메뉴 건너뛰기




Volumn 104, Issue 2, 2006, Pages 260-270

A mixed-integer linear programming model for the continuous casting planning

Author keywords

Continuous casting; Mixed integer programming; Production planning; Steelmaking

Indexed keywords

COMPUTER SOFTWARE; CONTINUOUS CASTING; MATHEMATICAL MODELS; OPTIMIZATION; PRODUCTIVITY; SCHEDULING; STANDARDS; STEELMAKING;

EID: 33748751184     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2004.10.016     Document Type: Article
Times cited : (121)

References (21)
  • 1
    • 33748756289 scopus 로고    scopus 로고
    • Arcelor, 2004. Arcelor: a portrait, www.arcelor.com.
  • 2
    • 33748754751 scopus 로고    scopus 로고
    • Basu, S., Dutta, G., Seth, R., 2004. A survey of the application of non-optimization techniques in an integrated steel plants, in preparation for submission to Interactive Transactions of Operation Research, www.iimahd.ernet.in/~goutam/survey2.htm.
  • 3
    • 33748748752 scopus 로고    scopus 로고
    • Bekker, J., 2001. Discrete-event simulation in steel manufacturing: A case study. In: Proceedings of the International Conference on Competitive Manufacturing. Stellenbosch, South Africa, pp. 469-476.
  • 4
    • 33748742203 scopus 로고    scopus 로고
    • Bellabdaoui, A., Fiordaliso, A., Teghem, A., 2003. A model for scheduling steelmaking-continuous casting production. Conference of Euro/Informs Joint International Meeting, 06-10 July, Istanbul, Turkey.
  • 5
    • 3543146083 scopus 로고    scopus 로고
    • A linear programming model for integrated steel production and distribution planning
    • Chen M., and Wang W. A linear programming model for integrated steel production and distribution planning. International Journal of Operations & Production Management 17 (1997) 592-610
    • (1997) International Journal of Operations & Production Management , vol.17 , pp. 592-610
    • Chen, M.1    Wang, W.2
  • 7
    • 0001110087 scopus 로고    scopus 로고
    • Integration of continuous caster and hot strip mill planning for steel production
    • Cowling P., and Rezig W. Integration of continuous caster and hot strip mill planning for steel production. Journal of Scheduling 3 4 (2000) 185-208
    • (2000) Journal of Scheduling , vol.3 , Issue.4 , pp. 185-208
    • Cowling, P.1    Rezig, W.2
  • 8
    • 33748751123 scopus 로고    scopus 로고
    • A Survey of Mathematical Programming Application in Integrated Steel Plants
    • Dutta G., and Fourer R. A Survey of Mathematical Programming Application in Integrated Steel Plants. Interactive Transactions of ORMS 4 (2001) 1
    • (2001) Interactive Transactions of ORMS , vol.4 , pp. 1
    • Dutta, G.1    Fourer, R.2
  • 9
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant production
    • Harjunkoski I., and Grossmann I.E. A decomposition approach for the scheduling of a steel plant production. Computers & Chemical Engineering 25 11-12 (2001) 1647-1660
    • (2001) Computers & Chemical Engineering , vol.25 , Issue.11-12 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 10
    • 33748743569 scopus 로고    scopus 로고
    • Lee, D.-Y., 2000. Environmentally friendly scheduling for primary steelmaking processes. MS Thesis, Chemical & Biomolecular Engineering Dept. KAIST, Daejeon, Republic of Korea.
  • 13
    • 0000142257 scopus 로고
    • Cooperative scheduling and its application to steelmaking processes
    • Nuamo M., and Morishita S.I. Cooperative scheduling and its application to steelmaking processes. IEEE Transactions on Industrial Electronics 38 2 (1991) 150-155
    • (1991) IEEE Transactions on Industrial Electronics , vol.38 , Issue.2 , pp. 150-155
    • Nuamo, M.1    Morishita, S.I.2
  • 14
    • 33748753614 scopus 로고    scopus 로고
    • Pacciarelli, D., Pranzo, M., 2000. Production scheduling in a steelmaking-continuous casting plant. RT-DIA-05-2000, Università degli Studi di Roma Tre.
  • 15
    • 33748754483 scopus 로고    scopus 로고
    • De Schutter, B., 1999. Designing optimal timing and sequencing strategies for a continuous steel foundry. Proceedings of the European Control Conference 1999 (ECC'99), Karlsruhe, Germany, August-September, 1999, Paper 160/BP-2.6.
  • 16
    • 0032000378 scopus 로고    scopus 로고
    • Evaluation of ordering strategies for constraint satisfaction reactive scheduling
    • Suh M.S., Lee A., Lee Y.J., and Ko Y.K. Evaluation of ordering strategies for constraint satisfaction reactive scheduling. Decision Support Systems 22 (1998) 187-197
    • (1998) Decision Support Systems , vol.22 , pp. 187-197
    • Suh, M.S.1    Lee, A.2    Lee, Y.J.3    Ko, Y.K.4
  • 17
    • 0033892353 scopus 로고    scopus 로고
    • A mathematical programming model for scheduling steelmaking-continuous casting production
    • Tang L., Liu J., Rong A., and Yang Z. A mathematical programming model for scheduling steelmaking-continuous casting production. European Journal of Operational Research 120 (2000) 423-435
    • (2000) European Journal of Operational Research , vol.120 , pp. 423-435
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 18
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang L., Liu J., Rong A., and Yang Z. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research 133 (2001) 1-20
    • (2001) European Journal of Operational Research , vol.133 , pp. 1-20
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 20
    • 33748756635 scopus 로고    scopus 로고
    • Teghem, J., 2003. Programmation linéaire (2ème édition), Collection Statistique et Mathématiques Appliquées, Editions de l'Université de Bruxelles et Ellipses.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.