메뉴 건너뛰기




Volumn 131, Issue 5, 2005, Pages 513-521

Keeping better site records using intelligent bar charts

Author keywords

Construction industry; Documentation; Graphic methods; Information management; Project management

Indexed keywords

CIVIL ENGINEERING; CONSTRUCTION INDUSTRY; CONTRACTS; DATA REDUCTION; GRAPHIC METHODS; INFORMATION MANAGEMENT; PROJECT MANAGEMENT;

EID: 18744383981     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:5(513)     Document Type: Article
Times cited : (19)

References (10)
  • 1
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • Hegazy, T., and Petzold, K. (2002). "Genetic optimization for dynamic project control." J. Constr. Eng. Manage., 129(4), 396-404.
    • (2002) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 2
    • 0011100692 scopus 로고
    • Construction documentation in arbitration
    • Kangari, R. (1995). "Construction documentation in arbitration." J. Constr. Eng. Manage., 121(2), 201-208.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.2 , pp. 201-208
    • Kangari, R.1
  • 3
    • 0009359692 scopus 로고
    • R. S. Means Company, Inc., Kingston, Mass.
    • Means forms for contractors (1990). R. S. Means Company, Inc., Kingston, Mass.
    • (1990) Means Forms for Contractors
  • 4
    • 0026819123 scopus 로고
    • The daily report as a job management tool
    • Pogorilich, D. A. (1992). "The daily report as a job management tool." Cost Eng., 34(2), 23-25.
    • (1992) Cost Eng. , vol.34 , Issue.2 , pp. 23-25
    • Pogorilich, D.A.1
  • 5
    • 18744384773 scopus 로고
    • Job site project control using microcomputers
    • ASCE, Alexandria, Va.
    • Riggs, L. S. (1988). "Job site project control using microcomputers." Proc., 5th Conf. on Computers in Civil Engineering, ASCE, Alexandria, Va., 450-460.
    • (1988) Proc., 5th Conf. on Computers in Civil Engineering , pp. 450-460
    • Riggs, L.S.1
  • 6
    • 0027608442 scopus 로고
    • Computerized daily site reporting
    • Russell, A. D. (1993). "Computerized daily site reporting." J. Constr. Eng. Manage., 119(2), 385-402.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.2 , pp. 385-402
    • Russell, A.D.1
  • 8
    • 0026173799 scopus 로고
    • Site analysis using controller-function charts
    • Sanvido, V. E., and Paulson, B. C. (1991). "Site analysis using controller-function charts." J. Constr. Eng. Manage., 117(2), 226-241.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.2 , pp. 226-241
    • Sanvido, V.E.1    Paulson, B.C.2
  • 9
    • 38249017792 scopus 로고
    • Keeping better site records
    • Scott, S. (1990). "Keeping better site records." Int. J. Proj. Manage., 8(4), 243-249.
    • (1990) Int. J. Proj. Manage. , vol.8 , Issue.4 , pp. 243-249
    • Scott, S.1
  • 10
    • 0034225662 scopus 로고    scopus 로고
    • Schedule delay analysis
    • Stumpf, G. R. (2000). "Schedule delay analysis." Cost Eng., 42(7), 32-43.
    • (2000) Cost Eng. , vol.42 , Issue.7 , pp. 32-43
    • Stumpf, G.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.