Volumn 23, Issue 2-3, 2007, Pages 157-189

System dynamics applied to project management: A survey, assessment, and directions for future research

Author keywords

[No Author keywords available]

Indexed keywords

PROJECT MANAGEMENT; SURVEY;

EID: 36349001859     PISSN: 08837066     EISSN: 10991727     Source Type: Journal    
DOI: 10.1002/sdr.377     Document Type: Review
Times cited : (297)

References (68)
  • 2
    • 0027659459 scopus 로고
    • A multiproject perspective of single-project dynamics
    • Abdel-Hamid TK. 1993a. A multiproject perspective of single-project dynamics. Journal of Systems Software 22(3): 151-165.
    • (1993) Journal of Systems Software , vol.22 , Issue.3 , pp. 151-165
    • Abdel-Hamid, T.K.1
  • 3
    • 0027556524 scopus 로고
    • Adapting, correcting, and perfecting software estimates: A maintenance metaphor
    • March
    • Abdel-Hamid TK. 1993b. Adapting, correcting, and perfecting software estimates: a maintenance metaphor. Computer March: 20-29.
    • (1993) Computer , pp. 20-29
    • Abdel-Hamid, T.K.1
  • 4
    • 0030195714 scopus 로고    scopus 로고
    • The slippery path to productivity improvement
    • July
    • Abdel-Hamid TK. 1996. The slippery path to productivity improvement. IEEE Software July: 43-52.
    • (1996) IEEE Software , pp. 43-52
    • Abdel-Hamid, T.K.1
  • 6
    • 0012541491 scopus 로고    scopus 로고
    • Modelling for litigation: Mixing qualitative and quantitative approaches
    • Ackermann F, Eden C, Williams T. 1997. Modelling for litigation: mixing qualitative and quantitative approaches. Interfaces 27(2): 48-65.
    • (1997) Interfaces , vol.27 , Issue.2 , pp. 48-65
    • Ackermann, F.1    Eden, C.2    Williams, T.3
  • 10
    • 36348969230 scopus 로고    scopus 로고
    • The application of real options to the R&D outsourcing decision
    • Schniederjans M, Schniederjans A, Schniederjans D eds, Idea Group Publishing: London
    • Cao Q, Ford D, Leggio K. 2006. The application of real options to the R&D outsourcing decision. In Outsourcing Management Information Systems, Schniederjans M, Schniederjans A, Schniederjans D (eds). Idea Group Publishing: London.
    • (2006) Outsourcing Management Information Systems
    • Cao, Q.1    Ford, D.2    Leggio, K.3
  • 11
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • Cooper KG. 1980. Naval ship production: a claim settled and a framework built. Interfaces 10(6): 20-36.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.G.1
  • 12
    • 36349018127 scopus 로고    scopus 로고
    • Cooper KG. 1993. The rework cycle (a series of 3 articles): why projects are mismanaged; how it really works... and reworks...; benchmarks for the project manager. PMAETwork February (for first two articles); Project Management Journal March (for third article).
    • Cooper KG. 1993. The rework cycle (a series of 3 articles): why projects are mismanaged; how it really works... and reworks...; benchmarks for the project manager. PMAETwork February (for first two articles); Project Management Journal March (for third article).
  • 13
    • 0001975372 scopus 로고
    • The $2,000 hour: How managers influence project performance through the rework cycle
    • Cooper KG. 1994. The $2,000 hour: how managers influence project performance through the rework cycle. Project Management journal 25(1).
    • (1994) Project Management journal , vol.25 , Issue.1
    • Cooper, K.G.1
  • 14
    • 36349025102 scopus 로고    scopus 로고
    • Project changes: Sources, impacts, mitigation, pricing, litigation, and excellence
    • Morris PWG, Pinto JK eds, Wiley: Hoboken, NJ; pp
    • Cooper KG, Reichelt KS. 2004. Project changes: sources, impacts, mitigation, pricing, litigation, and excellence. In The Wiley Guide to Managing Projects, Morris PWG, Pinto JK (eds). Wiley: Hoboken, NJ; pp. 743-772.
    • (2004) The Wiley Guide to Managing Projects , pp. 743-772
    • Cooper, K.G.1    Reichelt, K.S.2
  • 16
    • 0032094657 scopus 로고    scopus 로고
    • Dismantling the learning curve: The role of disruptions on the planning of development projects
    • Eden CE, Williams TM, Ackermann FA. 1998. Dismantling the learning curve: the role of disruptions on the planning of development projects. International Journal of Project Management 16(3): 131-138.
    • (1998) International Journal of Project Management , vol.16 , Issue.3 , pp. 131-138
    • Eden, C.E.1    Williams, T.M.2    Ackermann, F.A.3
  • 19
    • 3943069302 scopus 로고    scopus 로고
    • Achieving multiple project objectives through contingency management
    • Ford DN. 2002. Achieving multiple project objectives through contingency management. ASCE Journal of Construction Engineering and Management 128(1): 30-39.
    • (2002) ASCE Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 30-39
    • Ford, D.N.1
  • 21
    • 17144364045 scopus 로고    scopus 로고
    • Using options to manage dynamic uncertainty in acquisition projects
    • Ford DN, Ceylan K. 2002. Using options to manage dynamic uncertainty in acquisition projects. Acquisition Review Quarterly 9(4): 243-258.
    • (2002) Acquisition Review Quarterly , vol.9 , Issue.4 , pp. 243-258
    • Ford, D.N.1    Ceylan, K.2
  • 23
    • 33745099519 scopus 로고    scopus 로고
    • Modeling real options to switch among alternatives in product development
    • Ford DN, Sobek D. 2005. Modeling real options to switch among alternatives in product development. IEEE Transactions on Engineering Management 52(2): 1-11.
    • (2005) IEEE Transactions on Engineering Management , vol.52 , Issue.2 , pp. 1-11
    • Ford, D.N.1    Sobek, D.2
  • 24
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic modeling of product development processes
    • Ford DN, Sterman JD. 1998a. Dynamic modeling of product development processes. System Dynamics Review 14(1): 31-68.
    • (1998) System Dynamics Review , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.N.1    Sterman, J.D.2
  • 25
    • 0000505381 scopus 로고    scopus 로고
    • Expert knowledge elicitation for improving mental and formal models
    • Ford DN, Sterman JD. 1998b. Expert knowledge elicitation for improving mental and formal models. System Dynamics Review 14(4): 309-340.
    • (1998) System Dynamics Review , vol.14 , Issue.4 , pp. 309-340
    • Ford, D.N.1    Sterman, J.D.2
  • 26
    • 0242269387 scopus 로고    scopus 로고
    • The liar's club: Impacts of concealment in concurrent development projects
    • Ford DN, Sterman JD. 2003b. The liar's club: impacts of concealment in concurrent development projects. Concurrent Engineering Research and Applications 111(3): 211-219.
    • (2003) Concurrent Engineering Research and Applications , vol.111 , Issue.3 , pp. 211-219
    • Ford, D.N.1    Sterman, J.D.2
  • 29
    • 0012349684 scopus 로고    scopus 로고
    • Beyond PM101: Lessons for managing large development programs
    • Graham AK. 2000. Beyond PM101: lessons for managing large development programs. Project Management Journal 31(4): 7-18.
    • (2000) Project Management Journal , vol.31 , Issue.4 , pp. 7-18
    • Graham, A.K.1
  • 31
    • 0012303578 scopus 로고    scopus 로고
    • How robust are conclusions from a complex calibrated model, really? A project management model benchmark using fit constrained Monte Carlo analysis
    • Palermo, Italy
    • Graham AK, Moore J, Choi CY. 2002b. How robust are conclusions from a complex calibrated model, really? A project management model benchmark using fit constrained Monte Carlo analysis. In Proceedings of the 2002 International System Dynamics Conference, Palermo, Italy.
    • (2002) Proceedings of the 2002 International System Dynamics Conference
    • Graham, A.K.1    Moore, J.2    Choi, C.Y.3
  • 33
    • 0034830442 scopus 로고    scopus 로고
    • The impact of disruption and delay when compressing large projects: Going for incentives?
    • Howick S, Eden C. 2001. The impact of disruption and delay when compressing large projects: going for incentives? Journal of the Operational Research Society 52: 26-34.
    • (2001) Journal of the Operational Research Society , vol.52 , pp. 26-34
    • Howick, S.1    Eden, C.2
  • 36
    • 39349103031 scopus 로고    scopus 로고
    • Resource allocation policy design for reduced project duration: A systems modeling approach
    • Lee Z, Ford DN, Joglekar N. 2007. Resource allocation policy design for reduced project duration: a systems modeling approach. Systems Research and Behavioral Science 24: 1-15.
    • (2007) Systems Research and Behavioral Science , vol.24 , pp. 1-15
    • Lee, Z.1    Ford, D.N.2    Joglekar, N.3
  • 37
    • 0033358240 scopus 로고    scopus 로고
    • Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design
    • Levitt RE, Thomsen J, Christiansen TR, Kunz JC, Jin Y, Nass C. 1999. Simulating project work processes and organizations: toward a micro-contingency theory of organizational design. Management Science 45(11): 1479-1495.
    • (1999) Management Science , vol.45 , Issue.11 , pp. 1479-1495
    • Levitt, R.E.1    Thomsen, J.2    Christiansen, T.R.3    Kunz, J.C.4    Jin, Y.5    Nass, C.6
  • 39
    • 0001446357 scopus 로고    scopus 로고
    • Strategic management of complex projects: A case study using system dynamics
    • Lyneis JM, Cooper KG, Els SA. 2001. Strategic management of complex projects: a case study using system dynamics. System Dynamics Review 17: 237-260.
    • (2001) System Dynamics Review , vol.17 , pp. 237-260
    • Lyneis, J.M.1    Cooper, K.G.2    Els, S.A.3
  • 44
    • 0142025004 scopus 로고    scopus 로고
    • Dynamic change management for construction: Introducing the change cycle into model-based project management
    • Park M, Pena-Mora F. 2003. Dynamic change management for construction: introducing the change cycle into model-based project management. System Dynamics Review 19(3): 213-242.
    • (2003) System Dynamics Review , vol.19 , Issue.3 , pp. 213-242
    • Park, M.1    Pena-Mora, F.2
  • 46
    • 0032686425 scopus 로고    scopus 로고
    • Pfahl D, Lebsanft K. 1999. Integration of system dynamics modelling with descriptive process modelling and goal-oriented measurement. Journal of Systems and Software 46(2-3):135-150.15 April 1999.
    • Pfahl D, Lebsanft K. 1999. Integration of system dynamics modelling with descriptive process modelling and goal-oriented measurement. Journal of Systems and Software 46(2-3):135-150.15 April 1999.
  • 49
    • 0033114449 scopus 로고    scopus 로고
    • The dynamics of project performance: Benchmarking the drivers of cost and schedule overrun
    • Reichelt KS, Lyneis JM. 1999. The dynamics of project performance: benchmarking the drivers of cost and schedule overrun. European Management Journal 17(2):135-150.
    • (1999) European Management Journal , vol.17 , Issue.2 , pp. 135-150
    • Reichelt, K.S.1    Lyneis, J.M.2
  • 50
    • 0041010783 scopus 로고    scopus 로고
    • A dynamic model of resource allocation in multi-project research and development systems
    • Repenning NP. 2000. A dynamic model of resource allocation in multi-project research and development systems. System Dynamics Review 16(3): 173-212.
    • (2000) System Dynamics Review , vol.16 , Issue.3 , pp. 173-212
    • Repenning, N.P.1
  • 51
    • 0035623034 scopus 로고    scopus 로고
    • Nobody ever gets credit for fixing problems that never happened: Creating and sustaining process improvement
    • Repenning NP, Sterman JD. 2001. Nobody ever gets credit for fixing problems that never happened: creating and sustaining process improvement. California Management Review 43(4): 64-88.
    • (2001) California Management Review , vol.43 , Issue.4 , pp. 64-88
    • Repenning, N.P.1    Sterman, J.D.2
  • 52
    • 0036625108 scopus 로고    scopus 로고
    • Capability traps and self-confirming attribution errors in the dynamics of process improvement
    • Repenning NP, Sterman JD. 2002. Capability traps and self-confirming attribution errors in the dynamics of process improvement. Administrative Science Quarterly 47: 265-295.
    • (2002) Administrative Science Quarterly , vol.47 , pp. 265-295
    • Repenning, N.P.1    Sterman, J.D.2
  • 55
    • 84981568557 scopus 로고    scopus 로고
    • Roberts EB. 1974. A simple model of R&D project dynamics. R&D Management 5(1). Reprinted in Roberts EB (ed.). 1978. Managerial Applications of System Dynamics. Productivity Press: Cambridge, MA.
    • Roberts EB. 1974. A simple model of R&D project dynamics. R&D Management 5(1). Reprinted in Roberts EB (ed.). 1978. Managerial Applications of System Dynamics. Productivity Press: Cambridge, MA.
  • 57
    • 84909590214 scopus 로고    scopus 로고
    • Managing and modelling project risk dynamics: A system dynamics-based framework
    • Presented at the, 6-7 June, London
    • Rodrigues AG. 2001. Managing and modelling project risk dynamics: a system dynamics-based framework. Presented at the Fourth European Project Management Conference: PMI Europe 2001, 6-7 June, London.
    • (2001) Fourth European Project Management Conference: PMI Europe 2001
    • Rodrigues, A.G.1
  • 58
    • 0000228602 scopus 로고    scopus 로고
    • System dynamics in project management: A comparative analysis with traditional methods
    • Rodrigues AG, Bowers J. 1996. System dynamics in project management: a comparative analysis with traditional methods. System Dynamics Review 12(2): 121-139.
    • (1996) System Dynamics Review , vol.12 , Issue.2 , pp. 121-139
    • Rodrigues, A.G.1    Bowers, J.2
  • 59
    • 0031672864 scopus 로고    scopus 로고
    • System dynamics in project management: Assessing the impacts of client behavior on project performance
    • Rodrigues AG, Williams TM. 1998. System dynamics in project management: assessing the impacts of client behavior on project performance. Journal of the Operational Research Society 49(1): 2-15.
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.1 , pp. 2-15
    • Rodrigues, A.G.1    Williams, T.M.2
  • 60
    • 0027580495 scopus 로고
    • Alternative conceptions of feedback in dynamic decision environments: An experimental investigation
    • Sengupta K, Abdel-Hamid TK. 1993. Alternative conceptions of feedback in dynamic decision environments: an experimental investigation. Management Science 39(4): 411-428.
    • (1993) Management Science , vol.39 , Issue.4 , pp. 411-428
    • Sengupta, K.1    Abdel-Hamid, T.K.2
  • 61
    • 0030110520 scopus 로고    scopus 로고
    • The impact of unreliable information on the management of software projects: A dynamic decision perspective
    • Sengupta K, Abdel-Hamid TK. 1996. The impact of unreliable information on the management of software projects: a dynamic decision perspective. IEEE Transactions on Systems, Man, and Cybernetics 26(2): 177-189.
    • (1996) IEEE Transactions on Systems, Man, and Cybernetics , vol.26 , Issue.2 , pp. 177-189
    • Sengupta, K.1    Abdel-Hamid, T.K.2
  • 62
    • 0002700386 scopus 로고
    • Death of a software manager: How to avoid career suicide through dynamic software process modeling
    • Smith BJ, Nguyen N, Vidale RF. 1993. Death of a software manager: how to avoid career suicide through dynamic software process modeling. American Programmer 6(5): 10-17.
    • (1993) American Programmer , vol.6 , Issue.5 , pp. 10-17
    • Smith, B.J.1    Nguyen, N.2    Vidale, R.F.3
  • 63
    • 23644436508 scopus 로고    scopus 로고
    • System dynamics modeling in the legal arena: Meeting the challenges of expert witness admissibility
    • Stephens CA, Graham AK, Lyneis JM. 2005. System dynamics modeling in the legal arena: meeting the challenges of expert witness admissibility. System Dynamics Review 21(2): 95-122.
    • (2005) System Dynamics Review , vol.21 , Issue.2 , pp. 95-122
    • Stephens, C.A.1    Graham, A.K.2    Lyneis, J.M.3
  • 65
    • 33646499160 scopus 로고    scopus 로고
    • Tipping point dynamics in development projects
    • Taylor T, Ford DN. 2006. Tipping point dynamics in development projects. System Dynamics Review 22(1): 51-71.
    • (2006) System Dynamics Review , vol.22 , Issue.1 , pp. 51-71
    • Taylor, T.1    Ford, D.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.