메뉴 건너뛰기




Volumn 16, Issue 6, 2012, Pages 3876-3890

Review of international grid codes for wind power integration: Diversity, technology and a case for global standard

Author keywords

Compliance technologies; Grid code regulations; Wind power plants

Indexed keywords

ACTIVE POWER; COMPREHENSIVE STUDIES; CONNECTION REQUIREMENTS; EXTENDED RANGE; FUTURE TRENDS; GLOBAL HARMONIZATION; GLOBAL STANDARDS; GRID CODE REQUIREMENTS; GRID CODES; HIGH VOLTAGE; INTERNATIONAL GRIDS; RIDETHROUGH CAPABILITY; SYSTEM OPERATOR; TRANSMISSION SYSTEM OPERATORS; WIND FARM; WIND GENERATOR SYSTEMS; WIND POWER INTEGRATIONS;

EID: 84860222524     PISSN: 13640321     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rser.2012.03.039     Document Type: Review
Times cited : (281)

References (104)
  • 7
    • 40249107787 scopus 로고    scopus 로고
    • Advanced grid requirements for the integration of wind farms into the Spanish transmission system
    • A. Morales, X. Robe, J.L.R. Amenedo, S. Arnaltes, R. Zubiaur, and Z. Torbado Advanced grid requirements for the integration of wind farms into the Spanish transmission system IET Renew Power Gener 2 1 2007 47 59
    • (2007) IET Renew Power Gener , vol.2 , Issue.1 , pp. 47-59
    • Morales, A.1    Robe, X.2    Amenedo, J.L.R.3    Arnaltes, S.4    Zubiaur, R.5    Torbado, Z.6
  • 8
    • 25144444348 scopus 로고    scopus 로고
    • International comparison of requirements for connection of wind turbines to power systems
    • C. Jauch, J. Matevosyan, T. Ackermann, and S. Bolik International comparison of requirements for connection of wind turbines to power systems Wind Energy 8 8 Jul 2005 295 306
    • (2005) Wind Energy , vol.8 , Issue.8 , pp. 295-306
    • Jauch, C.1    Matevosyan, J.2    Ackermann, T.3    Bolik, S.4
  • 11
    • 70349579256 scopus 로고    scopus 로고
    • A review of grid code technical requirements for wind farms
    • SEPTEMBER 3
    • M. Tsili, and S. Papathanassiou A review of grid code technical requirements for wind farms IET Renew Power Gener 3 September (3) 2009 308 332
    • (2009) IET Renew Power Gener , vol.3 , pp. 308-332
    • Tsili, M.1    Papathanassiou, S.2
  • 13
    • 71549131076 scopus 로고    scopus 로고
    • Union for the Co-ordination of Transmission of Electricity
    • Union for the Co-ordination of Transmission of Electricity. Final report on the disturbances on 4 November 2006. Available at: http://entsoe.eu/.
    • Final Report on the Disturbances on 4 November 2006
  • 17
    • 36348950411 scopus 로고    scopus 로고
    • Wind farms as reactive power ancillary service providers - Technical and economic issues
    • NOVEMBER 4
    • N.R. Ullah, K. Bhattacharya, and T. Thiringer Wind farms as reactive power ancillary service providers - technical and economic issues IEEE Trans Power Syst 22 November (4) 2007 1647 1656
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 1647-1656
    • Ullah, N.R.1    Bhattacharya, K.2    Thiringer, T.3
  • 18
    • 28244449042 scopus 로고    scopus 로고
    • Frequency control and wind turbine technologies
    • NOVEMBER 4
    • G. Lalor, A. Mullane, and M. O'Malley Frequency control and wind turbine technologies IEEE Trans Power Syst 20 November (4) 2005 1905 1913
    • (2005) IEEE Trans Power Syst , vol.20 , pp. 1905-1913
    • Lalor, G.1    Mullane, A.2    O'Malley, M.3
  • 20
    • 28244480269 scopus 로고    scopus 로고
    • Control of DFIG based wind generation for power network support
    • NOVEMBER 4
    • F.M. Hughes, O.A. Lara, N. Jenkins, and G. Strbac Control of DFIG based wind generation for power network support IEEE Trans Power Syst 20 November (4) 2005 1958 1966
    • (2005) IEEE Trans Power Syst , vol.20 , pp. 1958-1966
    • Hughes, F.M.1    Lara, O.A.2    Jenkins, N.3    Strbac, G.4
  • 21
    • 33947670511 scopus 로고    scopus 로고
    • Survey of failures in wind power systems with focus on Swedish wind power plants during 1997-2005
    • MARCH 1
    • J. Ribrant, and L.M. Bertling Survey of failures in wind power systems with focus on Swedish wind power plants during 1997-2005 IEEE Trans Energy Convers 22 March (1) 2007 167 173
    • (2007) IEEE Trans Energy Convers , vol.22 , pp. 167-173
    • Ribrant, J.1    Bertling, L.M.2
  • 23
    • 28544434086 scopus 로고    scopus 로고
    • Fault recovery of a wind farm with fixed speed induction generators using a STATCOM
    • M. Aten, J. Martinez, and P.J. Cartwright Fault recovery of a wind farm with fixed speed induction generators using a STATCOM Wind Eng 29 4 2005 365 375
    • (2005) Wind Eng , vol.29 , Issue.4 , pp. 365-375
    • Aten, M.1    Martinez, J.2    Cartwright, P.J.3
  • 24
    • 34248531677 scopus 로고    scopus 로고
    • Real-time analysis of the transient response improvement of fixed-speed wind farms by using a reduced-scale STATCOM prototype
    • MAY 2
    • H. Gaztanaga, I.E. Otadui, D. Ocnasu, and S. Bacha Real-time analysis of the transient response improvement of fixed-speed wind farms by using a reduced-scale STATCOM prototype IEEE Trans Power Syst 22 May (2) 2007 658 666
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 658-666
    • Gaztanaga, H.1    Otadui, I.E.2    Ocnasu, D.3    Bacha, S.4
  • 25
    • 44449177072 scopus 로고    scopus 로고
    • Low voltage ride through of wind farms with cage generators: STATCOM versus SVC
    • MAY 3
    • M. Molinas, J.A. Suul, and T. Undeland Low voltage ride through of wind farms with cage generators: STATCOM versus SVC IEEE Trans Power Electron 23 May (3) 2008 1104 1117
    • (2008) IEEE Trans Power Electron , vol.23 , pp. 1104-1117
    • Molinas, M.1    Suul, J.A.2    Undeland, T.3
  • 26
    • 77957014289 scopus 로고    scopus 로고
    • Simultaneous STATCOM and pitch angle control for improved LVRT capability of fixed-speed wind turbines
    • OCTOBER 3
    • H.M.J. Hossain, H.R. Pota, V.A. Ugrinovskii, and R.A. Ramos Simultaneous STATCOM and pitch angle control for improved LVRT capability of fixed-speed wind turbines IEEE Trans Sustain Energy 1 October (3) 2010 142 151
    • (2010) IEEE Trans Sustain Energy , vol.1 , pp. 142-151
    • Hossain, H.M.J.1    Pota, H.R.2    Ugrinovskii, V.A.3    Ramos, R.A.4
  • 27
    • 34247259949 scopus 로고    scopus 로고
    • Stability improvement of induction generator-based wind turbine systems
    • MARCH 1
    • Z. Chen, Y. Hu, and F. Blaabjerg Stability improvement of induction generator-based wind turbine systems IET Renew Power Gener 1 March (1) 2007 81 93
    • (2007) IET Renew Power Gener , vol.1 , pp. 81-93
    • Chen, Z.1    Hu, Y.2    Blaabjerg, F.3
  • 28
    • 65349149570 scopus 로고    scopus 로고
    • Rating requirements of the unified power quality conditioner to integrate the fixed speed induction generator-type wind generation to the grid
    • JUNE 2
    • N.G. Jayanti, M. Basu, M.F. Conlon, and K. Gaughan Rating requirements of the unified power quality conditioner to integrate the fixed speed induction generator-type wind generation to the grid IET Renew Power Gener 3 June (2) 2009 131 141
    • (2009) IET Renew Power Gener , vol.3 , pp. 131-141
    • Jayanti, N.G.1    Basu, M.2    Conlon, M.F.3    Gaughan, K.4
  • 29
    • 79951952006 scopus 로고    scopus 로고
    • Low voltage ride-through capability for wind generators based on dynamic voltage restorers
    • MARCH 1
    • D. Ramirez, S. Martinez, C.A. Paltero, F. Blazquez, and R.M. de Castro Low voltage ride-through capability for wind generators based on dynamic voltage restorers IEEE Trans Energy Convers 26 March (1) 2011 195 203
    • (2011) IEEE Trans Energy Convers , vol.26 , pp. 195-203
    • Ramirez, D.1    Martinez, S.2    Paltero, C.A.3    Blazquez, F.4    De Castro, R.M.5
  • 30
    • 33746882451 scopus 로고    scopus 로고
    • Transient stability enhancement of wind generator by a new logical pitch controller
    • AUGUST 8
    • S.M. Muyeen, M.H. Ali, T. Murata, and J. Tamura Transient stability enhancement of wind generator by a new logical pitch controller IEEE Trans Power Energy 126 August (8) 2006 742 752
    • (2006) IEEE Trans Power Energy , vol.126 , pp. 742-752
    • Muyeen, S.M.1    Ali, M.H.2    Murata, T.3    Tamura, J.4
  • 31
    • 2542511558 scopus 로고    scopus 로고
    • Improvement of induction generator stability using braking resistors
    • MAY 2
    • W. Freitas, A. Morelato, and W. Xu Improvement of induction generator stability using braking resistors IEEE Trans Power Syst 19 May (2) 2004 1247 1249
    • (2004) IEEE Trans Power Syst , vol.19 , pp. 1247-1249
    • Freitas, W.1    Morelato, A.2    Xu, W.3
  • 32
    • 34548072222 scopus 로고    scopus 로고
    • Fault ride-through of large wind farms using series dynamic braking resistors (March 2007)
    • AUGUST 3
    • A. Causebrook, D.J. Atkinson, and A.G. Jack Fault ride-through of large wind farms using series dynamic braking resistors (March 2007) IEEE Trans Power Syst 22 August (3) 2007 966 975
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 966-975
    • Causebrook, A.1    Atkinson, D.J.2    Jack, A.G.3
  • 33
    • 0038208158 scopus 로고    scopus 로고
    • Application of a static reactive power compensator (STATCOM) and a dynamic braking resistor (DBR) for the stability enhancement of a large wind farm
    • X. Wu, A. Arulampalam, C. Zhan, and N. Jenkins Application of a static reactive power compensator (STATCOM) and a dynamic braking resistor (DBR) for the stability enhancement of a large wind farm Wind Eng 27 2 2003 93 106
    • (2003) Wind Eng , vol.27 , Issue.2 , pp. 93-106
    • Wu, X.1    Arulampalam, A.2    Zhan, C.3    Jenkins, N.4
  • 35
    • 33646569129 scopus 로고    scopus 로고
    • Terminal-voltage and output-power regulation of wind-turbine generator by series and parallel compensation using SMES
    • MAY 3
    • T. Kinjo, T. Senjyu, N. Urasaki, and H. Fujita Terminal-voltage and output-power regulation of wind-turbine generator by series and parallel compensation using SMES Proc IEE Gener Transm Distrib 153 May (3) 2006 276 282
    • (2006) Proc IEE Gener Transm Distrib , vol.153 , pp. 276-282
    • Kinjo, T.1    Senjyu, T.2    Urasaki, N.3    Fujita, H.4
  • 36
    • 34748851435 scopus 로고    scopus 로고
    • Comparative study on transient stability analysis of wind turbine generator system using different drive train models
    • JUNE 2
    • S.M. Muyeen, M. Hasan Ali, R. Takahashi, T. Murata, J. Tamura, and Y. Tomaki Comparative study on transient stability analysis of wind turbine generator system using different drive train models IET Renew Power Gener 1 June (2) 2007 131 141
    • (2007) IET Renew Power Gener , vol.1 , pp. 131-141
    • Muyeen, S.M.1    Hasan Ali, M.2    Takahashi, R.3    Murata, T.4    Tamura, J.5    Tomaki, Y.6
  • 37
    • 73849139642 scopus 로고    scopus 로고
    • Comparison of stabilization methods for fixed-speed wind generator systems
    • JANUARY 1
    • M.H. Ali, and B. Wu Comparison of stabilization methods for fixed-speed wind generator systems IEEE Trans Power Deliv 25 January (1) 2010 323 331
    • (2010) IEEE Trans Power Deliv , vol.25 , pp. 323-331
    • Ali, M.H.1    Wu, B.2
  • 38
    • 80053064904 scopus 로고    scopus 로고
    • Impacts of symmetrical and asymmetrical voltage sags on DFIG-based wind turbines considering phase-angle jump, voltage recovery, and sag parameters
    • MAY 5
    • M. Mohseni, S.M. Islam, and M.A.S. Masoum Impacts of symmetrical and asymmetrical voltage sags on DFIG-based wind turbines considering phase-angle jump, voltage recovery, and sag parameters IEEE Trans Power Electron 26 May (5) 2011 1587 1598
    • (2011) IEEE Trans Power Electron , vol.26 , pp. 1587-1598
    • Mohseni, M.1    Islam, S.M.2    Masoum, M.A.S.3
  • 40
    • 20544451598 scopus 로고    scopus 로고
    • Ride-through of wind turbines with doubly fed induction generator during a voltage dip
    • JUNE 2
    • J. Morren, and S. de Haan Ride-through of wind turbines with doubly fed induction generator during a voltage dip IEEE Trans Energy Convers 20 June (2) 2005 435 441
    • (2005) IEEE Trans Energy Convers , vol.20 , pp. 435-441
    • Morren, J.1    De Haan, S.2
  • 41
    • 48449098817 scopus 로고    scopus 로고
    • An improved fault ride-through strategy for doubly fed induction generator based wind turbines
    • A.H. Kasem, E.F. El-Saadany, H.H. El-Tamaly, and M.A.A. Wahab An improved fault ride-through strategy for doubly fed induction generator based wind turbines IET Renew Power Gener 2 4 2008 201 214
    • (2008) IET Renew Power Gener , vol.2 , Issue.4 , pp. 201-214
    • Kasem, A.H.1    El-Saadany, E.F.2    El-Tamaly, H.H.3    Wahab, M.A.A.4
  • 42
    • 44449177025 scopus 로고    scopus 로고
    • A fault tolerant doubly fed induction generator wind turbine using a parallel grid side rectifier and series grid side converter
    • MAY 3
    • P.S. Flannery, and G. Venkataramanan A fault tolerant doubly fed induction generator wind turbine using a parallel grid side rectifier and series grid side converter IEEE Trans Power Electron 23 May (3) 2008 1126 1134
    • (2008) IEEE Trans Power Electron , vol.23 , pp. 1126-1134
    • Flannery, P.S.1    Venkataramanan, G.2
  • 43
    • 70349973760 scopus 로고    scopus 로고
    • Unbalanced voltage sag ride-through of a doubly fed induction generator wind turbine with series grid-side converter
    • SEPTEMBER/OCTOBER 5
    • P.S. Flannery, and G. Venkataramanan Unbalanced voltage sag ride-through of a doubly fed induction generator wind turbine with series grid-side converter IEEE Trans Ind Appl 45 September/October (5) 2009 1879 1887
    • (2009) IEEE Trans Ind Appl , vol.45 , pp. 1879-1887
    • Flannery, P.S.1    Venkataramanan, G.2
  • 44
    • 70349616083 scopus 로고    scopus 로고
    • Ride through of wind turbines with doubly fed induction generator under symmetrical voltage dips
    • OCTOBER 10
    • J. Lopez, E. Gubia, E. Olea, J. Ruiz, and L. Marroyo Ride through of wind turbines with doubly fed induction generator under symmetrical voltage dips IEEE Trans Ind Electron 56 October (10) 2009 4246 4254
    • (2009) IEEE Trans Ind Electron , vol.56 , pp. 4246-4254
    • Lopez, J.1    Gubia, E.2    Olea, E.3    Ruiz, J.4    Marroyo, L.5
  • 45
    • 77951998912 scopus 로고    scopus 로고
    • A dynamic LVRT solution for doubly fed induction generators
    • JANUARY 1
    • O.A. Baqi, and A. Nasiri A dynamic LVRT solution for doubly fed induction generators IEEE Trans Power Electron 25 January (1) 2010 193 196
    • (2010) IEEE Trans Power Electron , vol.25 , pp. 193-196
    • Baqi, O.A.1    Nasiri, A.2
  • 46
    • 77952953407 scopus 로고    scopus 로고
    • A series-dynamic-resistor-based converter protection scheme for doubly-fed induction generator during various fault conditions
    • JUNE 2
    • J. Yang, J.E. Fletcher, and J. O'Reilly A series-dynamic-resistor-based converter protection scheme for doubly-fed induction generator during various fault conditions IEEE Trans Energy Convers 25 June (2) 2010 422 432
    • (2010) IEEE Trans Energy Convers , vol.25 , pp. 422-432
    • Yang, J.1    Fletcher, J.E.2    O'Reilly, J.3
  • 47
    • 78649955821 scopus 로고    scopus 로고
    • Voltage-sag tolerance of DFIG wind turbine with a series grid side passive-impedance network
    • DECEMBER 4
    • X. Yan, G. Venkataramanan, P.S. Flannery, Y. Wang, Q. Dong, and B. Zhang Voltage-sag tolerance of DFIG wind turbine with a series grid side passive-impedance network IEEE Trans Energy Convers 24 December (4) 2010 1048 1056
    • (2010) IEEE Trans Energy Convers , vol.24 , pp. 1048-1056
    • Yan, X.1    Venkataramanan, G.2    Flannery, P.S.3    Wang, Y.4    Dong, Q.5    Zhang, B.6
  • 48
    • 33947430524 scopus 로고    scopus 로고
    • Control of a doubly fed induction generator in a wind turbine during grid fault ride through
    • SEPTEMBER 3
    • D. Xiang, L. Ran, P. Tavner, and S. Yang Control of a doubly fed induction generator in a wind turbine during grid fault ride through IEEE Trans Energy Convers 21 September (3) 2006 652 662
    • (2006) IEEE Trans Energy Convers , vol.21 , pp. 652-662
    • Xiang, D.1    Ran, L.2    Tavner, P.3    Yang, S.4
  • 49
    • 33947313847 scopus 로고    scopus 로고
    • Dynamic modeling and control of DFIG based wind turbines under unbalanced network conditions
    • FEBRUARY 1
    • L. Xu, and Y. Wang Dynamic modeling and control of DFIG based wind turbines under unbalanced network conditions IEEE Trans Power Syst 22 February (1) 2007 314 323
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 314-323
    • Xu, L.1    Wang, Y.2
  • 50
    • 44449142859 scopus 로고    scopus 로고
    • Coordinated control of DFIG's rotor and grid side converters during network unbalance
    • MAY 3
    • L. Xu Coordinated control of DFIG's rotor and grid side converters during network unbalance IEEE Trans Power Electron 23 May (3) 2008 1041 1049
    • (2008) IEEE Trans Power Electron , vol.23 , pp. 1041-1049
    • Xu, L.1
  • 51
    • 57749096905 scopus 로고    scopus 로고
    • Ride-through control of a doubly-fed induction generator under unbalanced voltage sags
    • DECEMBER 4
    • O.G. Bellmunt, A.J. Ferre, A. Sumper, and J.B. Jane Ride-through control of a doubly-fed induction generator under unbalanced voltage sags IEEE Trans Energy Convers 23 December (4) 2008 1036 1045
    • (2008) IEEE Trans Energy Convers , vol.23 , pp. 1036-1045
    • Bellmunt, O.G.1    Ferre, A.J.2    Sumper, A.3    Jane, J.B.4
  • 52
    • 61649105219 scopus 로고    scopus 로고
    • Operation of grid-connected DFIG under unbalanced grid voltage condition
    • MARCH 1
    • Y. Zhou, P. Bauer, J. Pierik, and J.A. Ferreira Operation of grid-connected DFIG under unbalanced grid voltage condition IEEE Trans Energy Convers 24 March (1) 2009 240 246
    • (2009) IEEE Trans Energy Convers , vol.24 , pp. 240-246
    • Zhou, Y.1    Bauer, P.2    Pierik, J.3    Ferreira, J.A.4
  • 53
  • 54
    • 77956016481 scopus 로고    scopus 로고
    • Coordinated control approaches for low-voltage ride-through enhancement in wind turbines with doubly fed induction generators
    • SEPTEMBER 3
    • M. Rahimi, and M. Parniani Coordinated control approaches for low-voltage ride-through enhancement in wind turbines with doubly fed induction generators IEEE Trans Energy Convers 25 September (3) 2010 873 883
    • (2010) IEEE Trans Energy Convers , vol.25 , pp. 873-883
    • Rahimi, M.1    Parniani, M.2
  • 55
    • 80053055155 scopus 로고    scopus 로고
    • Fault ride-through capability enhancement for doubly fed induction wind generators
    • SEPTEMBER 5
    • M. Mohseni, M.A.S. Masoum, and S.M. Islam Fault ride-through capability enhancement for doubly fed induction wind generators IET Renew Power Gener 5 September (5) 2011 368 378
    • (2011) IET Renew Power Gener , vol.5 , pp. 368-378
    • Mohseni, M.1    Masoum, M.A.S.2    Islam, S.M.3
  • 56
    • 34548019038 scopus 로고    scopus 로고
    • Modeling of wind turbines based on doubly-fed induction generators for power system stability studies
    • AUGUST 3
    • I. Erlich, J. Kretschmann, J. Fortmann, S.M. Engelhardt, and H. Wrede Modeling of wind turbines based on doubly-fed induction generators for power system stability studies IEEE Trans Power Syst 22 August (3) 2007 909 919
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 909-919
    • Erlich, I.1    Kretschmann, J.2    Fortmann, J.3    Engelhardt, S.M.4    Wrede, H.5
  • 57
    • 44449131797 scopus 로고    scopus 로고
    • An improved control strategy of limiting the DC-link voltage fluctuation for a doubly fed induction wind generator
    • MAY 3
    • J. Yao, H. Li, Y. Liao, and Z. Chen An improved control strategy of limiting the DC-link voltage fluctuation for a doubly fed induction wind generator IEEE Trans Power Electron 23 May (3) 2008 1205 1213
    • (2008) IEEE Trans Power Electron , vol.23 , pp. 1205-1213
    • Yao, J.1    Li, H.2    Liao, Y.3    Chen, Z.4
  • 58
    • 28244465179 scopus 로고    scopus 로고
    • Wind-turbine fault ridethrough enhancement
    • NOVEMBER 4
    • A. Mullane, G. Lightbody, and R. Yacamini Wind-turbine fault ridethrough enhancement IEEE Trans Power Syst 20 November (4) 2005 1929 1937
    • (2005) IEEE Trans Power Syst , vol.20 , pp. 1929-1937
    • Mullane, A.1    Lightbody, G.2    Yacamini, R.3
  • 59
    • 34548601309 scopus 로고    scopus 로고
    • Low-voltage ride-through of a full converter wind turbine with permanent magnet generator
    • MAY 3
    • J.F. Conroy, and R. Watson Low-voltage ride-through of a full converter wind turbine with permanent magnet generator IET Renew Power Gener 1 May (3) 2007 182 189
    • (2007) IET Renew Power Gener , vol.1 , pp. 182-189
    • Conroy, J.F.1    Watson, R.2
  • 60
    • 70349509225 scopus 로고    scopus 로고
    • Fault ride through of fully rated converter wind turbines with AC and DC transmission systems
    • G. Ramtharan, A. Arulampalam, J.B. Ekanayake, F.M. Hughes, and N. Jenkins Fault ride through of fully rated converter wind turbines with AC and DC transmission systems IET Renew Power Gener 3 4 2009 426 438
    • (2009) IET Renew Power Gener , vol.3 , Issue.4 , pp. 426-438
    • Ramtharan, G.1    Arulampalam, A.2    Ekanayake, J.B.3    Hughes, F.M.4    Jenkins, N.5
  • 61
    • 80052065888 scopus 로고    scopus 로고
    • Unified power control for PMSG-based WECS operating under different grid conditions
    • SEPTEMBER 3
    • H. Geng, G. Yang, D. Xu, and B. Wu Unified power control for PMSG-based WECS operating under different grid conditions IEEE Trans Energy Convers 26 September (3) 2011 822 830
    • (2011) IEEE Trans Energy Convers , vol.26 , pp. 822-830
    • Geng, H.1    Yang, G.2    Xu, D.3    Wu, B.4
  • 62
    • 57749088354 scopus 로고    scopus 로고
    • Control algorithm for coordinated reactive power compensation in a wind park
    • DECEMBER 4
    • E.D. Dorado, C. Carrillo, and J. Cidras Control algorithm for coordinated reactive power compensation in a wind park IEEE Trans Energy Convers 23 December (4) 2008 1064 1072
    • (2008) IEEE Trans Energy Convers , vol.23 , pp. 1064-1072
    • Dorado, E.D.1    Carrillo, C.2    Cidras, J.3
  • 63
    • 70349565716 scopus 로고    scopus 로고
    • Operational experiences of STATCOMs for wind parks
    • SEPTEMBER 3
    • B. Ronner, P. Maibach, and T. Thurnherr Operational experiences of STATCOMs for wind parks IET Renew Power Gener 3 September (3) 2009 349 357
    • (2009) IET Renew Power Gener , vol.3 , pp. 349-357
    • Ronner, B.1    Maibach, P.2    Thurnherr, T.3
  • 64
    • 33947656500 scopus 로고    scopus 로고
    • Variable speed wind turbines for power system stability enhancement
    • MARCH 1
    • N.R. Ullah, and T. Thiringer Variable speed wind turbines for power system stability enhancement IEEE Trans Energy Convers 22 March (1) 2007 52 60
    • (2007) IEEE Trans Energy Convers , vol.22 , pp. 52-60
    • Ullah, N.R.1    Thiringer, T.2
  • 65
    • 68349150881 scopus 로고    scopus 로고
    • Extended reactive capability of DFIG wind parks for enhanced system performance
    • AUGUST 3
    • R.J. Konopinski, P. Vijayan, and V. Ajjarapu Extended reactive capability of DFIG wind parks for enhanced system performance IEEE Trans Power Syst 24 August (3) 2009 1346 1355
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 1346-1355
    • Konopinski, R.J.1    Vijayan, P.2    Ajjarapu, V.3
  • 67
    • 67349139918 scopus 로고    scopus 로고
    • Coordinated reactive power control of a large wind farm and a STATCOM using heuristic dynamic programming
    • JUNE 2
    • W. Qiao, R.G. Harley, and G.K. Vanayagamoorthy Coordinated reactive power control of a large wind farm and a STATCOM using heuristic dynamic programming IEEE Trans Energy Convers 24 June (2) 2009 493 503
    • (2009) IEEE Trans Energy Convers , vol.24 , pp. 493-503
    • Qiao, W.1    Harley, R.G.2    Vanayagamoorthy, G.K.3
  • 68
    • 34249792921 scopus 로고    scopus 로고
    • Reactive power control strategies for DFIG based plants
    • JUNE 2
    • M. Kayikci, and J. Milanovic Reactive power control strategies for DFIG based plants IEEE Trans Energy Convers 22 June (2) 2007 389 396
    • (2007) IEEE Trans Energy Convers , vol.22 , pp. 389-396
    • Kayikci, M.1    Milanovic, J.2
  • 69
    • 77957014951 scopus 로고    scopus 로고
    • Decoupled-DFIG fault ride-through strategy for enhanced stability performance during grid faults
    • OCTOBER 3
    • L.G. Meegahapola, T. Littler, and D. Flynn Decoupled-DFIG fault ride-through strategy for enhanced stability performance during grid faults IEEE Trans Sustain Energy 1 October (3) 2010 152 162
    • (2010) IEEE Trans Sustain Energy , vol.1 , pp. 152-162
    • Meegahapola, L.G.1    Littler, T.2    Flynn, D.3
  • 70
    • 34249798182 scopus 로고    scopus 로고
    • Proportional-integral regulator based approach to wind farm reactive power management for secondary voltage control
    • JUNE 2
    • G. Tapia, A. Tapia, and J.X. Ostolaza Proportional-integral regulator based approach to wind farm reactive power management for secondary voltage control IEEE Trans Energy Convers 22 June (2) 2007 488 498
    • (2007) IEEE Trans Energy Convers , vol.22 , pp. 488-498
    • Tapia, G.1    Tapia, A.2    Ostolaza, J.X.3
  • 71
    • 76649114328 scopus 로고    scopus 로고
    • A steady-state voltage stability analysis of power systems with high penetrations of wind
    • FEBRUARY 1
    • E. Vittal, M. O'Malley, and A. Keane A steady-state voltage stability analysis of power systems with high penetrations of wind IEEE Trans Power Syst 25 February (1) 2010 433 442
    • (2010) IEEE Trans Power Syst , vol.25 , pp. 433-442
    • Vittal, E.1    O'Malley, M.2    Keane, A.3
  • 72
    • 44449178272 scopus 로고    scopus 로고
    • A secondary voltage control strategy for transmission level interconnection of wind generation
    • MAY 3
    • M. El Moursi, G. Joos, and C. Abbey A secondary voltage control strategy for transmission level interconnection of wind generation IEEE Trans Power Electron 23 May (3) 2008 1178 1190
    • (2008) IEEE Trans Power Electron , vol.23 , pp. 1178-1190
    • El Moursi, M.1    Joos, G.2    Abbey, C.3
  • 73
    • 36348950411 scopus 로고    scopus 로고
    • Voltage and transient stability support by wind farms complying with the E.ON Netz code
    • NOVEMBER 4
    • N.R. Ullah, T. Thiringer, and D. Karlsson Voltage and transient stability support by wind farms complying with the E.ON Netz code IEEE Trans Power Syst 22 November (4) 2007 1647 1656
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 1647-1656
    • Ullah, N.R.1    Thiringer, T.2    Karlsson, D.3
  • 74
    • 78751506789 scopus 로고    scopus 로고
    • Coordinated reactive power control for facilitating fault ride through of doubly fed induction generator- and fixed speed induction generator-based wind farms
    • S. Foster, L. Xu, and B. Fox Coordinated reactive power control for facilitating fault ride through of doubly fed induction generator- and fixed speed induction generator-based wind farms IET Renew Power Gener 4 2010 128 138
    • (2010) IET Renew Power Gener , vol.4 , pp. 128-138
    • Foster, S.1    Xu, L.2    Fox, B.3
  • 76
    • 76649130518 scopus 로고    scopus 로고
    • A variable speed wind turbine control strategy to meet wind farm grid code requirements
    • FEBRUARY 1
    • S.M. Muyeen, R. Takahashi, T. Murata, and J. Tamura A variable speed wind turbine control strategy to meet wind farm grid code requirements IEEE Trans Power Syst 25 February (1) 2010 331 340
    • (2010) IEEE Trans Power Syst , vol.25 , pp. 331-340
    • Muyeen, S.M.1    Takahashi, R.2    Murata, T.3    Tamura, J.4
  • 77
    • 24944534558 scopus 로고    scopus 로고
    • The inertial response of induction-machine-based wind turbines
    • AUGUST 3
    • A. Mullane, and M. O'Malley The inertial response of induction-machine- based wind turbines IEEE Trans Power Syst 20 August (3) 2005 1496 1503
    • (2005) IEEE Trans Power Syst , vol.20 , pp. 1496-1503
    • Mullane, A.1    O'Malley, M.2
  • 78
    • 33645742609 scopus 로고    scopus 로고
    • Small-signal dynamic model and analysis of a fixed-speed wind farm - A frequency response approach
    • APRIL 2
    • A. Tabesh, and R. Iravani Small-signal dynamic model and analysis of a fixed-speed wind farm - a frequency response approach IEEE Trans Power Deliv 21 April (2) 2006 778 787
    • (2006) IEEE Trans Power Deliv , vol.21 , pp. 778-787
    • Tabesh, A.1    Iravani, R.2
  • 80
    • 10244250325 scopus 로고    scopus 로고
    • Comparison of the response of doubly fed and fixed-speed induction generator wind turbines to changes in network frequency
    • DECEMBER 4
    • J. Ekanayake, and N. Jenkins Comparison of the response of doubly fed and fixed-speed induction generator wind turbines to changes in network frequency IEEE Trans Energy Convers 19 December (4) 2004 800 802
    • (2004) IEEE Trans Energy Convers , vol.19 , pp. 800-802
    • Ekanayake, J.1    Jenkins, N.2
  • 81
    • 32144457162 scopus 로고    scopus 로고
    • Wind turbines emulating inertia and supporting primary frequency control
    • FEBRUARY 1
    • J. Morren, S.W.H. Haan, W.L. Kling, and J.A. Ferreira Wind turbines emulating inertia and supporting primary frequency control IEEE Trans Power Syst 21 February (1) 2006 433 434
    • (2006) IEEE Trans Power Syst , vol.21 , pp. 433-434
    • Morren, J.1    Haan, S.W.H.2    Kling, W.L.3    Ferreira, J.A.4
  • 82
    • 34548030937 scopus 로고    scopus 로고
    • Participation of doubly fed induction wind generators in system frequency regulation
    • AUGUST 3
    • R.G. de Almeida, and J.A.P. Lopes Participation of doubly fed induction wind generators in system frequency regulation IEEE Trans Power Syst 22 August (3) 2007 944 950
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 944-950
    • De Almeida, R.G.1    Lopes, J.A.P.2
  • 83
    • 34247185867 scopus 로고    scopus 로고
    • Frequency support from doubly fed induction generator wind turbines
    • G. Ramtharan, J.B. Ekanayake, and N. Jenkins Frequency support from doubly fed induction generator wind turbines IET Renew Power Gener 1 1 2007 3 9
    • (2007) IET Renew Power Gener , vol.1 , Issue.1 , pp. 3-9
    • Ramtharan, G.1    Ekanayake, J.B.2    Jenkins, N.3
  • 84
    • 43849103784 scopus 로고    scopus 로고
    • Temporary primary frequency control support by variable speed wind turbines - Potential and applications
    • MAY 2
    • N.R. Ullah, T. Thiringer, and D. Karlsson Temporary primary frequency control support by variable speed wind turbines - potential and applications IEEE Trans Power Syst 23 May (2) 2008 601 612
    • (2008) IEEE Trans Power Syst , vol.23 , pp. 601-612
    • Ullah, N.R.1    Thiringer, T.2    Karlsson, D.3
  • 85
    • 43849097550 scopus 로고    scopus 로고
    • Frequency response capability of full converter wind turbine generators in comparison to conventional generation
    • MAY 2
    • J.F. Conroy, and R. Watson Frequency response capability of full converter wind turbine generators in comparison to conventional generation IEEE Trans Power Syst 23 May (2) 2008 649 656
    • (2008) IEEE Trans Power Syst , vol.23 , pp. 649-656
    • Conroy, J.F.1    Watson, R.2
  • 86
    • 60349114073 scopus 로고    scopus 로고
    • Kinetic energy of wind-turbine generators for system frequency support
    • FEBRUARY 1
    • P.K. Keung, P. Li, H. Banakar, and T.O. Boon Kinetic energy of wind-turbine generators for system frequency support IEEE Trans Power Syst 24 February (1) 2009 279 287
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 279-287
    • Keung, P.K.1    Li, P.2    Banakar, H.3    Boon, T.O.4
  • 87
    • 60349105844 scopus 로고    scopus 로고
    • Frequency regulation contribution through variable-speed wind energy conversion systems
    • FEBRUARY 1
    • J.M. Mauricio, A. Marano, A. Gomez-Exposito, and J.L.M. Ramos Frequency regulation contribution through variable-speed wind energy conversion systems IEEE Trans Power Syst 24 February (1) 2009 173 180
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 173-180
    • Mauricio, J.M.1    Marano, A.2    Gomez-Exposito, A.3    Ramos, J.L.M.4
  • 88
    • 67349262621 scopus 로고    scopus 로고
    • Dynamic contribution of DFIG-based wind plants to system frequency disturbances
    • MAY 2
    • M. Kayikci, and J.V. Milanovic Dynamic contribution of DFIG-based wind plants to system frequency disturbances IEEE Trans Power Syst 24 May (2) 2009 859 867
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 859-867
    • Kayikci, M.1    Milanovic, J.V.2
  • 89
    • 68349150311 scopus 로고    scopus 로고
    • Impact of increased penetrations of DFIG based wind turbine generators on transient and small signal stability of power systems
    • AUGUST 3
    • D. Gautam, V. Vittal, L. Goel, R. Ayyanar, and T. Harbour Impact of increased penetrations of DFIG based wind turbine generators on transient and small signal stability of power systems IEEE Trans Power Syst 24 August (3) 2009 1426 1434
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 1426-1434
    • Gautam, D.1    Vittal, V.2    Goel, L.3    Ayyanar, R.4    Harbour, T.5
  • 91
    • 79955541414 scopus 로고    scopus 로고
    • Enhancing frequency response control by DFIGs in the high wind penetrated power systems
    • MAY 2
    • L.C. Chien, W.T. Lin, and Y.C. Yin Enhancing frequency response control by DFIGs in the high wind penetrated power systems IEEE Trans Power Syst 26 May (2) 2011 710 718
    • (2011) IEEE Trans Power Syst , vol.26 , pp. 710-718
    • Chien, L.C.1    Lin, W.T.2    Yin, Y.C.3
  • 92
    • 33646360809 scopus 로고    scopus 로고
    • Optimum generation control in wind parks when carrying out system operator requests
    • MAY 2
    • R.G. de Almeida, E.D. Castronuovo, and J.A.P. Lopes Optimum generation control in wind parks when carrying out system operator requests IEEE Trans Power Syst 21 May (2) 2006 718 725
    • (2006) IEEE Trans Power Syst , vol.21 , pp. 718-725
    • De Almeida, R.G.1    Castronuovo, E.D.2    Lopes, J.A.P.3
  • 93
    • 34548037932 scopus 로고    scopus 로고
    • Supervisory control of a wind farm
    • AUGUST 3
    • Z. Lubosny, and J. Bialek Supervisory control of a wind farm IEEE Trans Power Syst 22 August (3) 2007 985 994
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 985-994
    • Lubosny, Z.1    Bialek, J.2
  • 94
    • 44349088962 scopus 로고    scopus 로고
    • Influence of tower shadow and wind turbulence on the performance of power system stabilizers for DFIG-based wind farms
    • JUNE 2
    • F.M. Hughes, O. Anaya-Lara, G. Ramtharan, N. Jenkins, and G. Strbac Influence of tower shadow and wind turbulence on the performance of power system stabilizers for DFIG-based wind farms IEEE Trans Energy Convers 23 June (2) 2008 519 528
    • (2008) IEEE Trans Energy Convers , vol.23 , pp. 519-528
    • Hughes, F.M.1    Anaya-Lara, O.2    Ramtharan, G.3    Jenkins, N.4    Strbac, G.5
  • 95
    • 70049105469 scopus 로고    scopus 로고
    • Contribution of doubly fed wind generators to oscillation damping
    • SEPTEMBER 3
    • G. Tsourakis, B.M. Nomikos, and C.D. Vournas Contribution of doubly fed wind generators to oscillation damping IEEE Trans Energy Convers 24 September (3) 2009 783 791
    • (2009) IEEE Trans Energy Convers , vol.24 , pp. 783-791
    • Tsourakis, G.1    Nomikos, B.M.2    Vournas, C.D.3
  • 96
    • 70349487327 scopus 로고    scopus 로고
    • Robust tuning of power system stabilisers to install in wind energy conversion systems
    • DECEMBER 4
    • A. Mendonca, and J.A.P. Lopes Robust tuning of power system stabilisers to install in wind energy conversion systems IET Renew Power Gener 3 December (4) 2009 465 475
    • (2009) IET Renew Power Gener , vol.3 , pp. 465-475
    • Mendonca, A.1    Lopes, J.A.P.2
  • 97
    • 34547797926 scopus 로고    scopus 로고
    • Small signal stability analysis and optimal control of a wind turbine with doubly fed induction generator
    • F. Wu, X.P. Zhang, K. Godfrey, and P. Ju Small signal stability analysis and optimal control of a wind turbine with doubly fed induction generator IET Gener Transm Distrib 1 5 2007 751 760
    • (2007) IET Gener Transm Distrib , vol.1 , Issue.5 , pp. 751-760
    • Wu, F.1    Zhang, X.P.2    Godfrey, K.3    Ju, P.4
  • 98
    • 34548237470 scopus 로고    scopus 로고
    • Modal analysis of grid-connected doubly fed induction generators
    • SEPTEMBER 3
    • F. Mei, and B.C. Pal Modal analysis of grid-connected doubly fed induction generators IEEE Trans Energy Convers 22 September (3) 2007 728 736
    • (2007) IEEE Trans Energy Convers , vol.22 , pp. 728-736
    • Mei, F.1    Pal, B.C.2
  • 99
    • 79951941420 scopus 로고    scopus 로고
    • Oscillatory stability and eigenvalue sensitivity analysis of A DFIG wind turbine system small signal stability
    • MARCH 1
    • L. Yang, Z. Xu, J. Ostergaard, Z.Y. Dong, K.P. Wong, and X. Ma Oscillatory stability and eigenvalue sensitivity analysis of A DFIG wind turbine system small signal stability IEEE Trans Energy Convers 26 March (1) 2011 328 339
    • (2011) IEEE Trans Energy Convers , vol.26 , pp. 328-339
    • Yang, L.1    Xu, Z.2    Ostergaard, J.3    Dong, Z.Y.4    Wong, K.P.5    Ma, X.6
  • 100
    • 66849108936 scopus 로고    scopus 로고
    • Control of DFIG-based wind generation to improve inter-area oscillation damping
    • JUNE 2
    • Z. Miao, L. Fan, D. Osborn, and S. Yuvarajan Control of DFIG-based wind generation to improve inter-area oscillation damping IEEE Trans Energy Convers 24 June (2) 2009 415 422
    • (2009) IEEE Trans Energy Convers , vol.24 , pp. 415-422
    • Miao, Z.1    Fan, L.2    Osborn, D.3    Yuvarajan, S.4
  • 101
    • 79957489770 scopus 로고    scopus 로고
    • On active/reactive power modulation of DFIG-based wind generation for interarea oscillation damping
    • JULY 2
    • L. Fan, H. Yin, and Z. Miao On active/reactive power modulation of DFIG-based wind generation for interarea oscillation damping IEEE Trans Energy Convers 26 July (2) 2011 513 521
    • (2011) IEEE Trans Energy Convers , vol.26 , pp. 513-521
    • Fan, L.1    Yin, H.2    Miao, Z.3
  • 102
    • 78650982805 scopus 로고    scopus 로고
    • Enhanced Hysteresis-Based Current Regulators in Vector Control of DFIG Wind Turbines
    • JAN 1
    • M. Mohseni, S. Islam, and M.A.S. Masoum Enhanced Hysteresis-Based Current Regulators in Vector Control of DFIG Wind Turbines IEEE Trans Power Electron 26 Jan (1) 2011 223 234
    • (2011) IEEE Trans Power Electron , vol.26 , pp. 223-234
    • Mohseni, M.1    Islam, S.2    Masoum, M.A.S.3
  • 103
    • 79956080320 scopus 로고    scopus 로고
    • Low and High Voltage Ride-Through of DFIG Wind Turbines using Hybrid Current Controlled Converters
    • JULY 7
    • M. Mohseni, M.A.S. Masoum, and S. Islam Low and High Voltage Ride-Through of DFIG Wind Turbines using Hybrid Current Controlled Converters Electr Power Syst Res 81 July (7) 2011 1456 1465
    • (2011) Electr Power Syst Res , vol.81 , pp. 1456-1465
    • Mohseni, M.1    Masoum, M.A.S.2    Islam, S.3
  • 104
    • 84859060081 scopus 로고    scopus 로고
    • Transient Control of DFIG-Based Wind Power Plants in Compliance with the Australian Grid Code
    • JUNE 6
    • M. Mohseni, and S. Islam Transient Control of DFIG-Based Wind Power Plants in Compliance with the Australian Grid Code IEEE Trans Power Electron 27 June (6) 2012 2813 2824
    • (2012) IEEE Trans Power Electron , vol.27 , pp. 2813-2824
    • Mohseni, M.1    Islam, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.