-
1
-
-
33744773216
-
Multiobjective evolutionary algorithms for electric power dispatch problem
-
DOI 10.1109/TEVC.2005.857073
-
Abido, M. A. (2006). " Multiobjective evolutionary algorithms for electric power dispatch problems.." IEEE Trans. Evol. Comput. ITEVF5 1089-778X, 10 (3), 315-329. 10.1109/TEVC.2005.857073 (Pubitemid 43821761)
-
(2006)
IEEE Transactions on Evolutionary Computation
, vol.10
, Issue.3
, pp. 315-329
-
-
Abido, M.A.1
-
2
-
-
0022731071
-
Profit measures for construction projects
-
JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1986)112:2(273)
-
Au, T., and Hendrikson, C. (1986). " Profit measures for construction projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 112 (2), 273-286. 10.1061/(ASCE)0733-9364(1986)112:2(273)
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.2
, pp. 273-286
-
-
Au, T.1
Hendrikson, C.2
-
3
-
-
2042428623
-
Genetics and random keys for sequencing and optimization
-
Univ. of Michigan, Ann Arbor, Mich.
-
Bean, J. C. (1992). " Genetics and random keys for sequencing and optimization.." Tech. Rep. No. 92-43, Univ. of Michigan, Ann Arbor, Mich.
-
(1992)
Tech. Rep No. 92-43
-
-
Bean, J.C.1
-
4
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1996)122:2(125)
-
Chan, W. -T., Chua, D. K., and Kannan, G. (1996). " Construction resource scheduling with genetic algorithms.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 122 (2), 125-132. 10.1061/(ASCE)0733-9364(1996)122:2(125)
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.-T.1
Chua, D.K.2
Kannan, G.3
-
5
-
-
32844466990
-
Construction scheduling using multi-constraint and genetic algorithms approach
-
DOI 10.1080/01446190500310486, PII W6602185465383
-
Dawood, N., and Sriprasert, E. (2006). " Construction scheduling using multi-constraint and genetic algorithms approach.." Constr. Manage. Econom. CMECF3 0144-6193, 24 (1), 19-30. 10.1080/01446190500310486 (Pubitemid 43250410)
-
(2006)
Construction Management and Economics
, vol.24
, Issue.1
, pp. 19-30
-
-
Dawood, N.1
Sriprasert, E.2
-
6
-
-
29144449379
-
Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
-
DOI 10.1016/j.autcon.2005.04.001, PII S0926580505000609
-
Feng, C. -W., and Wu, H. -T. (2006). " Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks.." Autom. Construct., 15, 186-199. 10.1016/j.autcon.2005.04.001 0926-5805 (Pubitemid 41817147)
-
(2006)
Automation in Construction
, vol.15
, Issue.2
, pp. 186-199
-
-
Feng, C.-W.1
Wu, H.-T.2
-
7
-
-
0001907722
-
Rapid, accurate optimization of difficult problems using fast messy genetic algorithms
-
", Morgan Kaufmann, San Mateo, Calif..
-
Goldberg, D. E., Deb, K., Kaegupta, H., and Harik, G. (1993). " Rapid, accurate optimization of difficult problems using fast messy genetic algorithms.." Proc., 5th Int. Conf. on Genetic Algorithms, Morgan Kaufmann, San Mateo, Calif., 56-64.
-
(1993)
Proc., 5th Int. Conf. on Genetic Algorithms
, pp. 56-64
-
-
Goldberg, D.E.1
Deb, K.2
Kaegupta, H.3
Harik, G.4
-
8
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
10.1023/A:1010902015091 0254-5330
-
Hartmann, S. (2001). " Project scheduling with multiple modes: A genetic algorithm.." Ann. Oper. Res., 102, 111-135. 10.1023/A:1010902015091 0254-5330
-
(2001)
Ann. Oper. Res.
, vol.102
, pp. 111-135
-
-
Hartmann, S.1
-
9
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
10
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
-
Leu, S. -S., and Yang, C. -H. (1999a). " GA-based multicriteria model for construction scheduling.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (6), 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420) (Pubitemid 30509596)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
11
-
-
0001494926
-
A genetic-algorithm-based resource-constrained construction scheduling system
-
CMECF3 0144-6193,. 10.1080/014461999371105
-
Leu, S. -S., and Yang, C. -H. (1999b). " A genetic-algorithm-based resource-constrained construction scheduling system.." Constr. Manage. Econom. CMECF3 0144-6193, 17, 767-776. 10.1080/014461999371105
-
(1999)
Constr. Manage. Econom.
, vol.17
, pp. 767-776
-
-
Leu, S.-S.1
Yang, C.-H.2
-
12
-
-
33845784358
-
A genetic algorithm for resource investment problem with discounted cash flows
-
DOI 10.1016/j.amc.2006.05.118, PII S0096300306006412
-
Najafi, A. A., and Niaki, S. T. (2006). " A genetic algorithm for resource investment problem with discounted cash flows.." Appl. Math. Comput. AMHCBQ 0096-3003, 183, 1057-1070. 10.1016/j.amc.2006.05.118 (Pubitemid 46014655)
-
(2006)
Applied Mathematics and Computation
, vol.183
, Issue.2
, pp. 1057-1070
-
-
Najafi, A.A.1
Niaki, S.T.A.2
-
13
-
-
0028368259
-
Genetic algorithms crossover operators for ordering applications
-
CMORAP 0305-0548, (),. 10.1016/0305-0548(93)E0024-N
-
Poon, P. W., and Carter, J. N. (1995). " Genetic algorithms crossover operators for ordering applications.." Comput. Oper. Res. CMORAP 0305-0548, 22 (1), 135-147. 10.1016/0305-0548(93)E0024-N
-
(1995)
Comput. Oper. Res.
, vol.22
, Issue.1
, pp. 135-147
-
-
Poon, P.W.1
Carter, J.N.2
-
14
-
-
5244287531
-
Optimum resource allocation in construction projects using genetic algorithms
-
Edinburgh, U.K.
-
Satyanarayana, K., Rajeev, S., Kalidindi, S., and Kalyanaraman, V. (1993). " Optimum resource allocation in construction projects using genetic algorithms.." Proc., 3rd Int. Conf. on the Application of AI to Civil and Structural Engineering, Edinburgh, U.K., 17-19.
-
(1993)
Proc., 3rd Int. Conf. on the Application of AI to Civil and Structural Engineering
, pp. 17-19
-
-
Satyanarayana, K.1
Rajeev, S.2
Kalidindi, S.3
Kalyanaraman, V.4
-
15
-
-
33847297058
-
A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
-
EJORDT 0377-2217,. 10.1016/j.ejor.2006.03.056
-
Shadrokh, S., and Kianfar, F. (2007). " A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty.." Eur. J. Oper. Res. EJORDT 0377-2217, 181, 86-101. 10.1016/j.ejor.2006.03.056
-
(2007)
Eur. J. Oper. Res.
, vol.181
, pp. 86-101
-
-
Shadrokh, S.1
Kianfar, F.2
-
16
-
-
0002755938
-
Schedule optimization using genetic algorithms
-
L. Davis, ed., Van Nostrand Reinhold, New York.
-
Syswerda, G. (1991). " Schedule optimization using genetic algorithms.." Handbook of genetic algorithms, L. Davis, ed., Van Nostrand Reinhold, New York.
-
(1991)
Handbook of Genetic Algorithms
-
-
Syswerda, G.1
-
17
-
-
33847753428
-
Two-dimensional encoding schema and genetic operators
-
", Atlantis, Paris.
-
Tsai, M. -W., Hong, T. -P., and Liu, T. -K. (2006). " Two-dimensional encoding schema and genetic operators.." Proc., 9th Joint Conf. on Information Sciences, Atlantis, Paris.
-
(2006)
Proc., 9th Joint Conf. on Information Sciences
-
-
Tsai, M.-W.1
Hong, T.-P.2
Liu, T.-K.3
|