메뉴 건너뛰기




Volumn 48, Issue 23, 2010, Pages 7177-7194

Capacitated disassembly scheduling with random demand

Author keywords

disassembly; heuristics; production planning; stochastic inventory models

Indexed keywords

CAPACITY RESTRICTION; DISASSEMBLY; DISASSEMBLY SCHEDULING; HEURISTICS; LAGRANGIAN DECOMPOSITION; LAGRANGIAN HEURISTICS; MULTIPLE PRODUCTS; OPTIMISATIONS; PLANNING HORIZONS; PRODUCT STRUCTURE; PRODUCTION PLANNING; RANDOM DEMAND; SECOND LEVEL; SOLUTION QUALITY; STOCHASTIC DEMAND; STOCHASTIC INVENTORY MODEL; SUB-PROBLEMS; TEST RESULTS;

EID: 78349262344     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903469035     Document Type: Article
Times cited : (58)

References (41)
  • 4
    • 0019032810 scopus 로고
    • Deterministic production planning: Algorithm and complexity
    • Florian, M., Lenstra, J. K., and Rinnooy Kan, A. H. G., 1980. Deterministic production planning: algorithm and complexity. Management Science, 26(7), 669-679.
    • (1980) Management Science , vol.26 , Issue.7 , pp. 669-679
    • Florian, M.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 5
    • 0002396293 scopus 로고
    • On convergence rates of subgradient optimization methods
    • Goffin, J. L., 1977. On convergence rates of subgradient optimization methods. Mathematical Programming, 13, 329-347.
    • (1977) Mathematical Programming , vol.13 , pp. 329-347
    • Goffin, J.L.1
  • 6
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • DOI 10.1080/00207540110052157
    • Gungor, A. and Gupta, S. M., 2001. A solution approach to the disassembly line balancing problem in the presence of task failures. International Journal of Production Research, 39(7), 1427-1467. (Pubitemid 35165625)
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2
  • 10
    • 28944452430 scopus 로고    scopus 로고
    • Heuristics for solving disassemble-to-order problems with stochastic yields
    • Inderfurth, K. and Langella, I. M., 2006. Heuristics for solving disassemble-to-order problems with stochastic yields. OR Spectrum, 28, 71-97.
    • (2006) OR Spectrum , vol.28 , pp. 71-97
    • Inderfurth, K.1    Langella, I.M.2
  • 11
    • 60749097706 scopus 로고    scopus 로고
    • A two-stage heuristic for disassembly scheduling with capacity constraints
    • Jeon, H.-B., et al., 2006. A two-stage heuristic for disassembly scheduling with capacity constraints. International Journal of Management Science, 12, 95-112.
    • (2006) International Journal of Management Science , vol.12 , pp. 95-112
    • Jeon, H.-B.1
  • 12
    • 0034963174 scopus 로고    scopus 로고
    • Parallel disassembly sequencing with sequence-dependent operation times
    • Kang, J.-G., et al., 2001. Parallel disassembly sequencing with sequence-dependent operation times. CIRP Annals - Manufacturing Technology, 50, 343-346.
    • (2001) CIRP Annals - Manufacturing Technology , vol.50 , pp. 343-346
    • Kang, J.-G.1
  • 13
    • 1942469261 scopus 로고    scopus 로고
    • Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states
    • Kang, J.-G., et al., 2002. Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states. Journal of the Korean Institute of Industrial Engineers, 28(3), 264-273.
    • (2002) Journal of the Korean Institute of Industrial Engineers , vol.28 , Issue.3 , pp. 264-273
    • Kang, J.-G.1
  • 16
    • 29344457880 scopus 로고    scopus 로고
    • Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
    • Kim, H.-J., Lee, D.-H., and Xirouchakis, P., 2006a. Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality. International Journal of Production Research, 44(1), 195-212.
    • (2006) International Journal of Production Research , vol.44 , Issue.1 , pp. 195-212
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3
  • 17
    • 33748652283 scopus 로고    scopus 로고
    • A Lagrangian heuristic algorithm for disassembly scheduling with capacity constraints
    • Kim, H.-J., Lee, D.-H., and Xirouchakis, P., 2006b. A Lagrangian heuristic algorithm for disassembly scheduling with capacity constraints. Journal of the Operational Research Society, 57(10), 1231-1240.
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.10 , pp. 1231-1240
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3
  • 20
    • 60749122690 scopus 로고    scopus 로고
    • A branch and bound algorithm for disassembly scheduling with assembly product structure
    • Kim, H.-J., et al., 2009. A branch and bound algorithm for disassembly scheduling with assembly product structure. Journal of the Operational Research Society, 60(3), 419-430.
    • (2009) Journal of the Operational Research Society , vol.60 , Issue.3 , pp. 419-430
    • Kim, H.-J.1
  • 21
    • 0041341872 scopus 로고    scopus 로고
    • Disassembly scheduling with multiple product types
    • Kim, H.-J., et al., 2003. Disassembly scheduling with multiple product types. CIRP Annals - Manufacturing Technology, 52, 403-406.
    • (2003) CIRP Annals - Manufacturing Technology , vol.52 , pp. 403-406
    • Kim, H.-J.1
  • 23
  • 25
    • 0036612491 scopus 로고    scopus 로고
    • Demand-driven disassembly optimisation for electronic products
    • Lambert, A. J. D. and Gupta, S. M., 2002. Demand-driven disassembly optimisation for electronic products. Journal of Electronics Manufacturing, 11(2), 121-135.
    • (2002) Journal of Electronics Manufacturing , vol.11 , Issue.2 , pp. 121-135
    • Lambert, A.J.D.1    Gupta, S.M.2
  • 27
    • 33746947335 scopus 로고    scopus 로고
    • Heuristics for demand-driven disassembly planning
    • Langella, I. M., 2007. Heuristics for demand-driven disassembly planning. Computers & Operations Research, 34(2), 552-577.
    • (2007) Computers & Operations Research , vol.34 , Issue.2 , pp. 552-577
    • Langella, I.M.1
  • 28
    • 29344442775 scopus 로고    scopus 로고
    • Disassembly scheduling for products with assembly structure
    • Lee, D.-H., 2005. Disassembly scheduling for products with assembly structure. International Journal of Management Science, 11, 63-78.
    • (2005) International Journal of Management Science , vol.11 , pp. 63-78
    • Lee, D.-H.1
  • 31
    • 2342594041 scopus 로고    scopus 로고
    • A two-stage heuristic for disassembly scheduling with assembly product structure
    • Lee, D.-H. and Xirouchakis, P., 2004. A two-stage heuristic for disassembly scheduling with assembly product structure. Journal of the Operational Research Society, 55(3), 287-297.
    • (2004) Journal of the Operational Research Society , vol.55 , Issue.3 , pp. 287-297
    • Lee, D.-H.1    Xirouchakis, P.2
  • 33
    • 0028378737 scopus 로고
    • Lagrangian heuristics for the capacitated multi-item lot-sizing problem with backordering
    • Millar, H. H. and Yang, M., 1994. Lagrangian heuristics for the capacitated multi-item lot-sizing problem with backordering. International Journal of Production Economics, 34, 1-15.
    • (1994) International Journal of Production Economics , vol.34 , pp. 1-15
    • Millar, H.H.1    Yang, M.2
  • 34
    • 0035429278 scopus 로고    scopus 로고
    • Disassembly scheduling with parts commonality using Petri-nets with timestamps
    • Neuendorf, K.-P., et al., 2001. Disassembly scheduling with parts commonality using Petri-nets with timestamps. Fundamenta Informaticae, 47(4), 295-306.
    • (2001) Fundamenta Informaticae , vol.47 , Issue.4 , pp. 295-306
    • Neuendorf, K.-P.1
  • 36
    • 0033889945 scopus 로고    scopus 로고
    • Remanufacturing Planning for the reverse Wagner/Whitin models
    • Richter, K. and Sombrutzki, M., 2000. Remanufacturing Planning for the reverse Wagner/Whitin models. European Journal of Operational Research, 121(2), 304-315.
    • (2000) European Journal of Operational Research , vol.121 , Issue.2 , pp. 304-315
    • Richter, K.1    Sombrutzki, M.2
  • 37
    • 0036978701 scopus 로고    scopus 로고
    • Computer aided disassembly planning: State of the art and perspectives
    • Santochi, M., Dini, G., and Failli, F., 2002. Computer aided disassembly planning: state of the art and perspectives. CIRP Annals - Manufacturing Technology, 51(2), 1-23.
    • (2002) CIRP Annals - Manufacturing Technology , vol.51 , Issue.2 , pp. 1-23
    • Santochi, M.1    Dini, G.2    Failli, F.3
  • 38
    • 0005041648 scopus 로고    scopus 로고
    • Dynamic lot sizing with random demand and non-stationary costs
    • Sox, C. R., 1997. Dynamic lot sizing with random demand and non-stationary costs. Operations Research Letters, 20(4), 155-164.
    • (1997) Operations Research Letters , vol.20 , Issue.4 , pp. 155-164
    • Sox, C.R.1
  • 39
    • 0031119840 scopus 로고    scopus 로고
    • Disassembly of complex product structures with parts and materials commonality
    • Taleb, K. N., Gupta, S. M., and Brennan, L., 1997. Disassembly of complex product structures with parts and materials commonality. Production Planning & Control, 8(3), 255-269.
    • (1997) Production Planning & Control , vol.8 , Issue.3 , pp. 255-269
    • Taleb, K.N.1    Gupta, S.M.2    Brennan, L.3
  • 40
    • 0031219811 scopus 로고    scopus 로고
    • Disassembly of multiple product structures
    • Taleb, K. N. and Gupta, S. M., 1997. Disassembly of multiple product structures. Computers & Industrial Engineering, 32(4), 949-961.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.4 , pp. 949-961
    • Taleb, K.N.1    Gupta, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.