Issues in the use, design and evolution of process scheduling and planning systems
-
Applequist, G., O. Samikoglu, J. Pekny, and G. Reklaitis. (1997). "Issues in the Use, Design and Evolution of Process Scheduling and Planning Systems." ISA Transactions 36, 81-121.
-
(1997)
ISA Transactions
, vol.36
, pp. 81-121
-
-
Applequist, G.1
Samikoglu, O.2
Pekny, J.3
Reklaitis, G.4
-
2
-
-
0030174484
-
Perspectives on model based integration of process operations
-
Bassett, M.H., P. Dave, F.J.D. III, G.K. Kudva, J.F. Pekny, G.V. Reklaitis, S. Subrahmanyam, D.L. Miller, and M.G. Zentner. (1996a). "Perspectives on Model Based Integration of Process Operations." Computers & Chemical Engineering 20, 821-844.
-
(1996)
Computers & Chemical Engineering
, vol.20
, pp. 821-844
-
-
Bassett, M.H.1
Dave, P.2
D. III, F.J.3
Kudva, G.K.4
Pekny, J.F.5
Reklaitis, G.V.6
Subrahmanyam, S.7
Miller, D.L.8
Zentner, M.G.9
-
3
-
-
0030417871
-
Decomposition techniques for the solution of large-scale scheduling problems
-
Bassett, M.H., J.F. Pekny, and G.V. Reklaitis. (1996b). "Decomposition Techniques for the Solution of Large-Scale Scheduling Problems." AIChE Journal 42, 3373-3387.
-
(1996)
AIChE Journal
, vol.42
, pp. 3373-3387
-
-
Bassett, M.H.1
Pekny, J.F.2
Reklaitis, G.V.3
-
5
-
-
0032162859
-
Continuous-time modeling for short-term scheduling of multipurpose pipeless plants
-
Bok, J. and S.Park. (1998). "Continuous-Time Modeling for Short-Term Scheduling of Multipurpose Pipeless Plants." Industrial & Engineering Chemistry Research 37, 3652-3659.
-
(1998)
Industrial & Engineering Chemistry Research
, vol.37
, pp. 3652-3659
-
-
Bok, J.1
Park, S.2
-
6
-
-
0038709760
-
The schedule-sequencing problem
-
Bowman, E.H. (1959). "The Schedule-Sequencing Problem." Operations Research 7, 621-624.
-
(1959)
Operations Research
, vol.7
, pp. 621-624
-
-
Bowman, E.H.1
-
7
-
-
0037106297
-
Makespan minimization for chemical batch processes using non-uniform time grids
-
Burkard, R.E., T. Fortuna, and C.A.J. Hurkens. (2002). "Makespan Minimization for Chemical Batch Processes Using Non-Uniform Time Grids." Computers & Chemical Engineering 26, 1321-1332.
-
(2002)
Computers & Chemical Engineering
, vol.26
, pp. 1321-1332
-
-
Burkard, R.E.1
Fortuna, T.2
Hurkens, C.A.J.3
-
8
-
-
0035795519
-
An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
-
Castro, P., A.P.F.D. Barbosa-Póvoa, and H. Matos. (2001). "An Improved RTN Continuous-Time Formulation for the Short-Term Scheduling of Multipurpose Batch Plants." Industrial & Engineering Chemistry Research 40, 2059-2068.
-
(2001)
Industrial & Engineering Chemistry Research
, vol.40
, pp. 2059-2068
-
-
Castro, P.1
Barbosa-Póvoa, A.P.F.D.2
Matos, H.3
-
10
-
-
0031140322
-
A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
-
Cerdá, J., G.P. Henning, and I.E. Grossmann. (1997). "A Mixed-Integer Linear Programming Model for Short-Term Scheduling of Single-Stage Multiproduct Batch Plants with Parallel Lines." Industrial & Engineering Chemistry Research 36, 1695-1707.
-
(1997)
Industrial & Engineering Chemistry Research
, vol.36
, pp. 1695-1707
-
-
Cerdá, J.1
Henning, G.P.2
Grossmann, I.E.3
-
11
-
-
0029231167
-
Optimal short-term scheduling of maintenance and production for multipurpose plants
-
Dedopoulos, LT. and N. Shah. (1995). "Optimal Short-Term Scheduling of Maintenance and Production for Multipurpose Plants." Industrial & Engineering Chemistry Research 34, 192-201.
-
(1995)
Industrial & Engineering Chemistry Research
, vol.34
, pp. 192-201
-
-
Dedopoulos, L.T.1
Shah, N.2
-
12
-
-
0000685021
-
RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
-
Dimitriadis, A.D., N. Shah, and C.C. Pantelides. (1997). "RTN-Based Rolling Horizon Algorithms for Medium Term Scheduling of Multipurpose Plants." Computers & Chemical Engineering 21, S1061-S1066.
-
(1997)
Computers & Chemical Engineering
, vol.21
-
-
Dimitriadis, A.D.1
Shah, N.2
Pantelides, C.C.3
-
13
-
-
0031654034
-
Structured valid inequalities and separation in optimal scheduling of the resource-constrained batch chemical plant
-
Elkamel, A. and G. Al-Enezi. (1998). "Structured Valid Inequalities and Separation in Optimal Scheduling of the Resource-Constrained Batch Chemical Plant." Mathematical Engineering in Industry 6, 291-318.
-
(1998)
Mathematical Engineering in Industry
, vol.6
, pp. 291-318
-
-
Elkamel, A.1
Al-Enezi, G.2
-
14
-
-
0031412922
-
A decomposition heuristic for scheduling the general batch chemical plant
-
Elkamel, A., M. Zentner, J.F. Pekny, and G.V. Reklaitis. (1997). "A Decomposition Heuristic for Scheduling the General Batch Chemical Plant." Engineering Optimization 28, 299-330.
-
(1997)
Engineering Optimization
, vol.28
, pp. 299-330
-
-
Elkamel, A.1
Zentner, M.2
Pekny, J.F.3
Reklaitis, G.V.4
-
16
-
-
2442583184
-
Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
-
Floudas, C.A. and X. Lin. (2004). "Continuous-Time versus Discrete-Time Approaches for Scheduling of Chemical Processes: A Review." Computers & Chemical Engineering 28, 2109-2129.
-
(2004)
Computers & Chemical Engineering
, vol.28
, pp. 2109-2129
-
-
Floudas, C.A.1
Lin, X.2
-
19
-
-
0035340218
-
Short-term scheduling and recipe optimization of blending processes
-
Glismann, K. and G. Gruhn. (2001). "Short-Term Scheduling and Recipe Optimization of Blending Processes." Computers & Chemical Engineering 25, 627-634.
-
(2001)
Computers & Chemical Engineering
, vol.25
, pp. 627-634
-
-
Glismann, K.1
Gruhn, G.2
-
20
-
-
0016619730
-
Improved linear integer programming formulations of nonlinear integer problems
-
Glover, F. (1975). "Improved Linear Integer Programming Formulations of Nonlinear Integer Problems." Management Science 22, 455-460.
-
(1975)
Management Science
, vol.22
, pp. 455-460
-
-
Glover, F.1
-
21
-
-
0011780681
-
Mixed-integer optimization techniques for the design and scheduling of batch processes
-
G. V. Reklaitis, A. K. Sunol, D. W. T. Rippin and O. Hortacsu (ed.), Berlin: Springer
-
Grossmann, I.E., I. Quesada, R. Raman, and V.T. Voudouris. (1996). "Mixed-Integer Optimization Techniques for the Design and Scheduling of Batch Processes." In G. V. Reklaitis, A. K. Sunol, D. W. T. Rippin and O. Hortacsu (ed.), Batch Processing Systems Engineering, Berlin: Springer, pp. 451-494.
-
(1996)
Batch Processing Systems Engineering
, pp. 451-494
-
-
Grossmann, I.E.1
Quesada, I.2
Raman, R.3
Voudouris, V.T.4
-
22
-
-
0035890549
-
A decomposition approach for the scheduling of a steel plant production
-
Harjunkoski, I. and I.E. Grossmann. (2001). "A Decomposition Approach for the Scheduling of a Steel Plant Production." Computers & Chemical Engineering 25, 1647-1660.
-
(2001)
Computers & Chemical Engineering
, vol.25
, pp. 1647-1660
-
-
Harjunkoski, I.1
Grossmann, I.E.2
-
23
-
-
0035851992
-
A bi-index continuous-time mixed-integer linear programming model for single-stage batch scheduling with parallel units
-
Hui, C. and A. Gupta. (2001). "A Bi-index Continuous-Time Mixed-Integer Linear Programming Model for Single-Stage Batch Scheduling with Parallel Units." Industrial & Engineering Chemistry Research 40, 5960-5967.
-
(2001)
Industrial & Engineering Chemistry Research
, vol.40
, pp. 5960-5967
-
-
Hui, C.1
Gupta, A.2
-
24
-
-
0034387803
-
A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints
-
Hui, C., A. Gupta, and H.A.J. van der Meulen. (2000). "A Novel MILP Formulation for Short-Term Scheduling of Multi-Stage Multi-Product Batch Plants with Sequence-Dependent Constraints." Computers & Chemical Engineering 24, 2705-2717.
-
(2000)
Computers & Chemical Engineering
, vol.24
, pp. 2705-2717
-
-
Hui, C.1
Gupta, A.2
Van Der Meulen, H.A.J.3
-
25
-
-
0032216021
-
Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes
-
Ierapetritou, M.G. and C.A. Floudas. (1998a). "Effective Continuous-Time Formulation for Short-Term Scheduling: 1. Multipurpose Batch Processes." Industrial & Engineering Chemistry Research 37, 4341-4359.
-
(1998)
Industrial & Engineering Chemistry Research
, vol.37
, pp. 4341-4359
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
26
-
-
0032216046
-
Effective continuous-time formulation for short-term scheduling: 2. Continuous and semi-continuous processes
-
Ierapetritou, M.G. and C.A. Floudas. (1998b). "Effective Continuous-Time Formulation for Short-Term Scheduling: 2. Continuous and Semi-Continuous Processes." Industrial & Engineering Chemistry Research 37, 4360-4374.
-
(1998)
Industrial & Engineering Chemistry Research
, vol.37
, pp. 4360-4374
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
27
-
-
0035980381
-
Comments on "an improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants"
-
Ierapetritou, M.G. and C.A. Floudas. (2001). Comments on "An Improved RTN Continuous-Time Formulation for the Short-term Scheduling of Multipurpose Batch Plants." Industrial & Engineering Chemistry Research 40, 5040-5041.
-
(2001)
Industrial & Engineering Chemistry Research
, vol.40
, pp. 5040-5041
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
28
-
-
0032877613
-
Effective continuous-time formulation for short-term scheduling: 3. Multiple intermediate due dates
-
Ierapetritou, M.G., T.S. Hené, and C.A. Floudas. (1999). "Effective Continuous-Time Formulation for Short-Term Scheduling: 3. Multiple Intermediate Due Dates." Industrial & Engineering Chemistry Research 38, 3446-3461.
-
(1999)
Industrial & Engineering Chemistry Research
, vol.38
, pp. 3446-3461
-
-
Ierapetritou, M.G.1
Hené, T.S.2
Floudas, C.A.3
-
29
-
-
2442436591
-
Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
-
Janak, S.L., X. Lin, and C.A. Floudas. (2004). "Enhanced Continuous-Time Unit-Specific Event-Based Formulation for Short-Term Scheduling of Multipurpose Batch Processes: Resource Constraints and Mixed Storage Policies." Industrial & Engineering Chemistry Research 43, 2516-2533.
-
(2004)
Industrial & Engineering Chemistry Research
, vol.43
, pp. 2516-2533
-
-
Janak, S.L.1
Lin, X.2
Floudas, C.A.3
-
30
-
-
0031186347
-
Planning and scheduling of parallel semi-continuous processes. 2. Short-term scheduling
-
Karimi, I.A. and C.M. McDonald. (1997). "Planning and Scheduling of Parallel Semi-Continuous Processes. 2. Short-Term Scheduling." Industrial & Engineering Chemistry Research 36, 2701-2714.
-
(1997)
Industrial & Engineering Chemistry Research
, vol.36
, pp. 2701-2714
-
-
Karimi, I.A.1
McDonald, C.M.2
-
31
-
-
0002455170
-
A general algorithm for scheduling batch operations
-
Sydney, Australia
-
Kondili, E., C.C. Pantelides, and R.W.H. Sargent. (1988). "A General Algorithm for Scheduling Batch Operations." In Proceedings of the Third International Symposium on Process Systems Engineering, Sydney, Australia, pp. 62-75.
-
(1988)
Proceedings of the Third International Symposium on Process Systems Engineering
, pp. 62-75
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
32
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations - I. MILP formulation
-
Kondili, E., C.C. Pantelides, and R.W.H. Sargent. (1993). "A General Algorithm for Short-Term Scheduling of Batch Operations - I. MILP Formulation." Computers & Chemical Engineering 17, 211-227.
-
(1993)
Computers & Chemical Engineering
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
33
-
-
0024090948
-
Scheduling in serial multiproduct batch processes with finite inter-stage storage: A mixed integer linear programming formulation
-
Ku, H. and I.A. Karimi. (1988). "Scheduling in Serial Multiproduct Batch Processes with Finite Inter-stage Storage: A Mixed Integer Linear Programming Formulation." Industrial & Engineering Chemistry Research 27, 1840-1848.
-
(1988)
Industrial & Engineering Chemistry Research
, vol.27
, pp. 1840-1848
-
-
Ku, H.1
Karimi, I.A.2
-
34
-
-
0037138682
-
Scheduling parallel production lines with resource constraints. 1. Model formulation
-
Lamba, N. and I.A. Karimi. (2002a). "Scheduling Parallel Production Lines with Resource Constraints. 1. Model Formulation." Industrial & Engineering Chemistry Research 41, 779-789.
-
(2002)
Industrial & Engineering Chemistry Research
, vol.41
, pp. 779-789
-
-
Lamba, N.1
Karimi, I.A.2
-
35
-
-
0037138595
-
Scheduling parallel production lines with resource constraints. 2. Decomposition algorithm
-
Lamba, N. and I.A. Karimi. (2002b). "Scheduling Parallel Production Lines with Resource Constraints. 2. Decomposition Algorithm." Industrial & Engineering Chemistry Research 41, 790-800.
-
(2002)
Industrial & Engineering Chemistry Research
, vol.41
, pp. 790-800
-
-
Lamba, N.1
Karimi, I.A.2
-
36
-
-
0036138086
-
Scheduling of single-stage and continuous processes on parallel lines with intermediate due dates
-
Lee, K., S. Heo, H. Lee, and I. Lee. (2002). "Scheduling of Single-Stage and Continuous Processes on Parallel Lines with Intermediate Due Dates." Industrial & Engineering Chemistry Research 41, 5866.
-
(2002)
Industrial & Engineering Chemistry Research
, vol.41
, pp. 5866
-
-
Lee, K.1
Heo, S.2
Lee, H.3
Lee, I.4
-
37
-
-
0035980317
-
A novel nonuniform discrete time formulation for short-term scheduling of batch and continuous processes
-
Lee, K., H.I. Park, and I. Lee. (2001). "A Novel Nonuniform Discrete Time Formulation for Short-Term Scheduling of Batch and Continuous Processes." Industrial & Engineering Chemistry Research 40, 4902-4911.
-
(2001)
Industrial & Engineering Chemistry Research
, vol.40
, pp. 4902-4911
-
-
Lee, K.1
Park, H.I.2
Lee, I.3
-
38
-
-
0035340986
-
Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation
-
Lin, X. and C.A. Floudas. (2001). "Design, Synthesis and Scheduling of Multipurpose Batch Plants via an Effective Continuous-Time Formulation." Computers & Chemical Engineering 25, 665-674.
-
(2001)
Computers & Chemical Engineering
, vol.25
, pp. 665-674
-
-
Lin, X.1
Floudas, C.A.2
-
39
-
-
0037036735
-
Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
-
Lin, X., C.A. Floudas, S. Modi, and N.M. Juhasz. (2002). "Continuous-Time Optimization Approach for Medium-Range Production Scheduling of a Multiproduct Batch Plant." Industrial & Engineering Chemistry Research 41, 3884-3906.
-
(2002)
Industrial & Engineering Chemistry Research
, vol.41
, pp. 3884-3906
-
-
Lin, X.1
Floudas, C.A.2
Modi, S.3
Juhasz, N.M.4
-
40
-
-
0035852008
-
A novel continuous-time MILP formulation for multipurpose batch plants. 1. Short-term scheduling
-
Majozi, T. and X.X. Zhu. (2001). "A Novel Continuous-Time MILP Formulation for Multipurpose Batch Plants. 1. Short-Term Scheduling." Industrial & Engineering Chemistry Research 40, 5935-5949.
-
(2001)
Industrial & Engineering Chemistry Research
, vol.40
, pp. 5935-5949
-
-
Majozi, T.1
Zhu, X.X.2
-
41
-
-
0000237789
-
On the job-shop scheduling problem
-
Manne, A.S. (1960). "On the Job-Shop Scheduling Problem." Operations Research 8, 219-223.
-
(1960)
Operations Research
, vol.8
, pp. 219-223
-
-
Manne, A.S.1
-
42
-
-
0037635200
-
A new general continuous-time state task network formulation for short-term scheduling of multipurpose batch plants
-
Maravelias, C.T. and I.E. Grossmann. (2003). "A New General Continuous-Time State Task Network Formulation for Short-Term Scheduling of Multipurpose Batch Plants." Industrial & Engineering Chemistry Research 42, 3056-3074.
-
(2003)
Industrial & Engineering Chemistry Research
, vol.42
, pp. 3056-3074
-
-
Maravelias, C.T.1
Grossmann, I.E.2
-
43
-
-
0343627890
-
Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end-product facilities
-
Méndez, C.A. and J. Cerdá. (2000a). "Optimal Scheduling of a Resource-Constrained Multiproduct Batch Plant Supplying Intermediates to Nearby End-Product Facilities." Computers & Chemical Engineering 24, 369-376.
-
(2000)
Computers & Chemical Engineering
, vol.24
, pp. 369-376
-
-
Méndez, C.A.1
Cerdá, J.2
-
44
-
-
0034307307
-
Optimal scheduling of batch plants satisfying multiple product orders with different due-dates
-
Méndez, C.A., G.P. Henning, and J. Cerdá. (2000b). "Optimal Scheduling of Batch Plants Satisfying Multiple Product Orders with Different Due-Dates." Computers & Chemical Engineering 24, 2223-2245.
-
(2000)
Computers & Chemical Engineering
, vol.24
, pp. 2223-2245
-
-
Méndez, C.A.1
Henning, G.P.2
Cerdá, J.3
-
45
-
-
0035339828
-
An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
-
Méndez, C.A., G.P. Henning, and J. Cerdá. (2001). "An MILP Continuous-Time Approach to Short-Term Scheduling of Resource-Constrained Multistage Flowshop Batch Facilities." Computers & Chemical Engineering 25, 701-711.
-
(2001)
Computers & Chemical Engineering
, vol.25
, pp. 701-711
-
-
Méndez, C.A.1
Henning, G.P.2
Cerdá, J.3
-
46
-
-
0004223938
-
-
Kluwer Academic Publishers
-
Mockus, J., W. Eddy, A. Mockus, L. Mockus, and R.V. Reklaitis. (1997). Bayesian Heuristic Approach to Discrete and Global Optimization: Algorithms, Visualization, Software, and Applications. Kluwer Academic Publishers.
-
(1997)
Bayesian Heuristic Approach to Discrete and Global Optimization: Algorithms, Visualization, Software, and Applications
-
-
Mockus, J.1
Eddy, W.2
Mockus, A.3
Mockus, L.4
Reklaitis, R.V.5
-
47
-
-
0031190611
-
Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization
-
Mockus, L. and G.V. Reklaitis. (1997). "Mathematical Programming Formulation for Scheduling of Batch Operations Based on Nonuniform Time Discretization." Computers & Chemical Engineering 21, 1147-1156.
-
(1997)
Computers & Chemical Engineering
, vol.21
, pp. 1147-1156
-
-
Mockus, L.1
Reklaitis, G.V.2
-
48
-
-
0032997426
-
Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation
-
Mockus, L. and G.V. Reklaitis. (1999a). "Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 1. MINLP Formulation." Industrial & Engineering Chemistry Research 38, 197-203.
-
(1999)
Industrial & Engineering Chemistry Research
, vol.38
, pp. 197-203
-
-
Mockus, L.1
Reklaitis, G.V.2
-
49
-
-
0033037070
-
Continuous time representation approach to batch and continuous process scheduling. 2. Computational issues
-
Mockus, L. and G.V. Reklaitis. (1999b). "Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 2. Computational Issues." Industrial & Engineering Chemistry Research 38, 204-210.
-
(1999)
Industrial & Engineering Chemistry Research
, vol.38
, pp. 204-210
-
-
Mockus, L.1
Reklaitis, G.V.2
-
50
-
-
0032940278
-
Mixed-integer linear programming model for short-term scheduling of a special class of multipurpose batch plants
-
Moon, S. and A.N. Hrymak. (1999). "Mixed-Integer Linear Programming Model for Short-Term Scheduling of a Special Class of Multipurpose Batch Plants." Industrial & Engineering Chemistry Research 38, 2144-2150.
-
(1999)
Industrial & Engineering Chemistry Research
, vol.38
, pp. 2144-2150
-
-
Moon, S.1
Hrymak, A.N.2
-
51
-
-
0030257561
-
New MILP models for scheduling of multiproduct batch plants under zero-wait policy
-
Moon, S., S. Park, and W.K. Lee. (1996). "New MILP Models for Scheduling of Multiproduct Batch Plants under Zero-Wait Policy." Industrial & Engineering Chemistry Research 35, 3458-3469.
-
(1996)
Industrial & Engineering Chemistry Research
, vol.35
, pp. 3458-3469
-
-
Moon, S.1
Park, S.2
Lee, W.K.3
-
53
-
-
0035869053
-
General continuous time models for production planning and scheduling of batch processing plants: Mixed integer linear program formulations and computational issues
-
Orçun, S., I.K., Altinel, and Ö Hortaçsu. (2001). "General Continuous Time Models for Production Planning and Scheduling of Batch Processing Plants: Mixed Integer Linear Program Formulations and Computational Issues." Computers & Chemical Engineering 25, 371-389.
-
(2001)
Computers & Chemical Engineering
, vol.25
, pp. 371-389
-
-
Orçun, S.1
Altinel, I.K.2
Hortaçsu, Ö.3
-
54
-
-
0000763707
-
Unified frameworks for optimal process planning and scheduling
-
D.W.T. Rippin, J.C. Hale, and J. Davis (eds.), Crested Butte, Colorado
-
Pantelides, C.C. (1993). "Unified Frameworks for Optimal Process Planning and Scheduling." In D.W.T. Rippin, J.C. Hale, and J. Davis (eds.), Proceedings of the Second International Conference on Foundations of Computer-Aided Process Operations, Crested Butte, Colorado, pp. 253-274.
-
(1993)
Proceedings of the Second International Conference on Foundations of Computer-aided Process Operations
, pp. 253-274
-
-
Pantelides, C.C.1
-
55
-
-
0002238922
-
Towards the convergence of theory and practice: A technology guide for scheduling/planning methodology
-
J.F. Pekny and G.E. Blau (eds.), Snowbird, Utah
-
Pekny, J.F. and G.V. Reklaitis. (1998). "Towards the Convergence of Theory and Practice: A Technology Guide for Scheduling/Planning Methodology." In J.F. Pekny and G.E. Blau (eds.), Proceedings of the Third International Conference on Foundations of Computer-Aided Process Operations, Snowbird, Utah, pp. 91-111.
-
(1998)
Proceedings of the Third International Conference on Foundations of Computer-aided Process Operations
, pp. 91-111
-
-
Pekny, J.F.1
Reklaitis, G.V.2
-
56
-
-
0002259729
-
Learning to solve process scheduling problems: The role of rigorous knowledge acquisition frameworks
-
D.W.T. Rippin, J.C. Hale, and J. Davis (eds.), Crested Butte, Colorado
-
Pekny, J.F. and M.G. Zentner. (1993). "Learning to Solve Process Scheduling Problems: The Role of Rigorous Knowledge Acquisition Frameworks." In D.W.T. Rippin, J.C. Hale, and J. Davis (eds.), Proceedings of the Second International Conference on Foundations of Computer-Aided Process Operations, Crested Butte, Colorado, pp. 275-309.
-
(1993)
Proceedings of the Second International Conference on Foundations of Computer-aided Process Operations
, pp. 275-309
-
-
Pekny, J.F.1
Zentner, M.G.2
-
57
-
-
0001690679
-
A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
-
Pinto, J.M. and I.E. Grossmann. (1995). "A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants." Industrial & Engineering Chemistry Research 34, 3037-3051.
-
(1995)
Industrial & Engineering Chemistry Research
, vol.34
, pp. 3037-3051
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
58
-
-
0002584921
-
An alternate MILP model for short-term scheduling of batch plants with preordering constraints
-
Pinto, J.M. and I.E. Grossmann. (1996). "An Alternate MILP Model for Short-Term Scheduling of Batch Plants with Preordering Constraints." Industrial & Engineering Chemistry Research 35, 338-342.
-
(1996)
Industrial & Engineering Chemistry Research
, vol.35
, pp. 338-342
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
59
-
-
0032386621
-
Assignment and sequencing models for the scheduling of process systems
-
Pinto, J.M. and I.E. Grossmann. (1998). "Assignment and Sequencing Models for the Scheduling of Process Systems." Annals of Operations Research 81, 433-466.
-
(1998)
Annals of Operations Research
, vol.81
, pp. 433-466
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
60
-
-
0344267658
-
STBS: A continuous-time MILP optimization for short-term scheduling of batch plants
-
Pinto, J.M., A. Türkay, B. Bolio, and I.E. Grossmann. (1998). "STBS: A Continuous-Time MILP Optimization for Short-Term Scheduling of Batch Plants." Computers & Chemical Engineering 22, 1297-1308.
-
(1998)
Computers & Chemical Engineering
, vol.22
, pp. 1297-1308
-
-
Pinto, J.M.1
Türkay, A.2
Bolio, B.3
Grossmann, I.E.4
-
61
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
Pritsker, A.A.B., L.J. Watters, and P.M. Wolfe. (1969). "Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach." Management Science 16, 93-108.
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
63
-
-
0027676062
-
Batch process systems engineering: A retrospective and prospective review
-
Rippin, D.W.T. (1993). "Batch Process Systems Engineering: A Retrospective and Prospective Review." Computers & Chemical Engineering 17, S1-S13.
-
(1993)
Computers & Chemical Engineering
, vol.17
-
-
Rippin, D.W.T.1
-
64
-
-
0026143149
-
Reformulation of multiperiod MILP models for planning and scheduling of chemical processes
-
Sahinidis, N.V. and I.E. Grossmann. (1991b). "Reformulation of Multiperiod MILP Models for Planning and Scheduling of Chemical Processes." Computers & Chemical Engineering 15, 255-272.
-
(1991)
Computers & Chemical Engineering
, vol.15
, pp. 255-272
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
-
66
-
-
0029717404
-
A simple continuous-time process scheduling formulation and a novel solution algorithm
-
Schilling, G. and C.C. Pantelides. (1996). "A Simple Continuous-Time Process Scheduling Formulation and a Novel Solution Algorithm." Computers & Chemical Engineering 20, S1221-S1226.
-
(1996)
Computers & Chemical Engineering
, vol.20
-
-
Schilling, G.1
Pantelides, C.C.2
-
67
-
-
4143152567
-
A hybrid branch and bound algorithm for continuous-time process scheduling formulations
-
Chicago, IL, November 1996, Paper 171d
-
Schilling, G. and C.C. Pantelides. (1996b). "A Hybrid Branch and Bound Algorithm for Continuous-Time Process Scheduling Formulations." AIChE 1996 Annual Meeting, Chicago, IL, November 1996, Paper 171d.
-
(1996)
AIChE 1996 Annual Meeting
-
-
Schilling, G.1
Pantelides, C.C.2
-
69
-
-
0027545175
-
A general algorithm for short-term scheduling of batch operations-II. Computational issues
-
Shah, N., C.C. Pantelides, and R.W.H. Sargent. (1993). "A General Algorithm for Short-Term Scheduling of Batch Operations-II. Computational Issues." Computers & Chemical Engineering 17, 229-244.
-
(1993)
Computers & Chemical Engineering
, vol.17
, pp. 229-244
-
-
Shah, N.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
70
-
-
0002500749
-
A hierarchy of relaxations and convex-hull characterizations for mixed-integer zero-one programming problems
-
Sherali, H.D. and W.P. Adams. (1994). "A Hierarchy of Relaxations and Convex-Hull Characterizations for Mixed-Integer Zero-One Programming Problems." Discrete Applied Mathematics 52, 83-106.
-
(1994)
Discrete Applied Mathematics
, vol.52
, pp. 83-106
-
-
Sherali, H.D.1
Adams, W.P.2
-
71
-
-
0036453772
-
Redefining event variables for efficient modeling of continuous-time batch processing
-
Wang, S. and M. Guignard. (2002). "Redefining Event Variables for Efficient Modeling of Continuous-Time Batch Processing." Annals of Operations Research 116, 113-126.
-
(2002)
Annals of Operations Research
, vol.116
, pp. 113-126
-
-
Wang, S.1
Guignard, M.2
-
72
-
-
0029707013
-
Integrated production and distribution scheduling on a European-wide basis
-
Wilkinson, S.J., A. Cortier, N. Shah, and C.C. Pantelides. (1996). "Integrated Production and Distribution Scheduling on a European-Wide Basis." Computers & Chemical Engineering 20, S1275-S1280.
-
(1996)
Computers & Chemical Engineering
, vol.20
-
-
Wilkinson, S.J.1
Cortier, A.2
Shah, N.3
Pantelides, C.C.4
-
74
-
-
0000965083
-
Improving the efficiency of discrete time scheduling formulation
-
Yee, K.L. and N. Shah. (1998). "Improving the Efficiency of Discrete Time Scheduling Formulation." Computers & Chemical Engineering 22, S403-S410.
-
(1998)
Computers & Chemical Engineering
, vol.22
-
-
Yee, K.L.1
Shah, N.2
-
75
-
-
0034660723
-
Optimal operation of quality controlled product storage
-
Yi, G., K. Suh, B. Lee, and E.S. Lee. (2000). "Optimal Operation of Quality Controlled Product Storage." Computers & Chemical Engineering 24, 475-480.
-
(2000)
Computers & Chemical Engineering
, vol.24
, pp. 475-480
-
-
Yi, G.1
Suh, K.2
Lee, B.3
Lee, E.S.4
-
76
-
-
0031674502
-
A language for describing process scheduling problems
-
Zentner, M.G., A. Elkamel, J.F. Pekny, and G.V. Reklaitis. (1998). "A Language for Describing Process Scheduling Problems." Computers & Chemical Engineering 22, 125-145.
-
(1998)
Computers & Chemical Engineering
, vol.22
, pp. 125-145
-
-
Zentner, M.G.1
Elkamel, A.2
Pekny, J.F.3
Reklaitis, G.V.4
-
77
-
-
0028546642
-
Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes
-
Zentner, M.G., J.F. Pekny, G.V. Reklaitis, and J.N.D. Gupta. (1994). "Practical Considerations in Using Model-Based Optimization for the Scheduling and Planning of Batch/Semicontinuous Processes." Journal of Process Control 4, 259-280.
-
(1994)
Journal of Process Control
, vol.4
, pp. 259-280
-
-
Zentner, M.G.1
Pekny, J.F.2
Reklaitis, G.V.3
Gupta, J.N.D.4
-
79
-
-
0030174820
-
The optimal operation of mixed production facilities-a general formulation and some solution approaches for the solution
-
Zhang, X. and R.W.H. Sargent. (1996). "The Optimal Operation of Mixed Production Facilities-A General Formulation and Some Solution Approaches for the Solution." Computers & Chemical Engineering 20, 897-904.
-
(1996)
Computers & Chemical Engineering
, vol.20
, pp. 897-904
-
-
Zhang, X.1
Sargent, R.W.H.2
-
80
-
-
0344528710
-
The optimal operation of mixed production facilities-extensions and improvements
-
Zhang, X. and R.W.H. Sargent. (1998). "The Optimal Operation of Mixed Production Facilities-Extensions and Improvements." Computers & Chemical Engineering 22, 1287-1295.
-
(1998)
Computers & Chemical Engineering
, vol.22
, pp. 1287-1295
-
-
Zhang, X.1
Sargent, R.W.H.2
|