Volumn 20, Issue 7, 2011, Pages 755-766

Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio

Author keywords

Cash flow; Financial management; Multiobjective; Optimization; Project financing; Scheduling

Indexed keywords

CASH FLOW; CROSSOVER AND MUTATION; DECISION MAKERS; DIFFERENT SIZES; FINANCIAL MANAGEMENTS; MULTI OBJECTIVE; MULTIPLE PROJECTS; PARETO OPTIMAL SOLUTIONS; PARETO-OPTIMAL; PROJECT FINANCING; SCHEDULING PROBLEM; STRENGTH PARETO EVOLUTIONARY ALGORITHM;

EID: 80052832799     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2011.03.010     Document Type: Review
Times cited : (33)

References (32)
  • 1
    • 0001195356 scopus 로고
    • Resource leveling in construction by optimization
    • M. Easa Resource leveling in construction by optimization Journal of Construction Engineering Management 115 2 1989 302 316
    • (1989) Journal of Construction Engineering Management , vol.115 , Issue.2 , pp. 302-316
    • Easa, M.1
  • 2
    • 12444344998 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities
    • K. El-Rayes, and O. Moselhi Resource-driven scheduling of repetitive activities Construction Management and Economics 16 4 1998 433 446 (Pubitemid 128650981)
    • (1998) Construction Management and Economics , vol.16 , Issue.4 , pp. 433-446
    • El-Rayes, K.1    Moselhi, O.2
  • 3
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • T. Hegazy Optimization of resource allocation and leveling using genetic algorithms Journal of Construction Engineering Management 125 3 1999 167 175
    • (1999) Journal of Construction Engineering Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 5
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
    • S.-S. Leu, and C.-H. Yang GA-based multicriteria optimal model for construction scheduling Journal of Construction Engineering Management 125 6 1999 420 427 (Pubitemid 30509596)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 6
    • 0035138778 scopus 로고    scopus 로고
    • Resource scheduling using neural dynamics model of Adeli and Park
    • DOI 10.1061/(ASCE)0733-9364(2001)127:1(28)
    • A. Senouci, and H. Adeli Resource scheduling using neural dynamics model of Adeli and Park Journal of Construction Engineering Management 127 1 2001 28 34 (Pubitemid 32158956)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 28-34
    • Senouci, A.B.1    Adeli, H.2
  • 7
    • 0035612930 scopus 로고    scopus 로고
    • Project Scheduling with Multiple Modes: A Genetic Algorithm
    • DOI 10.1023/A:1010902015091
    • S. Hartmann Project scheduling with multiple modes: a genetic algorithm Annals of Operations Research 112 2001 111 135 (Pubitemid 33634389)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 111-135
    • Hartmann, S.1
  • 8
    • 0036603972 scopus 로고    scopus 로고
    • Resource constrained project scheduling using simulation
    • DOI 10.1080/01446190210131098
    • M. Ammar, and Y. Mohieldin Resource constrained project scheduling using simulation Construction Management and Economics 20 4 2002 323 330 (Pubitemid 34527772)
    • (2002) Construction Management and Economics , vol.20 , Issue.4 , pp. 323-330
    • Ammar, M.A.1    Mohieldin, Y.A.2
  • 9
    • 0036499562 scopus 로고    scopus 로고
    • A genetic algorithm-based optimal resource-constrained scheduling simulation model
    • DOI 10.1080/01446190110109148
    • S. Leu, and T. Hung A genetic algorithm based optimal resource constrained scheduling simulation model Construction Management and Economics 20 2 2002 131 141 (Pubitemid 34197193)
    • (2002) Construction Management and Economics , vol.20 , Issue.2 , pp. 131-141
    • Leu, S.-S.1    Hung, T.-H.2
  • 10
    • 0036466973 scopus 로고    scopus 로고
    • A simulation model for multi-project resource allocation
    • DOI 10.1016/S0263-7863(00)00038-7, PII S0263786300000387
    • S. Ghomi, and B. Ashjari A simulation model for multi project resource allocation International Journal of Project Management 20 2 2002 127 130 (Pubitemid 34039513)
    • (2002) International Journal of Project Management , vol.20 , Issue.2 , pp. 127-130
    • Fatemi Ghomi, S.M.T.1    Ashjari, B.2
  • 11
    • 0036142437 scopus 로고    scopus 로고
    • An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows
    • DOI 10.1080/01446190110089718
    • H. Chiu, and D. Tsai An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows Construction Management and Economics 20 1 2002 55 66 (Pubitemid 34057506)
    • (2002) Construction Management and Economics , vol.20 , Issue.1 , pp. 55-66
    • Chiu H.N. Tsai, D.M.1
  • 12
    • 27644433999 scopus 로고    scopus 로고
    • A linear-discrete scheduling model for the resource-constrained project scheduling problem
    • DOI 10.1080/01446190500040869
    • P. Bonnal, D. Gourc, A. Hameri, and G. Lacoste A linear-discrete scheduling model for the resource-constrained project scheduling problem Construction Management and Economics 23 8 2005 797 814 (Pubitemid 41569086)
    • (2005) Construction Management and Economics , vol.23 , Issue.8 , pp. 797-814
    • Bonnal, P.1    Gourc, D.2    Hameri, A.-P.3    Lacoste, G.4
  • 13
    • 32844466990 scopus 로고    scopus 로고
    • Construction scheduling using multi-constraint and genetic algorithms approach
    • DOI 10.1080/01446190500310486, PII W6602185465383
    • N. Dawood, and E. Sriprasert Construction scheduling using multi-constraint and genetic algorithms approach Construction Management and Economics 24 1 2006 19 30 (Pubitemid 43250410)
    • (2006) Construction Management and Economics , vol.24 , Issue.1 , pp. 19-30
    • Dawood, N.1    Sriprasert, E.2
  • 14
    • 13944269539 scopus 로고    scopus 로고
    • Finance-based scheduling of construction projects using integer programming
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(15)
    • A. Elazouni, and A. Gab-Allah Finance-based scheduling of construction projects using integer programming Journal of Construction Engineering Management 130 1 2004 15 24 (Pubitemid 40265401)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 15-24
    • Elazouni, A.M.1    Gab-Allah, A.A.2
  • 15
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(400)
    • A. Elazouni, and F. Metwally Finance-based scheduling: tool to maximize project profit using improved genetic algorithms Journal of Construction Engineering Management 131 4 2005 400 412 (Pubitemid 40430136)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 400-412
    • Elazouni, A.M.1    Metwally, F.G.2
  • 16
    • 45849109552 scopus 로고    scopus 로고
    • Resource-constrained construction project scheduling model for profit maximization considering cash flow
    • S.-S. Liu, and C.-J. Wang Resource-constrained construction project scheduling model for profit maximization considering cash flow Automation in Construction 17 2008 966 974
    • (2008) Automation in Construction , vol.17 , pp. 966-974
    • Liu, S.-S.1    Wang, C.-J.2
  • 17
    • 33845769935 scopus 로고    scopus 로고
    • Expanding finance-based scheduling to devise overall-optimized project schedules
    • DOI 10.1061/(ASCE)0733-9364(2007)133:1(86)
    • A. Elazouni, and F. Metwally Expanding finance-based scheduling to devise overall-optimized project schedules Journal of Construction Engineering Management 133 1 2007 86 90 (Pubitemid 44975053)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.1 , pp. 86-90
    • Elazouni, A.M.1    Metwally, F.G.2
  • 18
    • 67650294079 scopus 로고    scopus 로고
    • Heuristic method for multi-project finance-based scheduling
    • A. Elazouni Heuristic method for multi-project finance-based scheduling Construction Management and Economics 27 2 2009 199 211
    • (2009) Construction Management and Economics , vol.27 , Issue.2 , pp. 199-211
    • Elazouni, A.1
  • 19
    • 70350637537 scopus 로고    scopus 로고
    • Finance-based CPM/LOB scheduling of projects with repetitive nonserial activities
    • M. Ali, and A. Elazouni Finance-based CPM/LOB scheduling of projects with repetitive nonserial activities Construction Management and Economics 27 9 2009 839 856
    • (2009) Construction Management and Economics , vol.27 , Issue.9 , pp. 839-856
    • Ali, M.1    Elazouni, A.2
  • 20
    • 72949124700 scopus 로고    scopus 로고
    • Finance-based scheduling of multiple construction projects using multiobjective evolutionary algorithms
    • Canadian Society of Civil Engineers St. John's, Canada
    • A. Elazouni, and M. Abido Finance-based scheduling of multiple construction projects using multiobjective evolutionary algorithms Proceedings of the 2nd International Construction Specialty Conference 2009 Canadian Society of Civil Engineers St. John's, Canada
    • (2009) Proceedings of the 2nd International Construction Specialty Conference
    • Elazouni, A.1    Abido, M.2
  • 21
    • 70449581162 scopus 로고    scopus 로고
    • Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost
    • A. Afshar, and H. Fathi Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost Engineering Optimization 41 11 2009 1063 1080
    • (2009) Engineering Optimization , vol.41 , Issue.11 , pp. 1063-1080
    • Afshar, A.1    Fathi, H.2
  • 22
    • 33744773216 scopus 로고    scopus 로고
    • Multiobjective evolutionary algorithms for electric power dispatch problem
    • DOI 10.1109/TEVC.2005.857073
    • M.A. Abido Multiobjective evolutionary algorithms for electric power dispatch problem IEEE Transactions on Evolutionary Computations 10 3 2006 315 329 (Pubitemid 43821761)
    • (2006) IEEE Transactions on Evolutionary Computation , vol.10 , Issue.3 , pp. 315-329
    • Abido, M.A.1
  • 23
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • DOI 10.1109/4235.996017, PII S1089778X02041012
    • K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast and elitist multiobjective genetic algorithm: NSGA-II IEEE Transactions on Evolutionary Computation 6 2 2002 182 197 (Pubitemid 34555372)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 24
    • 85133775397 scopus 로고    scopus 로고
    • A comprehensive survey of evolutionary-based multiobjective optimization techniques
    • C. Coello A comprehensive survey of evolutionary-based multiobjective optimization techniques Knowledge and Information Systems 1 3 1999 269 308
    • (1999) Knowledge and Information Systems , vol.1 , Issue.3 , pp. 269-308
    • Coello, C.1
  • 25
    • 0028592878 scopus 로고
    • Multiobjective optimization of construction schedules
    • T. Kasprowicz Multiobjective optimization of construction schedules Computing in Civil Engineering New York 1 1 1994 185 190
    • (1994) Computing in Civil Engineering New York , vol.1 , Issue.1 , pp. 185-190
    • Kasprowicz, T.1
  • 26
    • 12344265028 scopus 로고    scopus 로고
    • Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
    • D. Zheng, S. Ng, and M. Kumaraswamy Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization Journal of Construction Engineering Management 131 1 2005 81 91 (Pubitemid 40135235)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 27
    • 33646171275 scopus 로고    scopus 로고
    • Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
    • A. Kandil, and K. El-Rayes Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects Journal of Construction Engineering Management 132 5 2006 491 498
    • (2006) Journal of Construction Engineering Management , vol.132 , Issue.5 , pp. 491-498
    • Kandil, A.1    El-Rayes, K.2
  • 28
    • 33646584142 scopus 로고    scopus 로고
    • Optimal planning and scheduling for repetitive construction projects
    • K. Hyari, and K. El-Rayes Optimal planning and scheduling for repetitive construction projects Journal of Management in Engineering 22 1 2006 11 19
    • (2006) Journal of Management in Engineering , vol.22 , Issue.1 , pp. 11-19
    • Hyari, K.1    El-Rayes, K.2
  • 29
    • 78650373584 scopus 로고    scopus 로고
    • Multiobjective Evolutionary Finance-based Scheduling: The Entire Projects' Portfolio
    • M.A. Abido, and A. Elazouni Multiobjective Evolutionary Finance-based Scheduling: the Entire Projects' Portfolio Journal of Computing in Civil Engineering 25 1 2011 85 97
    • (2011) Journal of Computing in Civil Engineering , vol.25 , Issue.1 , pp. 85-97
    • Abido, M.A.1    Elazouni, A.2
  • 30
    • 77953575551 scopus 로고    scopus 로고
    • Precedence-preserving GAs operators for scheduling problems with activities' start times encoding
    • M.A. Abido, and A. Elazouni Precedence-preserving GAs operators for scheduling problems with activities' start times encoding Journal of Computing in Civil Engineering 24 4 2009 345 356
    • (2009) Journal of Computing in Civil Engineering , vol.24 , Issue.4 , pp. 345-356
    • Abido, M.A.1    Elazouni, A.2
  • 31
    • 0008622621 scopus 로고    scopus 로고
    • An evolutionary algorithm for multiobjective optimization: The strength Pareto approach
    • Swiss Federal Institute of Technology
    • E. Zitzler, and L. Thiele An evolutionary algorithm for multiobjective optimization: the strength Pareto approach TIK-Report, No. 43 1998 Swiss Federal Institute of Technology
    • (1998) TIK-Report, No. 43
    • Zitzler, E.1    Thiele, L.2
  • 32
    • 0001494926 scopus 로고    scopus 로고
    • A genetic-algorithm-based resource-constrained construction scheduling system
    • S.-S. Leu, and C.-H. Yang A genetic-algorithm-based resource-constrained construction scheduling system Construction Management and Economics 17 1999 767 776 (Pubitemid 129707645)
    • (1999) Construction Management and Economics , vol.17 , Issue.6 , pp. 767-776
    • Leu, S.-S.1    Yang, C.-H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.