Volumn , Issue , 2010, Pages 1152-1160

Overview of recent grid codes for wind power integration

Author keywords

[No Author keywords available]

Indexed keywords

FUTURE TRENDS; GRID CODES; POWER SYSTEM OPERATORS; RELIABILITY AND STABILITY; TRANSMISSION SYSTEM OPERATORS; WIND POWER INTEGRATIONS; WIND POWER PENETRATION;

EID: 77955720940     PISSN: 18420133     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/OPTIM.2010.5510521     Document Type: Conference Paper
Times cited : (290)

References (19)
  • 2
    • 2942516023 scopus 로고    scopus 로고
    • Modernising grid codes to accommodate diverse generation technologies, especially modern wind farms
    • A. Causebrook and B. Fox, "Modernising grid codes to accommodate diverse generation technologies, especially modern wind farms," Wind Engineering, 28, pp. 75-86, 2004.
    • (2004) Wind Engineering , vol.28 , pp. 75-86
    • Causebrook, A.1    Fox, B.2
  • 4
    • 70349579256 scopus 로고    scopus 로고
    • A review of grid code technical requirements for wind farms
    • M. Tsili and S. Papathanassiou, "A review of grid code technical requirements for wind farms," IET Renewable Power Generation, vol. 3, p. 308, 2009.
    • (2009) IET Renewable Power Generation , vol.3 , pp. 308
    • Tsili, M.1    Papathanassiou, S.2
  • 13
    • 77955724070 scopus 로고    scopus 로고
    • by National Grid Electricity Transmission plc, - NGET, June
    • The Grid Code, Issue 4, by National Grid Electricity Transmission plc, - NGET, June 2009.
    • (2009) The Grid Code , Issue.4
  • 14
    • 68649110672 scopus 로고    scopus 로고
    • Ver.3.1 3, elaborated by The EirGrid April
    • Grid Code, Ver.3.1 3, elaborated by The EirGrid April, 2008.
    • (2008) Grid Code
  • 15
    • 50249098705 scopus 로고    scopus 로고
    • issued by Federal Energy Regulatory Commission (FERC) of United States, June 2
    • Order 661 - Interconnection with Wind Energy, issued by Federal Energy Regulatory Commission (FERC) of United States, June 2, 2005.
    • (2005) Order 661 - Interconnection with Wind Energy
  • 17
    • 77955757018 scopus 로고    scopus 로고
    • report no. WED-QR-C01-E-06 - elaborated by CEPRI as part of the Sino-Danish Wind Energy Development Program (WED), July 2009
    • Revised national grid code (draft), report no. WED-QR-C01-E-06 - elaborated by CEPRI as part of the Sino-Danish Wind Energy Development Program (WED), July 2009 www.dwed.org.
    • Revised National Grid Code (Draft)