메뉴 건너뛰기




Volumn 6, Issue 4, 2012, Pages 797-824

Optimization framework for process scheduling of operation-dependent automobile assembly lines

Author keywords

Assembly Line Balancing (ALB); Car Sequencing (CS); Continuous manufacturing; Mixed Integer Linear Programming (MILP); Mixed model assembly line; Operation assignment; Operation Process Precision (OPP)

Indexed keywords

ASSEMBLY LINE BALANCING; CAR SEQUENCING; MIXED-INTEGER LINEAR PROGRAMMING; MIXED-MODEL ASSEMBLY LINES; OPERATION ASSIGNMENT; OPERATION PROCESS;

EID: 84859158409     PISSN: 18624472     EISSN: 18624480     Source Type: Journal    
DOI: 10.1007/s11590-011-0303-5     Document Type: Article
Times cited : (12)

References (42)
  • 1
    • 0030383250 scopus 로고    scopus 로고
    • Relevance of assembly in global manufacturing
    • Feldmann K., Rottbauer H., Roth N.: Relevance of assembly in global manufacturing. Ann. CIRP 45, 545-552 (1996).
    • (1996) Ann. CIRP , vol.45 , pp. 545-552
    • Feldmann, K.1    Rottbauer, H.2    Roth, N.3
  • 2
    • 84859158078 scopus 로고    scopus 로고
    • The 1,000,000th vehicle produced at BMW manufacturing Co. in spartanburg automotive industries
    • Larkin J.: The 1,000,000th vehicle produced at BMW manufacturing Co. in spartanburg automotive industries. Automot. Ind. 186, 55 (2006).
    • (2006) Automot. Ind. , vol.186 , pp. 55
    • Larkin, J.1
  • 3
    • 48249086606 scopus 로고    scopus 로고
    • From mass production to mass customization: Hindrance factors, structural inertia, and transition hazard
    • Rungtusanatham M. J., Salvador F.: From mass production to mass customization: Hindrance factors, structural inertia, and transition hazard. Prod. Oper. Manage. 17, 385-396 (2008).
    • (2008) Prod. Oper. Manage. , vol.17 , pp. 385-396
    • Rungtusanatham, M.J.1    Salvador, F.2
  • 4
    • 79956353405 scopus 로고    scopus 로고
    • Improvement of earliness and lateness by postponement on an automotive production line
    • Fournier X., Agard B.: Improvement of earliness and lateness by postponement on an automotive production line. Int. J. Flexible Manuf. Syst. 19, 107-121 (2007).
    • (2007) Int. J. Flexible Manuf. Syst. , vol.19 , pp. 107-121
    • Fournier, X.1    Agard, B.2
  • 5
    • 84891488740 scopus 로고    scopus 로고
    • About the efficiency and cost reduction of parallel mixed-model assembly lines
    • Berlin, Germany, March
    • Hazbany, S., Gilad, I., Shpitalni, M.: About the efficiency and cost reduction of parallel mixed-model assembly lines. The 17th CIRP Design Conference, Berlin, Germany, March 27-28 (2007).
    • (2007) The 17th CIRP Design Conference , pp. 27-28
    • Hazbany, S.1    Gilad, I.2    Shpitalni, M.3
  • 6
    • 0035130068 scopus 로고    scopus 로고
    • Balancing mixed-model assembly lines to reduce work overload
    • Matanachai S., Yano C. A.: Balancing mixed-model assembly lines to reduce work overload. IIE Trans. 33, 29-42 (2001).
    • (2001) IIE Trans. , vol.33 , pp. 29-42
    • Matanachai, S.1    Yano, C.A.2
  • 7
    • 56249121909 scopus 로고    scopus 로고
    • Modeling and analysis of build-to-order supply chains
    • Gunasekaran A., Ngai E.: Modeling and analysis of build-to-order supply chains. Eur. J. Oper. Res. 195, 319-334 (2009).
    • (2009) Eur. J. Oper. Res. , vol.195 , pp. 319-334
    • Gunasekaran, A.1    Ngai, E.2
  • 8
    • 0037448813 scopus 로고    scopus 로고
    • An enumerative heuristic and reduction methods for the assembly line balancing problem
    • Fleszar K., Hindi K. S.: An enumerative heuristic and reduction methods for the assembly line balancing problem. Eur. J. Oper. Res. 145, 606-620 (2003).
    • (2003) Eur. J. Oper. Res. , vol.145 , pp. 606-620
    • Fleszar, K.1    Hindi, K.S.2
  • 9
    • 0010682431 scopus 로고
    • Scheduling flowshops with parallel machines and finite in-process buffers by multilevel programming
    • Sawik T. J.: Scheduling flowshops with parallel machines and finite in-process buffers by multilevel programming. Lecture Notes Control Inf. Sci. 113, 691-700 (1988).
    • (1988) Lecture Notes Control Inf. Sci. , vol.113 , pp. 691-700
    • Sawik, T.J.1
  • 10
    • 25144486368 scopus 로고    scopus 로고
    • An linear programming based lower bound for the simple assembly line balancing problem
    • Peeters M., Degraeve Z.: An linear programming based lower bound for the simple assembly line balancing problem. Eur. J. Oper. Res. 168, 716-731 (2006).
    • (2006) Eur. J. Oper. Res. , vol.168 , pp. 716-731
    • Peeters, M.1    Degraeve, Z.2
  • 11
    • 0035295083 scopus 로고    scopus 로고
    • Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
    • Drexl A., Kimms A.: Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints. Manage. Sci. 47, 480-491 (2001).
    • (2001) Manage. Sci. , vol.47 , pp. 480-491
    • Drexl, A.1    Kimms, A.2
  • 12
    • 33646399781 scopus 로고    scopus 로고
    • Algorithms for the car sequencing and the level scheduling problem
    • Drexl A., Kimms A., Matthießen L.: Algorithms for the car sequencing and the level scheduling problem. J. Sched. 9, 153-176 (2006).
    • (2006) J. Sched. , vol.9 , pp. 153-176
    • Drexl, A.1    Kimms, A.2    Matthießen, L.3
  • 13
    • 50349103078 scopus 로고    scopus 로고
    • Heuristics for an industrial car sequencing problem considering paint and assembly shop objectives
    • Joly A., Frein Y.: Heuristics for an industrial car sequencing problem considering paint and assembly shop objectives. Comput. Ind. Eng. 55, 295-310 (2008).
    • (2008) Comput. Ind. Eng. , vol.55 , pp. 295-310
    • Joly, A.1    Frein, Y.2
  • 14
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • Boysen N., Fliedner M., Scholl A.: Sequencing mixed-model assembly lines: Survey, classification and model critique. Eur. J. Oper. Res. 192, 349-373 (2009).
    • (2009) Eur. J. Oper. Res. , vol.192 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 15
    • 27144475350 scopus 로고    scopus 로고
    • Review and comparison of three methods for the solution of the car sequencing problem
    • Gravel M., Gagné C., Price W. L.: Review and comparison of three methods for the solution of the car sequencing problem. J. Oper. Res. Soc. 56, 1287-1295 (2005).
    • (2005) J. Oper. Res. Soc. , vol.56 , pp. 1287-1295
    • Gravel, M.1    Gagné, C.2    Price, W.L.3
  • 16
    • 44649088988 scopus 로고    scopus 로고
    • An integer linear programming approach and a hybrid variable neighborhood search for the car sequencing problem
    • Prandtstetter M., Raidl G.: An integer linear programming approach and a hybrid variable neighborhood search for the car sequencing problem. Eur. J. Oper. Res. 191, 1004-1022 (2008).
    • (2008) Eur. J. Oper. Res. , vol.191 , pp. 1004-1022
    • Prandtstetter, M.1    Raidl, G.2
  • 17
    • 0037121160 scopus 로고    scopus 로고
    • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
    • Sawik T.: Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. Eur. J. Oper. Res. 143, 115-124 (2002).
    • (2002) Eur. J. Oper. Res. , vol.143 , pp. 115-124
    • Sawik, T.1
  • 18
    • 52649092892 scopus 로고    scopus 로고
    • Enhanced performance of overlap flow-shop scheduling involving reworking and a time buffer
    • Lee S. C., Hsu T. S., Chuang S. P., Yang C. L.: Enhanced performance of overlap flow-shop scheduling involving reworking and a time buffer. Int. J. Adv. Manuf. Technol. 39, 142-150 (2008).
    • (2008) Int. J. Adv. Manuf. Technol. , vol.39 , pp. 142-150
    • Lee, S.C.1    Hsu, T.S.2    Chuang, S.P.3    Yang, C.L.4
  • 19
    • 43449085514 scopus 로고    scopus 로고
    • The sequence-dependent assembly line balancing problem
    • Scholl A., Boysen N., Fliedner M.: The sequence-dependent assembly line balancing problem. OR Spectrum 30, 579-609 (2008).
    • (2008) OR Spectrum , vol.30 , pp. 579-609
    • Scholl, A.1    Boysen, N.2    Fliedner, M.3
  • 20
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas C. A., Lin X.: Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computes Chem. Eng. 28, 2109-2129 (2004).
    • (2004) Computes Chem. Eng. , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 21
    • 25144491255 scopus 로고    scopus 로고
    • Mixed integer linear programming in process scheduling: modeling, algorithms, and applications
    • Floudas C. A., Lin X.: Mixed integer linear programming in process scheduling: modeling, algorithms, and applications. Ann. Oper. Res. 139, 131-162 (2005).
    • (2005) Ann. Oper. Res. , vol.139 , pp. 131-162
    • Floudas, C.A.1    Lin, X.2
  • 22
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes
    • Ierapetritou M. G., Floudas C. A.: Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes. Ind. Eng. Chem. Res. 37, 4341-4359 (1998).
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 23
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling 2. continuous and semi-continuous process
    • Ierapetritou M. G., Floudas C. A.: Effective continuous-time formulation for short-term scheduling 2. continuous and semi-continuous process. Ind. Eng. Chem. Res. 37, 4360-4374 (1998).
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 24
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling 3. Multiple intermediate due dates
    • Ierapetritou M. G., Hene T. S., Floudas C. A.: Effective continuous-time formulation for short-term scheduling 3. Multiple intermediate due dates. Ind. Eng. Chem. Res. 38, 3446-3461 (1999).
    • (1999) Ind. Eng. Chem. Res. , vol.38 , pp. 3446-3461
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 25
    • 0035340986 scopus 로고    scopus 로고
    • Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation
    • Lin X., Floudas C. A.: Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation. Comput. Chem. Eng. 25, 665-674 (2001).
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 665-674
    • Lin, X.1    Floudas, C.A.2
  • 26
    • 0037036735 scopus 로고    scopus 로고
    • Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
    • Lin X., Floudas C. A., Modi S., Juhasz N. M.: Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant. Ind. Eng. Chem. Res. 41, 3884-3906 (2002).
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 3884-3906
    • Lin, X.1    Floudas, C.A.2    Modi, S.3    Juhasz, N.M.4
  • 27
    • 0141678021 scopus 로고    scopus 로고
    • Scheduling of tanker lightering via a novel continuous-time optimization framework
    • Lin X., Chajakis E. D., Floudas C. A.: Scheduling of tanker lightering via a novel continuous-time optimization framework. Ind. Eng. Chem. Res. 42, 4441-4451 (2003).
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 4441-4451
    • Lin, X.1    Chajakis, E.D.2    Floudas, C.A.3
  • 28
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I Bounded uncertainty
    • Lin X., Janak S. L., Floudas C. A.: A new robust optimization approach for scheduling under uncertainty: I Bounded uncertainty. Comput. Chem. Eng. 28, 1069-1085 (2004).
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 29
    • 2442436591 scopus 로고    scopus 로고
    • Enhance continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak S. L., Lin X., Floudas C. A.: Enhance continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind. Eng. Chem. Res. 43, 2516-2533 (2004).
    • (2004) Ind. Eng. Chem. Res. , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 30
    • 11844290763 scopus 로고    scopus 로고
    • Comments on Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak S. L., Lin X., Floudas C. A.: Comments on "Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies". Ind. Eng. Chem. Res. 44, 426 (2005).
    • (2005) Ind. Eng. Chem. Res. , vol.44 , pp. 426
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 31
    • 33846049584 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant I. Short-term and medium-term scheduling
    • Janak S. L., Floudas C. A., Kallrath J., Vormbrock N.: Production scheduling of a large-scale industrial batch plant I. Short-term and medium-term scheduling. Ind. Eng. Chem. Res. 45, 8234-8252 (2006).
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 8234-8252
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 32
    • 33846071077 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant II. Reactive scheduling
    • Janak S. L., Floudas C. A., Kallrath J., Vormbrock N.: Production scheduling of a large-scale industrial batch plant II. Reactive scheduling. Ind. Eng. Chem. Res. 45, 8253-8269 (2006).
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 8253-8269
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 33
    • 33845624253 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty II Uncertainty with known probability distribution
    • Janak S. L., Lin X., Floudas C. A.: A new robust optimization approach for scheduling under uncertainty II Uncertainty with known probability distribution. Comput. Chem. Eng. 31, 171-195 (2007).
    • (2007) Comput. Chem. Eng. , vol.31 , pp. 171-195
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 34
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting
    • Janak S. L., Floudas C. A.: Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting. Comput. Chem. Eng. 32, 913-955 (2008).
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 35
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study
    • Shaik M. A., Janak S. L., Floudas C. A.: Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study. Ind. Eng. Chem. Res. 45, 6190-6209 (2006).
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 36
    • 33947498929 scopus 로고    scopus 로고
    • Improved unit-specific event-based model continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements
    • Shaik M. A., Floudas C. A.: Improved unit-specific event-based model continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements. Ind. Eng. Chem. Res. 46, 1764-1779 (2007).
    • (2007) Ind. Eng. Chem. Res. , vol.46 , pp. 1764-1779
    • Shaik, M.A.1    Floudas, C.A.2
  • 37
    • 35549009402 scopus 로고    scopus 로고
    • Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN Framework
    • Shaik M. A., Floudas C. A.: Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN Framework. Comput. Chem. Eng. 32, 260-274 (2008).
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 260-274
    • Shaik, M.A.1    Floudas, C.A.2
  • 38
    • 65349119397 scopus 로고    scopus 로고
    • Novel unified modeling approach for short-term scheduling
    • Shaik M. A., Floudas C. A.: Novel unified modeling approach for short-term scheduling. Ind. Eng. Chem. Res. 48, 2947-2964 (2009).
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 2947-2964
    • Shaik, M.A.1    Floudas, C.A.2
  • 39
    • 74349131396 scopus 로고    scopus 로고
    • Recipe determination and scheduling of gasoline blending operations
    • Li J., Karimi I. A., Srinivasan R.: Recipe determination and scheduling of gasoline blending operations. AIChE J. 56, 441-465 (2010).
    • (2010) AIChE J. , vol.56 , pp. 441-465
    • Li, J.1    Karimi, I.A.2    Srinivasan, R.3
  • 40
    • 77955820606 scopus 로고    scopus 로고
    • A novel approach for short-term scheduling of multipurpose batch plants
    • Susarla N., Li J., Karimi I. A.: A novel approach for short-term scheduling of multipurpose batch plants. AIChE J. 56, 1859-1879 (2010).
    • (2010) AIChE J. , vol.56 , pp. 1859-1879
    • Susarla, N.1    Li, J.2    Karimi, I.A.3
  • 41
    • 79955548378 scopus 로고    scopus 로고
    • Optimal event point determination for short-term scheduling of multipurpose batch plants
    • Li J., Floudas C. A.: Optimal event point determination for short-term scheduling of multipurpose batch plants. Ind. Eng. Chem. Res. 49, 7446-7469 (2010).
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 7446-7469
    • Li, J.1    Floudas, C.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.