.1    Pranzo, M.2
  • 4
    • 41149149606 scopus 로고    scopus 로고
    • Hybrid evolutionary algorithm with marriage of genetic algorithm and extremal optimization for production scheduling
    • Chen Y, Lu Y, Yang G. Hybrid Evolutionary Algorithm with Marriage of Genetic Algorithm and Extremal Optimization for Production Scheduling. The International Journal of Advanced Manufacturing Technology, 2008, 36(9-10):959-968.
    • (2008) The International Journal of Advanced Manufacturing Technology , vol.36 , Issue.9-10 , pp. 959-968
    • Chen, Y.1    Lu, Y.2    Yang, G.3
  • 5
    • 58549106334 scopus 로고    scopus 로고
    • A novel hybrid algorithm for scheduling steel-making continuous casting production
    • Atighehchian A, Bijari M, Tarkesh H. A Novel Hybrid Algorithm for Scheduling Steel-making Continuous Casting Production. Computers & Operations Research, 2009, 36(8): 2450-461.
    • (2009) Computers & Operations Research , vol.36 , Issue.8 , pp. 2450-2461
    • Atighehchian, A.1    Bijari, M.2    Tarkesh, H.3
  • 6
    • 70449590249 scopus 로고    scopus 로고
    • A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry
    • Missbauer H, Hauber W, Stadler W. A Scheduling System for the Steelmaking-Continuous Casting Process. A Case Study from the Steel-making Industry. International Journal of Production Research, 2009, 47(15):4147-4172.
    • (2009) International Journal of Production Research , vol.47 , Issue.15 , pp. 4147-4172
    • Missbauer, H.1    Hauber, W.2    Stadler, W.3
  • 7
    • 44449127751 scopus 로고    scopus 로고
    • Parallel backward inferring algorithm for production planning of mixed-mode processes
    • Zheng Zhong, Zhu Dao-fei, Gao Xiao-qiang. Parallel Backward Inferring Algorithm for Production Planning of Mixed-mode Processes. Computer Integrated Manufacturing Systems, 2008, 14(4):749-756.
    • (2008) Computer Integrated Manufacturing Systems , vol.14 , Issue.4 , pp. 749-756
    • Zheng, Z.1    Zhu, D.-F.2    Gao, X.-Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.