메뉴 건너뛰기




Volumn 48, Issue 13, 2010, Pages 3823-3843

Dynamic production control in a serial line with process queue time constraint

Author keywords

Dynamic programming; Dynamic scheduling; Flexibility; Flexible manufacturing; Queueing systems; Stochastic methods

Indexed keywords

DYNAMIC SCHEDULING; FLEXIBLE MANUFACTURING; QUEUEING SYSTEM; QUEUEING SYSTEMS; STOCHASTIC METHODS;

EID: 77952621964     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540902922836     Document Type: Article
Times cited : (27)

References (29)
  • 1
    • 0035248367 scopus 로고    scopus 로고
    • Cycle-time improvements for photolithography process in semiconductor manufacturing
    • Akcali, E., Nemoto, K., and Uzsoy, R., 2001. Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 14 (1), 48-56.
    • (2001) IEEE Transactions on Semiconductor Manufacturing , vol.14 , Issue.1 , pp. 48-56
    • Akcali, E.1    Nemoto, K.2    Uzsoy, R.3
  • 2
    • 34249065815 scopus 로고    scopus 로고
    • Influence of capacity- and time-constrained intermediate storage in two-stage food production systems
    • DOI 10.1080/00207540600806463, PII 778788716
    • Akkerman, R., Van Donk, D. P., and Gaalman, G., 2007. Influence of capacity- and timeconstrained intermediate storage in two-stage food production systems. International Journal of Production Research, 45 (13), 2955-2973. (Pubitemid 46782035)
    • (2007) International Journal of Production Research , vol.45 , Issue.13 , pp. 2955-2973
    • Akkerman, R.1    Van Donk, D.P.2    Gaalman, G.3
  • 3
    • 1542475878 scopus 로고    scopus 로고
    • Local scheduling problems submitted to global FIFO processing constraints
    • Bernier, V. and Frein, Y., 2004. Local scheduling problems submitted to global FIFO processing constraints. International Journal of Production Research, 42 (8), 1483-1504.
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1483-1504
    • Bernier, V.1    Frein, Y.2
  • 4
    • 0037375169 scopus 로고    scopus 로고
    • Admission control policies for two-stage tandem queues with no waiting spaces
    • Chang, K.-H. and Chen, W.-F., 2003. Admission control policies for two-stage tandem queues with no waiting spaces. Computers & Operations Research, 30 (4), 589-601.
    • (2003) Computers & Operations Research , vol.30 , Issue.4 , pp. 589-601
    • Chang, K.-H.1    Chen, W.-F.2
  • 5
    • 56749170897 scopus 로고    scopus 로고
    • An efficient new job release control methodology
    • Chao, Qi., et al., 2009. An efficient new job release control methodology. International Journal of Production Research, 47 (3), 703-731.
    • (2009) International Journal of Production Research , vol.47 , Issue.3 , pp. 703-731
    • Chao, Q.1
  • 8
    • 0037138041 scopus 로고    scopus 로고
    • Optimal batching in a wafer fabrication facility using a multi-product G/G/c model with batch processing
    • Fowler, J. W., et al., 2002. Optimal batching in a wafer fabrication facility using a multi-product G/G/c model with batch processing. International Journal of Production Research, 40 (2), 275-292.
    • (2002) International Journal of Production Research , vol.40 , Issue.2 , pp. 275-292
    • Fowler, J.W.1
  • 9
    • 77952637727 scopus 로고    scopus 로고
    • Time constraint simulation to reduce fab bottleneck machine cycle time
    • In:, 18-21 October 2006, Busan
    • Hsieh, M.-Y. and Hsieh, M.-H., 2001. Time constraint simulation to reduce fab bottleneck machine cycle time. In: Proceedings of the Chinese Institute of Industry Conference, 18-21 October 2006, Busan, 1100-1103.
    • (2001) Proceedings of the Chinese Institute of Industry Conference , pp. 1100-1103
    • Hsieh, M.-Y.1    Hsieh, M.-H.2
  • 11
    • 34250782621 scopus 로고    scopus 로고
    • Capacity planning method for semiconductor fab with time constraints between operations
    • In:, 18-21 October 2006, Busan
    • Kitamura, S., Mori, K., and Ono, A., 2006. Capacity planning method for semiconductor fab with time constraints between operations. In: SICE-ICASE, international joint conference, 18-21 October 2006, Busan, 1100-1103.
    • (2006) SICE-ICASE, International Joint Conference , pp. 1100-1103
    • Kitamura, S.1    Mori, K.2    Ono, A.3
  • 12
    • 0031190988 scopus 로고    scopus 로고
    • Access control to two multiserver loss queues in series
    • Ku, C.-Y. and Jordan, S., 1997. Access control to two multiserver loss queues in series. IEEE Transactions on Automatic Control, 42 (7), 1017-1023.
    • (1997) IEEE Transactions on Automatic Control , vol.42 , Issue.7 , pp. 1017-1023
    • Ku, C.-Y.1    Jordan, S.2
  • 14
    • 0016533472 scopus 로고
    • Applying a new device in the optimization of exponential queuing systems
    • Lippman, S. A., 1975. Applying a new device in the optimization of exponential queuing systems. Operations Research, 23 (4), 687-710.
    • (1975) Operations Research , vol.23 , Issue.4 , pp. 687-710
    • Lippman, S.A.1
  • 15
    • 4344668159 scopus 로고    scopus 로고
    • Optimal control of a remanufacturing system
    • Nakashima, K., et al., 2004. Optimal control of a remanufacturing system. International Journal of Production Research, 42 (17), 3619-3625.
    • (2004) International Journal of Production Research , vol.42 , Issue.17 , pp. 3619-3625
    • Nakashima, K.1
  • 18
    • 0033330365 scopus 로고    scopus 로고
    • Capacity planning for semiconductor wafer fabrication with time constraints between operations
    • In:, 5-8 December 1999, Phoenix, Arizona
    • Robinson, J. K. and Giglio, R., 1999. Capacity planning for semiconductor wafer fabrication with time constraints between operations. In: Winter Simulation Conference, 5-8 December 1999, Phoenix, Arizona, 880-887.
    • (1999) Winter Simulation Conference , pp. 880-887
    • Robinson, J.K.1    Giglio, R.2
  • 20
    • 0033307341 scopus 로고    scopus 로고
    • CONLOAD-A new lot release rule for semiconductor wafer fabs
    • 5-8 December 1999, Phoenix, Arizona
    • Rose, O., 1999. CONLOAD-A new lot release rule for semiconductor wafer fabs. In: Winter simulation conference, 5-8 December 1999, Phoenix, Arizona, 850-855.
    • (1999) Winter Simulation Conference , pp. 850-855
    • Rose, O.1
  • 22
    • 0034249293 scopus 로고    scopus 로고
    • Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations
    • Scholl, W. and Domaschke, J., 2000. Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. IEEE Transactions on Semiconductor Manufacturing, 13 (3), 273-277.
    • (2000) IEEE Transactions on Semiconductor Manufacturing , vol.13 , Issue.3 , pp. 273-277
    • Scholl, W.1    Domaschke, J.2
  • 23
    • 27844453227 scopus 로고    scopus 로고
    • Model to determine the backup capacity of a wafer foundry
    • Tu, Y.-M., et al., 2005. Model to determine the backup capacity of a wafer foundry. International Journal of Production Research, 43 (2), 339-359.
    • (2005) International Journal of Production Research , vol.43 , Issue.2 , pp. 339-359
    • Tu, Y.-M.1
  • 24
    • 33744727366 scopus 로고    scopus 로고
    • Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication
    • Tu, Y.-M. and Liou, C.-S., 2006. Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication. Journal of the Chinese Institute of Industrial Engineers, 23 (3), 192-199.
    • (2006) Journal of the Chinese Institute of Industrial Engineers , vol.23 , Issue.3 , pp. 192-199
    • Tu, Y.-M.1    Liou, C.-S.2
  • 25
    • 74549179054 scopus 로고    scopus 로고
    • Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication
    • DOI: 10.1080/00207540802415568
    • Tu, Y.-M. and Chen., H.-N., 2008. Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication. International Journal of Production Research, to appear, DOI: 10.1080/00207540802415568.
    • (2008) International Journal of Production Research, to Appear
    • Tu, Y.-M.1    Chen, H.-N.2
  • 27
    • 33244455259 scopus 로고    scopus 로고
    • Dynamic allocation of reconfigurable resources in a two-stage tandem queueing system with reliability considerations
    • Wu, C.-H., Lewis, M. E., and Veatch, M., 2006. Dynamic allocation of reconfigurable resources in a two-stage tandem queueing system with reliability considerations. IEEE Transactions on Automatic Control, 51 (2), 309-314.
    • (2006) IEEE Transactions on Automatic Control , vol.51 , Issue.2 , pp. 309-314
    • Wu, C.-H.1    Lewis, M.E.2    Veatch, M.3
  • 29
    • 0029184695 scopus 로고
    • A two-machine flowshop sequencing problem with limited waiting time constraint
    • Yang, D.-L. and Chern, M.-S., 1995. A two-machine flowshop sequencing problem with limited waiting time constraint. Computers and Industrial Engineering, 28 (1), 63-70.
    • (1995) Computers and Industrial Engineering , vol.28 , Issue.1 , pp. 63-70
    • Yang, D.-L.1    Chern, M.-S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.