Volumn 23, Issue 8, 2005, Pages 797-814

A linear-discrete scheduling model for the resource-constrained project scheduling problem

Author keywords

Construction scheduling; Linear scheduling; Optimization

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; CRITICAL PATH ANALYSIS; MATHEMATICAL MODELS; OPTIMIZATION; SCHEDULING;

EID: 27644433999     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/01446190500040869     Document Type: Article
Times cited : (9)

References (26)
  • 1
    • 0020849266 scopus 로고
    • Maintaining knowledge about temporal intervals
    • Allen, J.F. (1983) Maintaining knowledge about temporal intervals. Communications of the ACM, 26(11), 832-43.
    • (1983) Communications of the ACM , vol.26 , Issue.11 , pp. 832-843
    • Allen, J.F.1
  • 2
    • 0019030430 scopus 로고
    • Simulation of repetitive-unit construction
    • ASCE
    • Ashley, D.B. (1980) Simulation of repetitive-unit construction. Journal of Construction Division, ASCE, 106(2), 185-94.
    • (1980) Journal of Construction Division , vol.106 , Issue.2 , pp. 185-194
    • Ashley, D.B.1
  • 5
    • 0343878238 scopus 로고    scopus 로고
    • Scheduling of linear projects with single loop structures
    • Eldin, N.N. and Senouci, A.B. (2000) Scheduling of linear projects with single loop structures. Advances in Engineering Software, 31, 803-14.
    • (2000) Advances in Engineering Software , vol.31 , pp. 803-814
    • Eldin, N.N.1    Senouci, A.B.2
  • 6
    • 0035335276 scopus 로고    scopus 로고
    • Object oriented model for repetitive construction scheduling
    • ASCE
    • El-Rayes, K. (2001) Object oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, ASCE, 127(3), 199-205.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 199-205
    • El-Rayes, K.1
  • 7
    • 12444344998 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities
    • El-Rayes, K. and Moselhi, O. (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), 433-46.
    • (1998) Construction Management and Economics , vol.16 , Issue.4 , pp. 433-446
    • El-Rayes, K.1    Moselhi, O.2
  • 8
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • ASCE
    • El-Rayes, K. and Moselhi, O. (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, ASCE, 127(1), 18-27.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 9
    • 0036539550 scopus 로고    scopus 로고
    • An object-oriented model for planning and control of housing construction
    • El-Rayes, K., Ramanathan, R. and Moselhi, O. (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), 201-10.
    • (2002) Construction Management and Economics , vol.20 , Issue.3 , pp. 201-210
    • El-Rayes, K.1    Ramanathan, R.2    Moselhi, O.3
  • 14
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • ASCE
    • Johnston, D.W. (1981) Linear scheduling method for highway construction. Journal of Construction Division, ASCE, 107(2), 247-61.
    • (1981) Journal of Construction Division , vol.107 , Issue.2 , pp. 247-261
    • Johnston, D.W.1
  • 16
    • 0035391119 scopus 로고    scopus 로고
    • Optimal repetitive scheduling model with shareable resource constraint
    • ASCE
    • Leu, S. and Hwang, S. (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, ASCE, 127(4), 270-80.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 270-280
    • Leu, S.1    Hwang, S.2
  • 22
    • 0023984188 scopus 로고
    • Extensions to linear scheduling optimization
    • ASCE
    • Russell, A.D. and Caselton, W.F. (1988) Extensions to linear scheduling optimization. Journal of Construction Division, ASCE, 114(1), 36-52.
    • (1988) Journal of Construction Division , vol.114 , Issue.1 , pp. 36-52
    • Russell, A.D.1    Caselton, W.F.2
  • 24
    • 0019030431 scopus 로고
    • Construction planning for linear projects
    • ASCE
    • Selinger, S. (1980) Construction planning for linear projects. Journal of Construction Division, ASCE, 106(2), 195-205.
    • (1980) Journal of Construction Division , vol.106 , Issue.2 , pp. 195-205
    • Selinger, S.1
  • 26
    • 0035521223 scopus 로고    scopus 로고
    • TEMPER: A temporal programmer for time-sensitive control of discrete events
    • Zaidi, A.K. and Levis, A.H. (2001) TEMPER: a temporal programmer for time-sensitive control of discrete events. IEEE Transaction on Systems, Man & Cybernetics - Part A, 31(6), 485-96.
    • (2001) IEEE Transaction on Systems, Man & Cybernetics , vol.31 , Issue.6 PART A , pp. 485-496
    • Zaidi, A.K.1    Levis, A.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.