메뉴 건너뛰기




Volumn 8, Issue 3, 1997, Pages 255-269

Disassembly of complex product structures with parts and materials commonality

Author keywords

Commonality; Disassembly; Dismantling; Scheduling

Indexed keywords

ALGORITHMS; INVENTORY CONTROL; SCHEDULING;

EID: 0031119840     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372897235316     Document Type: Article
Times cited : (114)

References (15)
  • 2
    • 85008804108 scopus 로고
    • Car manufacturers focus researchon environment issues.Boston Globe, pp
    • ANONY MOUS, February 17, 1991, Car manufacturers focus researchon environment issues.Boston Globe, pp. A34, Col. 6.
    • (1991) A34, Col , pp. 6
    • Anony, M.1
  • 3
    • 0042369337 scopus 로고
    • Environmental pressures drive auto design
    • BERRY, B., 1991, Environmental pressures drive auto design. Iron Age, 7, 21.
    • (1991) Iron Age , vol.7 , pp. 21
    • Berry, B.1
  • 4
    • 0012930002 scopus 로고
    • Automakers want to recycle all of the car
    • BERRY, B., 1992, Automakers want to recycle all of the car. Iron Age, 8, 28.
    • (1992) Iron Age , vol.8 , pp. 28
    • Berry, B.1
  • 5
    • 0002876912 scopus 로고
    • Germany is in the fast lane as recycling gains speed
    • CHY NOWETH, E., and ROTMAN, D., 1993, Germany is in the fast lane as recycling gains speed. Chemical Week, 152, 18.
    • (1993) Chemical Week , vol.152 , pp. 18
    • Chy Noweth, E.1    Rotman, D.2
  • 7
    • 0027555498 scopus 로고
    • A knowledge based system for combined just-in-time and material require-ments planning
    • GUPTA, S. M., and BRENNAN, L., 1993, A knowledge based system for combined just-in-time and material require-ments planning. Computers and Electrical Engineering, 19, 157-174.
    • (1993) Computers and Electrical Engineering , vol.19 , pp. 157-174
    • Gupta, S.M.1    Brennan, L.2
  • 8
    • 0001353411 scopus 로고
    • Optimal disassembly of complex products
    • GUPTA, S. M., and TALEB, K. N., 1994, Scheduling disassembly. International Journal of Production Research, 32, 1857-1866. LAMBERT, A. J. D
    • GUPTA, S. M., and TALEB, K. N., 1994, Scheduling disassembly. International Journal of Production Research, 32, 1857-1866. LAMBERT, A. J. D., 1994, Optimal disassembly of complex products. Proceedings of the North East Decision Sciences Institute Conference, pp.74-80.
    • (1994) Proceedings of the North East Decision Sciences Institute Conference , pp. 74-80
  • 9
    • 0042870461 scopus 로고
    • Breaking down an arms buildup: Dismantling and recycling weapons
    • MEIER, B., 1993, Breaking down an arms buildup: dismantling and recycling weapons. New York Times (Late New York Edition), pp. D1-D2.
    • (1993) New York Times (Late New York Edition) , pp. D1-D2
    • Meier, B.1
  • 11
    • 40649103074 scopus 로고
    • Production and Operations Analysis
    • Boston, MA
    • NAHMIAS, S., 1993, Production and Operations Analysis, 2nd edn (Irwin, Boston, MA).
    • (1993) (Irwin
    • Nahmias, S.1
  • 12
  • 13
    • 0042722695 scopus 로고
    • Design for disassembly tactics
    • NOLLER, R., 1992, Design for disassembly tactics. Assembly, 35, 24.
    • (1992) Assembly , vol.35 , pp. 24
    • Noller, R.1
  • 15
    • 0024142713 scopus 로고
    • Green machine, Volkswagon gears up to recycle autos
    • PANISSET, B. D., 1988, MRP II for repair/refurbish industries. Production and Inventory Management Journal, 29, 12-15. PLOSSL, G., and WIGHT, O., 1971, Materials Requirements Planning by Computer (American Production and Inventory Con-trol Society, Washington, DC).STIX, G
    • PANISSET, B. D., 1988, MRP II for repair/refurbish industries. Production and Inventory Management Journal, 29, 12-15. PLOSSL, G., and WIGHT, O., 1971, Materials Requirements Planning by Computer (American Production and Inventory Con-trol Society, Washington, DC).STIX, G., 1992, Green machine, Volkswagon gears up to recycle autos. Scientific American, 266, 140-141.
    • (1992) Scientific American , vol.266 , pp. 140-141


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.