메뉴 건너뛰기




Volumn 26, Issue 1, 2011, Pages 137-140

Simulation based genetic algorithm for production planning of steelmaking-continuous casting process

Author keywords

Genetic algorithm; Production planning; Simulation based optimization; Steelmaking continuous casting

Indexed keywords

CONTINUOUS CASTING PROCESS; JOB SCHEDULING PROBLEM; PHYSICAL SYSTEMS; PRODUCTION PLANNING; SIMULATION-BASED; SIMULATION-BASED OPTIMIZATIONS;

EID: 79952459535     PISSN: 10010920     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (10)
  • 1
    • 79952467768 scopus 로고    scopus 로고
    • Research on production planning approaches in iron and steel enterprise based on 3-layer CIMS
    • Shenyang: College of Information Science and Engineering, Northeastern University
    • Hu K Y. Research on production planning approaches in iron and steel enterprise based on 3-layer CIMS[D]. Shenyang: College of Information Science and Engineering, Northeastern University, 2003: 9-10.
    • (2003) , pp. 9-10
    • Hu, K.Y.1
  • 2
    • 79952470476 scopus 로고    scopus 로고
    • Study on self-organization optimization for production planning and scheduling in steel-making plant
    • Chongqing: College of Material Science and Engineering, Chongqing University
    • Zhu D F. Study on self-organization optimization for production planning and scheduling in steel-making plant[D]. Chongqing: College of Material Science and Engineering, Chongqing University, 2008.
    • (2008)
    • Zhu, D.F.1
  • 3
    • 79952464733 scopus 로고    scopus 로고
    • Establishment of steelmaking-continuous casting production plan and simulation test
    • Yu L X, Tang Q H. Establishment of steelmaking-continuous casting production plan and simulation test[J]. Industrial Control Computer, 2008, 21(11): 42-44.
    • (2008) Industrial Control Computer , vol.21 , Issue.11 , pp. 42-44
    • Yu, L.X.1    Tang, Q.H.2
  • 4
    • 0033892353 scopus 로고    scopus 로고
    • A mathematical programming model for scheduling steelmaking-continuous casting production
    • Tang L, Liu J, Rong A, et al. A mathematical programming model for scheduling steelmaking-continuous casting production[J]. European J of Operational Research, 2000, 120(2): 423-435.
    • (2000) European J of Operational Research , vol.120 , Issue.2 , pp. 423-435
    • Tang, L.1    Liu, J.2    Rong, A.3
  • 5
    • 19744362122 scopus 로고    scopus 로고
    • Research on two stage case-based reasoning for the dynamic scheduling system of iron and steel works
    • Chang C G, Wang D W, Hu K Y, et al. Research on two stage case-based reasoning for the dynamic scheduling system of iron and steel works[J]. Control and Decision, 2004, 19(10): 1109-1112.
    • (2004) Control and Decision , vol.19 , Issue.10 , pp. 1109-1112
    • Chang, C.G.1    Wang, D.W.2    Hu, K.Y.3
  • 6
    • 0030397966 scopus 로고    scopus 로고
    • Simulation based optimization
    • California: Institute of Electrical and Electronics
    • Shapiro A. Simulation based optimization[C]. Proc of the 1996 Winter Simulation Conf. California: Institute of Electrical and Electronics, 1996: 332-336.
    • (1996) Proc of the Winter Simulation Conf , pp. 332-336
    • Shapiro, A.1
  • 7
    • 15744401770 scopus 로고    scopus 로고
    • Simulation-based optimization model and meta-heuristic solution of multiple crane scheduling problems
    • Hague: IEEE
    • Tamaki H, Kitamura S, Murao H. Simulation-based optimization model and meta-heuristic solution of multiple crane scheduling problems[C]. The 2004 IEEE Int Conf Systems, Man and Cybernetics. Hague: IEEE, 2004: 1469-1474.
    • (2004) The IEEE Int Conf Systems, Man and Cybernetics , pp. 1469-1474
    • Tamaki, H.1    Kitamura, S.2    Murao, H.3
  • 8
    • 68949210462 scopus 로고    scopus 로고
    • Simulation-based optimization vs mathematical programming: A hybrid approach for optimizing scheduling problems
    • Klemmt A, Horn S, Weigert G, et al. Simulation-based optimization vs mathematical programming: A hybrid approach for optimizing scheduling problems[J]. Robotics and Computer-integrated Manufacturing, 2009, 25(6): 917-925.
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , Issue.6 , pp. 917-925
    • Klemmt, A.1    Horn, S.2    Weigert, G.3
  • 9
    • 67649204170 scopus 로고    scopus 로고
    • Simulation-based optimization of loading-unloading strategies in railway container terminal
    • Li D, Wang D W. Simulation-based optimization of loading-unloading strategies in railway container terminal[J]. J of System Simulation, 2009, 21(11): 3188-3191.
    • (2009) J of System Simulation , vol.21 , Issue.11 , pp. 3188-3191
    • Li, D.1    Wang, D.W.2
  • 10
    • 2542590403 scopus 로고    scopus 로고
    • Advances in simulation optimization
    • Wang L, Zhang L, Zheng D Z. Advances in simulation optimization[J]. Control and Decision, 2003, 18(3): 257-262.
    • (2003) Control and Decision , vol.18 , Issue.3 , pp. 257-262
    • Wang, L.1    Zhang, L.2    Zheng, D.Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.