메뉴 건너뛰기




Volumn 17, Issue 8, 2008, Pages 966-974

Resource-constrained construction project scheduling model for profit maximization considering cash flow

Author keywords

Cash flow; Constraint programming; Profit maximization; Resource constrained project scheduling

Indexed keywords

AEROSPACE APPLICATIONS; COMBINATORIAL MATHEMATICS; COMBINATORIAL OPTIMIZATION; COMPUTER PROGRAMMING; CONSTRAINED OPTIMIZATION; CONSTRAINT THEORY; CONSTRUCTION INDUSTRY; CONTRACTORS; CONTRACTS; EARNINGS; FINANCE; INDUSTRIAL ECONOMICS; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MATHEMATICAL MODELS; OPTIMIZATION; PRODUCTION CONTROL; PROJECT MANAGEMENT; SCHEDULING;

EID: 45849109552     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.04.006     Document Type: Article
Times cited : (108)

References (24)
  • 3
    • 0035452591 scopus 로고    scopus 로고
    • A linear programming model for cash flow management in the Brazilian construction industry
    • Barbosa P.S.F., and Pimentel P.R. A linear programming model for cash flow management in the Brazilian construction industry. Construction Management and Economics Routledge 19 5 (2001) 469-479
    • (2001) Construction Management and Economics Routledge , vol.19 , Issue.5 , pp. 469-479
    • Barbosa, P.S.F.1    Pimentel, P.R.2
  • 4
    • 0036142437 scopus 로고    scopus 로고
    • An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows
    • Chiu H.N., and Tsai D.M. An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics Routledge 20 1 (2002) 55-66
    • (2002) Construction Management and Economics Routledge , vol.20 , Issue.1 , pp. 55-66
    • Chiu, H.N.1    Tsai, D.M.2
  • 6
    • 26644469855 scopus 로고    scopus 로고
    • Cash flow forecasting model for general contractors using moving weights of cost categories
    • Park H.K., Han S.H., and Russell J.S. Cash flow forecasting model for general contractors using moving weights of cost categories. Journal of Management in Engineering ASCE 21 4 (2005) 164-172
    • (2005) Journal of Management in Engineering ASCE , vol.21 , Issue.4 , pp. 164-172
    • Park, H.K.1    Han, S.H.2    Russell, J.S.3
  • 8
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: tool to maximize project profit using improved genetic algorithms
    • Elazouni A., and Metwally F.G. Finance-based scheduling: tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management ASCE 131 4 (2005) 400-412
    • (2005) Journal of Construction Engineering and Management ASCE , vol.131 , Issue.4 , pp. 400-412
    • Elazouni, A.1    Metwally, F.G.2
  • 11
    • 0001785657 scopus 로고    scopus 로고
    • Towards more flexible and accurate cash flow forecasting
    • Kaka A.P. Towards more flexible and accurate cash flow forecasting. Construction Management and Economics Routledge 14 1 (1996) 35-44
    • (1996) Construction Management and Economics Routledge , vol.14 , Issue.1 , pp. 35-44
    • Kaka, A.P.1
  • 14
    • 34247501300 scopus 로고    scopus 로고
    • The utility of cash flow forecasts in the management of corporate cash balances
    • Gormley F.M., and Meade N. The utility of cash flow forecasts in the management of corporate cash balances. European Journal of Operational Research Elsevier 182 2 (2007) 923-935
    • (2007) European Journal of Operational Research Elsevier , vol.182 , Issue.2 , pp. 923-935
    • Gormley, F.M.1    Meade, N.2
  • 17
    • 0032623707 scopus 로고    scopus 로고
    • Comparing constraint programming and mathematical programming approaches to discrete optimisation - the change problem
    • Heipcke S. Comparing constraint programming and mathematical programming approaches to discrete optimisation - the change problem. Journal of the Operational Research Society Elsevier 50 6 (1999) 581-595
    • (1999) Journal of the Operational Research Society Elsevier , vol.50 , Issue.6 , pp. 581-595
    • Heipcke, S.1
  • 18
    • 45849149734 scopus 로고    scopus 로고
    • S. Heipcke, Combined modeling and problem solving in mathematical programming and constraint programming, Ph.D. Thesis, School of Business, University of Buckingham, 1999.
    • S. Heipcke, Combined modeling and problem solving in mathematical programming and constraint programming, Ph.D. Thesis, School of Business, University of Buckingham, 1999.
  • 19
    • 33847207840 scopus 로고    scopus 로고
    • Optimization model for resource assignment problems of linear construction projects
    • Liu S.S., and Wang C.J. Optimization model for resource assignment problems of linear construction projects. Automation in Construction Elsevier 16 4 (2007) 460-473
    • (2007) Automation in Construction Elsevier , vol.16 , Issue.4 , pp. 460-473
    • Liu, S.S.1    Wang, C.J.2
  • 23
    • 45849151411 scopus 로고    scopus 로고
    • P.V. Hentenryck, Ilog Opl Stdudio 3.6.1 Language Manual, 1st ed., ILOG, California, 2002.
    • P.V. Hentenryck, Ilog Opl Stdudio 3.6.1 Language Manual, 1st ed., ILOG, California, 2002.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.