메뉴 건너뛰기




Volumn 133, Issue 1, 2001, Pages 1-20

A review of planning and scheduling systems and methods for integrated steel production

Author keywords

Integrated process; Iron and steel industry; Production planning and scheduling

Indexed keywords

IRON AND STEEL INDUSTRY; PROCESS ENGINEERING; PRODUCTIVITY; SCHEDULING; STRATEGIC PLANNING;

EID: 0035899628     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(00)00240-X     Document Type: Article
Times cited : (363)

References (77)
  • 17
    • 0004872862 scopus 로고
    • Consideration on direct connection between continuous caster and hot strip mill
    • (1988) Iron and Steel , vol.74 , Issue.7 , pp. 3-6
    • Kato, K.1
  • 21
    • 0004899772 scopus 로고
    • Determining the integrated process framework from steelmaking to hot rolling at Kakogawa Works
    • (1994) IE of Iron and Steel , vol.32 , Issue.4 , pp. 51-55
    • Yamanaka, K.1
  • 35
    • 0023843528 scopus 로고
    • A scheduling model for LTV steel's Cleveland works twin-strand continuous slab caster
    • (1988) Interface , vol.18 , Issue.1 , pp. 42-56
    • Box, R.E.1    Herbe, D.G.2
  • 62
    • 84974774294 scopus 로고
    • Iterative improvement methods for knowledge-based scheduling
    • (1995) AICOM , vol.8 , Issue.1 , pp. 20-34
    • Dorn, J.1
  • 70
    • 0022099817 scopus 로고
    • Visual interactive modeling as an operations research technique
    • (1985) Interfaces , vol.15 , Issue.4 , pp. 26-33
    • Peter, C.B.1
  • 71
    • 0031115735 scopus 로고    scopus 로고
    • A review of the applicability of OR and AI scheduling techniques in practice
    • (1997) OMEGA , vol.25 , Issue.2 , pp. 145-153
    • Wiers, V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.