-
1
-
-
0141896637
-
Multi-agent systems for dynamic scheduling
-
M. Garagnani, (Ed.) , The Open University, UK
-
Cowling, P. I., Ouelhadj, D., Petrovic, S.: Multi-agent systems for dynamic scheduling, In M. Garagnani, (Ed.), Proceedings of the nineteenth workshop of planning and scheduling of the UK, The Open University, UK, 45-54(2000)
-
(2000)
Proceedings of the Nineteenth Workshop of Planning and Scheduling of the UK
, pp. 45-54
-
-
Cowling, P.I.1
Ouelhadj, D.2
Petrovic, S.3
-
2
-
-
0141896638
-
A multi-agent architecture for dynamic scheduling of steel hot rolling
-
Rochester, NY, USA
-
Cowling, P. I., Ouelhadj, D.,Petrovic, S.: A multi-agent architecture for dynamic scheduling of steel hot rolling, In Proceedings of the third international ICSC world manufacturing congress, Rochester, NY, USA, 104-111(2001)
-
(2001)
Proceedings of the Third International ICSC World Manufacturing Congress
, pp. 104-111
-
-
Cowling, P.I.1
Ouelhadj, D.2
Petrovic, S.3
-
3
-
-
0036604832
-
Using real-time information for effective dynamic scheduling
-
Cowling, P. I., Johansson, M.: Using real-time information for effective dynamic scheduling, European Journal of Operational Research, 139(2), 230-244(2002)
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 230-244
-
-
Cowling, P.I.1
Johansson, M.2
-
4
-
-
0141919583
-
A multi-agent architecture for dynamic scheduling of steel hot rolling
-
Cowling, P. I., Ouelhadj, D., Petrovic, S.: A multi-agent architecture for dynamic scheduling of steel hot rolling, Journal of Intelligent Manufacturing, 14, 457-470(2003)
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, pp. 457-470
-
-
Cowling, P.I.1
Ouelhadj, D.2
Petrovic, S.3
-
5
-
-
2442695353
-
Dynamic scheduling of steel casting and milling using multi-agents
-
Cowling, P. I., Ouelhadj, D., Petrovic, S.: Dynamic scheduling of steel casting and milling using multi-agents, Journal of Production Planning and Control, 15, 1-11(2004)
-
(2004)
Journal of Production Planning and Control
, vol.15
, pp. 1-11
-
-
Cowling, P.I.1
Ouelhadj, D.2
Petrovic, S.3
-
6
-
-
13844249860
-
Contract net protocol for cooperative optimization and dynamic scheduling of steel production
-
A. Ibraham, K. Franke, M. Koppen (Eds.) ,Berlin, Springer
-
Ouelhadj, D., Cowling, P. I., Petrovic, S.: Contract net protocol for cooperative optimization and dynamic scheduling of steel production, In A. Ibraham, K. Franke, M. Koppen (Eds.), Intelligent systems design and applications,Berlin, Springer, 457-470(2003)
-
(2003)
Intelligent Systems Design and Applications
, pp. 457-470
-
-
Ouelhadj, D.1
Cowling, P.I.2
Petrovic, S.3
-
7
-
-
0344444825
-
Utility and stability measures for agent-based dynamic scheduling of steel continuous casting
-
Taipei, Taiwan
-
Ouelhadj, D., Cowling, P. I., Petrovic, S.: Utility and stability measures for agent-based dynamic scheduling of steel continuous casting, In Proceedings of the IEEE international conference on robotics and automation,Taipei, Taiwan, 175-180(2003)
-
(2003)
Proceedings of the IEEE International Conference on Robotics and Automation
, pp. 175-180
-
-
Ouelhadj, D.1
Cowling, P.I.2
Petrovic, S.3
-
8
-
-
0033892353
-
A mathematical programming model for scheduling steelmaking-continuous casting production scheduling
-
L. X. Tang, J. Y. Liu, A. Y. Rong, and Z. H. Yang: A mathematical programming model for scheduling steelmaking-continuous casting production scheduling, European Journal of Operational Research, 120, 423-435(2000)
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 423-435
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
|