Maintaining knowledge about temporal intervals
-
Allen, J.F. (1983) Maintaining knowledge about temporal intervals. Communications of the ACM, 26(11), 832-43.
-
(1983)
Communications of the ACM
, vol.26
, Issue.11
, pp. 832-843
-
-
Allen, J.F.1
-
2
-
-
0019030430
-
Simulation of repetitive-unit construction
-
ASCE
-
Ashley, D.B. (1980) Simulation of repetitive-unit construction. Journal of Construction Division, ASCE, 106(2), 185-94.
-
(1980)
Journal of Construction Division
, vol.106
, Issue.2
, pp. 185-194
-
-
Ashley, D.B.1
-
3
-
-
0022917749
-
Application of linear scheduling
-
ASCE
-
Chrzanowski, E.N. and Johnston, D.W. (1986) Application of linear scheduling. Journal of Construction Engineering and Management, ASCE, 112(4), 476-91.
-
(1986)
Journal of Construction Engineering and Management
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski, E.N.1
Johnston, D.W.2
-
5
-
-
0343878238
-
Scheduling of linear projects with single loop structures
-
Eldin, N.N. and Senouci, A.B. (2000) Scheduling of linear projects with single loop structures. Advances in Engineering Software, 31, 803-14.
-
(2000)
Advances in Engineering Software
, vol.31
, pp. 803-814
-
-
Eldin, N.N.1
Senouci, A.B.2
-
6
-
-
0035335276
-
Object oriented model for repetitive construction scheduling
-
ASCE
-
El-Rayes, K. (2001) Object oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, ASCE, 127(3), 199-205.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.3
, pp. 199-205
-
-
El-Rayes, K.1
-
7
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
El-Rayes, K. and Moselhi, O. (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), 433-46.
-
(1998)
Construction Management and Economics
, vol.16
, Issue.4
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
8
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
ASCE
-
El-Rayes, K. and Moselhi, O. (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, ASCE, 127(1), 18-27.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.1
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
9
-
-
0036539550
-
An object-oriented model for planning and control of housing construction
-
El-Rayes, K., Ramanathan, R. and Moselhi, O. (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), 201-10.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.3
, pp. 201-210
-
-
El-Rayes, K.1
Ramanathan, R.2
Moselhi, O.3
-
10
-
-
0022779734
-
Linear scheduling using optimal control theory
-
ASCE
-
Handa, V. and Barcia, R. (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, ASCE, 112(3), 387-93.
-
(1986)
Journal of Construction Engineering and Management
, vol.112
, Issue.3
, pp. 387-393
-
-
Handa, V.1
Barcia, R.2
-
12
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
ASCE
-
Harmelink, D.J. and Rowings, J.E. (1998) Linear scheduling model: development of controlling activity path. Journal of Construction Engineering and Management, ASCE, 124(4), 263-8.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, J.E.2
-
14
-
-
0019583188
-
Linear scheduling method for highway construction
-
ASCE
-
Johnston, D.W. (1981) Linear scheduling method for highway construction. Journal of Construction Division, ASCE, 107(2), 247-61.
-
(1981)
Journal of Construction Division
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
16
-
-
0035391119
-
Optimal repetitive scheduling model with shareable resource constraint
-
ASCE
-
Leu, S. and Hwang, S. (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, ASCE, 127(4), 270-80.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.4
, pp. 270-280
-
-
Leu, S.1
Hwang, S.2
-
17
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
ASCE
-
Moselhi, O. and El-Rayes, K. (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, ASCE, 119(4), 681-97.
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
18
-
-
13944274914
-
Optimized scheduling of linear projects
-
ASCE
-
Moselhi, O. and Hassanein, A. (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, ASCE, 129(6), 664-73.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 664-673
-
-
Moselhi, O.1
Hassanein, A.2
-
20
-
-
0022076783
-
Network scheduling variation for repetitive work
-
ASCE
-
O'Brien, J.J., Kreitzberg, F.C. and Mikes, F.W. (1985) Network scheduling variation for repetitive work. Journal of Construction Engineering and Management, ASCE, 111(2), 105-16.
-
(1985)
Journal of Construction Engineering and Management
, vol.111
, Issue.2
, pp. 105-116
-
-
O'Brien, J.J.1
Kreitzberg, F.C.2
Mikes, F.W.3
-
22
-
-
0023984188
-
Extensions to linear scheduling optimization
-
ASCE
-
Russell, A.D. and Caselton, W.F. (1988) Extensions to linear scheduling optimization. Journal of Construction Division, ASCE, 114(1), 36-52.
-
(1988)
Journal of Construction Division
, vol.114
, Issue.1
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
23
-
-
0027607475
-
New generation of planning structures
-
ASCE
-
Russell, A.D. and Wong, W.C.M. (1993) New generation of planning structures. Journal of Construction Engineering and Management, ASCE, 119(2), 196-214.
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
24
-
-
0019030431
-
Construction planning for linear projects
-
ASCE
-
Selinger, S. (1980) Construction planning for linear projects. Journal of Construction Division, ASCE, 106(2), 195-205.
-
(1980)
Journal of Construction Division
, vol.106
, Issue.2
, pp. 195-205
-
-
Selinger, S.1
-
25
-
-
0028495816
-
CPM/LOB: New methodology to integrate CPM and Line of Balance
-
ASCE
-
Suhail, S.A. and Neale, R.H. (1994) CPM/LOB: new methodology to integrate CPM and Line of Balance. Journal of Construction Engineering and Management, ASCE, 120(2), 667-84.
-
(1994)
Journal of Construction Engineering and Management
, vol.120
, Issue.2
, pp. 667-684
-
-
Suhail, S.A.1
Neale, R.H.2
-
26
-
-
0035521223
-
TEMPER: A temporal programmer for time-sensitive control of discrete events
-
Zaidi, A.K. and Levis, A.H. (2001) TEMPER: a temporal programmer for time-sensitive control of discrete events. IEEE Transaction on Systems, Man & Cybernetics - Part A, 31(6), 485-96.
-
(2001)
IEEE Transaction on Systems, Man & Cybernetics
, vol.31
, Issue.6 PART A
, pp. 485-496
-
-
Zaidi, A.K.1
Levis, A.H.2
|