메뉴 건너뛰기




Volumn 51, Issue 1, 2002, Pages 387-390

Disassembly scheduling with capacity constraints

Author keywords

Disassembly scheduling; Environment; Optimization

Indexed keywords

INTEGER PROGRAMMING; OPTIMIZATION; PLANNING;

EID: 0037501212     PISSN: 00078506     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0007-8506(07)61543-1     Document Type: Article
Times cited : (68)

References (13)
  • 4
    • 0025888128 scopus 로고
    • Automatic generation of disassembly sequence
    • Subramani, A. K. and Dewhurst, P., 1991, Automatic Generation of Disassembly Sequence, Annals of the CIRP 40: 115-118.
    • (1991) Annals of the CIRP , vol.40 , pp. 115-118
    • Subramani, A.K.1    Dewhurst, P.2
  • 5
    • 0027066109 scopus 로고
    • Planning of products assembly and disassembly
    • Laperrière, L, and EIMaraghy, H. A., 1992, Planning of Products Assembly and Disassembly, Annals of the CIRP 41:5-9.
    • (1992) Annals of the CIRP , vol.41 , pp. 5-9
    • Laperrière, L.1    EiMaraghy, H.A.2
  • 6
    • 0031123978 scopus 로고    scopus 로고
    • Evaluating the end-of-life value of a product and improving it by redesign
    • Pnueli, Y. and Zussman, E., 1997 Evaluating the End-of-Life Value of a Product and Improving it by Redesign, International Journal of Production Research 35:921-942.
    • (1997) International Journal of Production Research , vol.35 , pp. 921-942
    • Pnueli, Y.1    Zussman, E.2
  • 7
    • 0034963174 scopus 로고    scopus 로고
    • Parallel disassembly sequencing with sequence-dependent operation times
    • Kang, J.-G., Lee, D.-H., and Xirouchakis, P. and Persson, J.-G., 2001, Parallel Disassembly Sequencing with Sequence-Dependent Operation Times, Annals of the CIRP 50: 343-346.
    • (2001) Annals of the CIRP , vol.50 , pp. 343-346
    • Kang, J.-G.1    Lee, D.-H.2    Xirouchakis, P.3    Persson, J.-G.4
  • 9
    • 0031119840 scopus 로고    scopus 로고
    • Disassembly of complex product structures with parts and materials commonality
    • Taleb, K. N., Gupta, S. M., and Brennan, L., 1997, Disassembly of Complex Product Structures with Parts and Materials Commonality, Production planning and Control 8: 255-269.
    • (1997) Production Planning and Control , vol.8 , pp. 255-269
    • Taleb, K.N.1    Gupta, S.M.2    Brennan, L.3
  • 11
    • 0035429278 scopus 로고    scopus 로고
    • Disassembly scheduling with parts commonality using petri-nets with timestamps
    • Neuendorf, K.-P., Lee, D.-H., Kiritsis, D. and Xirouchakis, P., 2001, Disassembly Scheduling with Parts Commonality using Petri-Nets with Timestamps, Fundamenta Informaticae 47: 295-306.
    • (2001) Fundamenta Informaticae , vol.47 , pp. 295-306
    • Neuendorf, K.-P.1    Lee, D.-H.2    Kiritsis, D.3    Xirouchakis, P.4
  • 12
    • 0038296816 scopus 로고    scopus 로고
    • Disassembly scheduling for products with assembly structure: Integer programming approach
    • Dept: of Mechanical Engineering, Swiss Federal Institute of Technology - Lausanne
    • Lee, D.-H., Neuendorf, K.-P. and Xirouchakis, P., 2001, Disassembly Scheduling for Products with Assembly Structure: Integer Programming Approach, Technical Report, Dept: of Mechanical Engineering, Swiss Federal Institute of Technology - Lausanne.
    • (2001) Technical Report
    • Lee, D.-H.1    Neuendorf, K.-P.2    Xirouchakis, P.3
  • 13
    • 0023343841 scopus 로고
    • Determining lot sizes and resource requirements: A review
    • Bahl, H. C., Ritzman, L. P. and Gupta, J. N. D., 1987, Determining Lot Sizes and Resource Requirements: A Review, Operations Research 35: 329-345.
    • (1987) Operations Research , vol.35 , pp. 329-345
    • Bahl, H.C.1    Ritzman, L.P.2    Gupta, J.N.D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.