-
1
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Gungor, A. and Gupta, S. M. Issues in environmentally conscious manufacturing and product recovery: a survey. Computers Ind. Engng, 1999, 36, 811-853.
-
(1999)
Computers Ind. Engng
, vol.36
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
2
-
-
0028330626
-
Simulation study of unit exchange spares management of diesel locomotives in the Indian railways
-
Kumar, N., Vrat, P. and Sushil, A. Simulation study of unit exchange spares management of diesel locomotives in the Indian railways. Int. J. Prod. Econ., 1994, 33, 225-236.
-
(1994)
Int. J. Prod. Econ.
, vol.33
, pp. 225-236
-
-
Kumar, N.1
Vrat, P.2
Sushil, A.3
-
3
-
-
0029356018
-
Disassembly and recycling of electronic consumer products: An overview
-
de Ron, A. and Penev, K. D. Disassembly and recycling of electronic consumer products: an overview. Technovation, 1995, 15, 363-374.
-
(1995)
Technovation
, vol.15
, pp. 363-374
-
-
De Ron, A.1
Penev, K.D.2
-
4
-
-
0029370747
-
Implementation of drum-buffer-rope at a military rework depot engine works
-
Guide Jr, V. D. R. and Ghiselli, G. A. Implementation of drum-buffer-rope at a military rework depot engine works. Prod. Inventory Managmt J., 1995, 36, 79-83.
-
(1995)
Prod. Inventory Managmt J.
, vol.36
, pp. 79-83
-
-
Guide Jr., V.D.R.1
Ghiselli, G.A.2
-
5
-
-
0031386398
-
Disassemblability of mechanical parts in automobile for recycling
-
Mok, H.-S., Kim, H.-J. and Moon, K.-S. Disassemblability of mechanical parts in automobile for recycling. Computers Ind. Engng, 1997, 33, 621-624.
-
(1997)
Computers Ind. Engng
, vol.33
, pp. 621-624
-
-
Mok, H.-S.1
Kim, H.-J.2
Moon, K.-S.3
-
6
-
-
52649149549
-
Air conditioner and washing machine primary disassembly process
-
Tokyo, Japan
-
Uchiyama, Y., Fujisawa, R., Pda, Y. and Hirasawa, E. Air conditioner and washing machine primary disassembly process. In Proceedings of the IEEE International Symposium on Environmentally Conscious Design and Inverse Manufacturing, Tokyo, Japan, 1999, pp. 258-262.
-
(1999)
Proceedings of the IEEE International Symposium on Environmentally Conscious Design and Inverse Manufacturing
, pp. 258-262
-
-
Uchiyama, Y.1
Fujisawa, R.2
Pda, Y.3
Hirasawa, E.4
-
8
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
Brennan, L., Gupta, S. M. and Taleb, K. N. Operations planning issues in an assembly/disassembly environment. Int. J. Ops Prod. Managmt, 1994, 14, 57-67.
-
(1994)
Int. J. Ops Prod. Managmt
, vol.14
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
9
-
-
2342594041
-
A two-stage heuristic for disassembly scheduling with assembly product structure
-
Lee, D.-H. and Xirouchakis, P. A two-stage heuristic for disassembly scheduling with assembly product structure. J. Opl Res. Soc., 2004, 55, 287-297.
-
(2004)
J. Opl Res. Soc.
, vol.55
, pp. 287-297
-
-
Lee, D.-H.1
Xirouchakis, P.2
-
10
-
-
0037501212
-
Disassembly scheduling with capacity constraints
-
Lee, D.-H., Xirouchakis, P. and Züst, R. Disassembly scheduling with capacity constraints. Ann. CIRP, 2002, 51(1), 387-390.
-
(2002)
Ann. CIRP
, vol.51
, Issue.1
, pp. 387-390
-
-
Lee, D.-H.1
Xirouchakis, P.2
Züst, R.3
-
11
-
-
0031119840
-
Disassembly of complex product structures with parts and materials commonality
-
Taleb, K. N., Gupta, S. M. and Brennan, L. Disassembly of complex product structures with parts and materials commonality. Prod. Planning and Control, 1997, 8, 255-269.
-
(1997)
Prod. Planning and Control
, vol.8
, pp. 255-269
-
-
Taleb, K.N.1
Gupta, S.M.2
Brennan, L.3
-
12
-
-
0035429278
-
Disassembly scheduling with parts commonality using Petri-nets with timestamps
-
Neuendorf, K.-P., Lee, D.-H., Kiritsis, D. and Xirouchakis, P. Disassembly scheduling with parts commonality using Petri-nets with timestamps. Fundamenta Informaticae, 2001, 47, 295-306.
-
(2001)
Fundamenta Informaticae
, vol.47
, pp. 295-306
-
-
Neuendorf, K.-P.1
Lee, D.-H.2
Kiritsis, D.3
Xirouchakis, P.4
-
13
-
-
0031219811
-
Disassembly of multiple product structures
-
Taleb, K. N. and Gupta, S. M. Disassembly of multiple product structures. Computers Ind. Engng, 1997, 32, 949-961.
-
(1997)
Computers Ind. Engng
, vol.32
, pp. 949-961
-
-
Taleb, K.N.1
Gupta, S.M.2
-
14
-
-
0041341872
-
Disassembly scheduling with multiple product types
-
Kim, H.-J., Lee, D.-H., Xirouchakis, P. and Züst, R. Disassembly scheduling with multiple product types. Ann. CIRP, 2003, 52(1), 403-406.
-
(2003)
Ann. CIRP
, vol.52
, Issue.1
, pp. 403-406
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
Züst, R.4
-
15
-
-
0023343841
-
Determining lot sizes and resource requirements: A review
-
Bahl, H. C., Ritzman, L. P. and Gupta, J. N. D. Determining lot sizes and resource requirements: a review. Ops Res., 1987, 35, 329-345.
-
(1987)
Ops Res.
, vol.35
, pp. 329-345
-
-
Bahl, H.C.1
Ritzman, L.P.2
Gupta, J.N.D.3
-
16
-
-
0000930416
-
State of the art literature survey on disassembly planning
-
O'Shea, B., Grewal, S. S. and Kaebernick, H. State of the art literature survey on disassembly planning. Concurrent Engng: Res. Applic., 1998, 6, 345-357.
-
(1998)
Concurrent Engng: Res. Applic.
, vol.6
, pp. 345-357
-
-
O'Shea, B.1
Grewal, S.S.2
Kaebernick, H.3
-
17
-
-
33747286457
-
Disassembly planning and scheduling: Review and further research
-
Lee, D.-H., Kang, J.-G. and Xirouchakis, P. Disassembly planning and scheduling: review and further research. Proc. Instn Mech. Engrs, Part B: J. Engineering Manufacture, 2001, 215(B5), 695-710.
-
(2001)
Proc. Instn Mech. Engrs, Part B: J. Engineering Manufacture
, vol.215
, Issue.B5
, pp. 695-710
-
-
Lee, D.-H.1
Kang, J.-G.2
Xirouchakis, P.3
-
18
-
-
0036978701
-
Computer aided disassembly planning: State of the art and perspectives
-
Santochi, M., Dini, G. and Failli, F. Computer aided disassembly planning: state of the art and perspectives. Ann. CIRP, 2002, 51(2), 1-23.
-
(2002)
Ann. CIRP
, vol.51
, Issue.2
, pp. 1-23
-
-
Santochi, M.1
Dini, G.2
Failli, F.3
-
19
-
-
1942469261
-
Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states
-
Kang, J.-G., Lee, D.-H., Xirouchakis, P. and Lambert, A. J. D. Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states. J. Korean Inst. Ind. Engrs, 2002, 28, 264-273.
-
(2002)
J. Korean Inst. Ind. Engrs
, vol.28
, pp. 264-273
-
-
Kang, J.-G.1
Lee, D.-H.2
Xirouchakis, P.3
Lambert, A.J.D.4
-
20
-
-
0034963174
-
Parallel disassembly sequencing with sequence-dependent operation times
-
Kang, J.-G., Lee, D.-H., Xirouchakis, P. and Persson, J.-G. Parallel disassembly sequencing with sequence-dependent operation times. Ann. CIRP, 2001, 50(1), 343-346.
-
(2001)
Ann. CIRP
, vol.50
, Issue.1
, pp. 343-346
-
-
Kang, J.-G.1
Lee, D.-H.2
Xirouchakis, P.3
Persson, J.-G.4
|