메뉴 건너뛰기




Volumn 2, Issue , 2009, Pages 1025-1034

Finance-based scheduling of multiple construction projects using multiobjective evolutionary algorithms

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINED CONDITIONS; CONSTRUCTION ACTIVITIES; CONSTRUCTION PROJECTS; CORPORATE LEVEL; FINANCE PROJECTS; FINANCIAL PLANNING; MULTI OBJECTIVE EVOLUTIONARY ALGORITHMS; MULTIPLE PROJECTS; PRO-ACTIVE APPROACH; STRENGTH PARETO EVOLUTIONARY ALGORITHM;

EID: 72949124700     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (13)
  • 1
    • 0344395549 scopus 로고    scopus 로고
    • Environmental/Economic Power Dispatch Using Multiobjective Evolutionary Algorithms
    • Abido, M. A. 2003. Environmental/Economic Power Dispatch Using Multiobjective Evolutionary Algorithms, IEEE Trans, on Power Systems, Vol. 18, No. 4: 1529-1537.
    • (2003) IEEE Trans, on Power Systems , vol.18 , Issue.4 , pp. 1529-1537
    • Abido, M.A.1
  • 2
    • 33744773216 scopus 로고    scopus 로고
    • Multiobjective Evolutionary Algorithms for Electric Power Dispatch Problem
    • Abido, M. A. 2006. Multiobjective Evolutionary Algorithms for Electric Power Dispatch Problem, IEEE Trans. on Evolutionary Computations, Vol. 10, No. 3: 315-329.
    • (2006) IEEE Trans. on Evolutionary Computations , vol.10 , Issue.3 , pp. 315-329
    • Abido, M.A.1
  • 4
    • 85133775397 scopus 로고    scopus 로고
    • A Comprehensive Survey of Evolutionary-Based Multiobjective Optimization Techniques
    • Coello, C. A. 1999. A Comprehensive Survey of Evolutionary-Based Multiobjective Optimization Techniques, Knowledge and Information Systems, Vol. 1, No. 3: 269-308.
    • (1999) Knowledge and Information Systems , vol.1 , Issue.3 , pp. 269-308
    • Coello, C.A.1
  • 6
    • 67650306137 scopus 로고    scopus 로고
    • Finance-Based Scheduling of Concurrent Construction Projects Using Integer Programming
    • submitted for publication
    • Elazouni, A. and Hassan, M. 2008. Finance-Based Scheduling of Concurrent Construction Projects Using Integer Programming, Journal of Construction Engineering and Management, submitted for publication.
    • (2008) Journal of Construction Engineering and Management
    • Elazouni, A.1    Hassan, M.2
  • 7
    • 72949091966 scopus 로고    scopus 로고
    • Heuristic Method for Multi-Project Finance-Based Scheduling
    • in press
    • Elazouni, A. 2008. Heuristic Method for Multi-Project Finance-Based Scheduling, Construction Management and Economics, in press.
    • (2008) Construction Management and Economics
    • Elazouni, A.1
  • 8
    • 33646584142 scopus 로고    scopus 로고
    • Optimal planning and scheduling for repetitive construction projects
    • Hyari, K., and El-Rayes, K. 2006. Optimal planning and scheduling for repetitive construction projects, Journal of Management in Engineering, Vol. 22, No. 1: 11-19.
    • (2006) Journal of Management in Engineering , vol.22 , Issue.1 , pp. 11-19
    • Hyari, K.1    El-Rayes, K.2
  • 9
    • 33646171275 scopus 로고    scopus 로고
    • Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
    • Kandil, A. and El-Rayes, K. 2006. Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects, Journal of Construction Engineering and Management, Vol. 132, No. 5: 491-498.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.5 , pp. 491-498
    • Kandil, A.1    El-Rayes, K.2
  • 10
    • 0028592878 scopus 로고
    • Multiobjective optimization of construction schedules
    • Kasprowicz, T. 1994. Multiobjective optimization of construction schedules, Computing in Civil Engineering (New York), Vol. 1, No. 1: 185-190.
    • (1994) Computing in Civil Engineering (New York) , vol.1 , Issue.1 , pp. 185-190
    • Kasprowicz, T.1
  • 11
    • 0028175624 scopus 로고
    • Using genetic algorithms to solve a multiple objective groundwater pollution containment problem
    • Ritzel, J., Eheart, J. W. and Ranjithan, S. 1994. Using genetic algorithms to solve a multiple objective groundwater pollution containment problem, Water Resources Research, Vol. 30, No. 5:1589-1603.
    • (1994) Water Resources Research , vol.30 , Issue.5 , pp. 1589-1603
    • Ritzel, J.1    Eheart, J.W.2    Ranjithan, S.3
  • 12
    • 12344265028 scopus 로고    scopus 로고
    • Applying pareto ranking and niche formation to genetic algorithm-based Multiobjective time-cost optimization
    • Zheng, D., Ng, S. and Kumaraswamy, M. 2005. Applying pareto ranking and niche formation to genetic algorithm-based Multiobjective time-cost optimization, Journal of Construction Engineering and Management, Vol. 131, No. 1: 81-91.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.1    Ng, S.2    Kumaraswamy, M.3
  • 13
    • 0008622621 scopus 로고    scopus 로고
    • An Evolutionary Algorithm for Multiobjective optimization: The Strength Pareto Approach
    • Swiss Federal Institute of Technology, No. 43
    • Zitzler, E. and Thiele, L. 1998. An Evolutionary Algorithm for Multiobjective optimization: The Strength Pareto Approach, Swiss Federal Institute of Technology, TIK-Report, No. 43.
    • (1998) TIK-Report
    • Zitzler, E.1    Thiele, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.