-
1
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
Akcali, E., Nemoto, K., and Uzsoy, R., 2001. Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 14 (1), 48-56.
-
(2001)
IEEE Transactions on Semiconductor Manufacturing
, vol.14
, Issue.1
, pp. 48-56
-
-
Akcali, E.1
Nemoto, K.2
Uzsoy, R.3
-
2
-
-
34249065815
-
Influence of capacity- and time-constrained intermediate storage in two-stage food production systems
-
DOI 10.1080/00207540600806463, PII 778788716
-
Akkerman, R., Van Donk, D. P., and Gaalman, G., 2007. Influence of capacity- and timeconstrained intermediate storage in two-stage food production systems. International Journal of Production Research, 45 (13), 2955-2973. (Pubitemid 46782035)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.13
, pp. 2955-2973
-
-
Akkerman, R.1
Van Donk, D.P.2
Gaalman, G.3
-
3
-
-
1542475878
-
Local scheduling problems submitted to global FIFO processing constraints
-
Bernier, V. and Frein, Y., 2004. Local scheduling problems submitted to global FIFO processing constraints. International Journal of Production Research, 42 (8), 1483-1504.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.8
, pp. 1483-1504
-
-
Bernier, V.1
Frein, Y.2
-
4
-
-
0037375169
-
Admission control policies for two-stage tandem queues with no waiting spaces
-
Chang, K.-H. and Chen, W.-F., 2003. Admission control policies for two-stage tandem queues with no waiting spaces. Computers & Operations Research, 30 (4), 589-601.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.4
, pp. 589-601
-
-
Chang, K.-H.1
Chen, W.-F.2
-
5
-
-
56749170897
-
An efficient new job release control methodology
-
Chao, Qi., et al., 2009. An efficient new job release control methodology. International Journal of Production Research, 47 (3), 703-731.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.3
, pp. 703-731
-
-
Chao, Q.1
-
6
-
-
0030212054
-
A queueing network model for semiconductor manufacturing
-
Connors, D. P., Feigin, G. E., and Yao, D. D., 1996. A queueing network model for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 9 (3), 412-427.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, Issue.3
, pp. 412-427
-
-
Connors, D.P.1
Feigin, G.E.2
Yao, D.D.3
-
8
-
-
0037138041
-
Optimal batching in a wafer fabrication facility using a multi-product G/G/c model with batch processing
-
Fowler, J. W., et al., 2002. Optimal batching in a wafer fabrication facility using a multi-product G/G/c model with batch processing. International Journal of Production Research, 40 (2), 275-292.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.2
, pp. 275-292
-
-
Fowler, J.W.1
-
9
-
-
77952637727
-
Time constraint simulation to reduce fab bottleneck machine cycle time
-
In:, 18-21 October 2006, Busan
-
Hsieh, M.-Y. and Hsieh, M.-H., 2001. Time constraint simulation to reduce fab bottleneck machine cycle time. In: Proceedings of the Chinese Institute of Industry Conference, 18-21 October 2006, Busan, 1100-1103.
-
(2001)
Proceedings of the Chinese Institute of Industry Conference
, pp. 1100-1103
-
-
Hsieh, M.-Y.1
Hsieh, M.-H.2
-
11
-
-
34250782621
-
Capacity planning method for semiconductor fab with time constraints between operations
-
In:, 18-21 October 2006, Busan
-
Kitamura, S., Mori, K., and Ono, A., 2006. Capacity planning method for semiconductor fab with time constraints between operations. In: SICE-ICASE, international joint conference, 18-21 October 2006, Busan, 1100-1103.
-
(2006)
SICE-ICASE, International Joint Conference
, pp. 1100-1103
-
-
Kitamura, S.1
Mori, K.2
Ono, A.3
-
12
-
-
0031190988
-
Access control to two multiserver loss queues in series
-
Ku, C.-Y. and Jordan, S., 1997. Access control to two multiserver loss queues in series. IEEE Transactions on Automatic Control, 42 (7), 1017-1023.
-
(1997)
IEEE Transactions on Automatic Control
, vol.42
, Issue.7
, pp. 1017-1023
-
-
Ku, C.-Y.1
Jordan, S.2
-
13
-
-
28744454195
-
Reaction chain of process queue time quality control
-
In:, 13-15 September 2005, San Jose, California
-
Lee, Y.-Y., Chen, C. T., and Wu, C., 2005. Reaction chain of process queue time quality control. In: Semiconductor Manufacturing, ISSM, IEEE International Symposium, 13-15 September 2005, San Jose, California, 47-50.
-
(2005)
Semiconductor Manufacturing, ISSM, IEEE International Symposium
, pp. 47-50
-
-
Lee, Y.-Y.1
Chen, C.T.2
Wu, C.3
-
14
-
-
0016533472
-
Applying a new device in the optimization of exponential queuing systems
-
Lippman, S. A., 1975. Applying a new device in the optimization of exponential queuing systems. Operations Research, 23 (4), 687-710.
-
(1975)
Operations Research
, vol.23
, Issue.4
, pp. 687-710
-
-
Lippman, S.A.1
-
15
-
-
4344668159
-
Optimal control of a remanufacturing system
-
Nakashima, K., et al., 2004. Optimal control of a remanufacturing system. International Journal of Production Research, 42 (17), 3619-3625.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.17
, pp. 3619-3625
-
-
Nakashima, K.1
-
18
-
-
0033330365
-
Capacity planning for semiconductor wafer fabrication with time constraints between operations
-
In:, 5-8 December 1999, Phoenix, Arizona
-
Robinson, J. K. and Giglio, R., 1999. Capacity planning for semiconductor wafer fabrication with time constraints between operations. In: Winter Simulation Conference, 5-8 December 1999, Phoenix, Arizona, 880-887.
-
(1999)
Winter Simulation Conference
, pp. 880-887
-
-
Robinson, J.K.1
Giglio, R.2
-
19
-
-
0000932095
-
Optimal control of service in tandem queues
-
Rosberg, Z., Varaiya, P. P., and Walrand, J. C., 1982. Optimal control of service in tandem queues. IEEE Transaction Automatic Control, 27 (3), 600-609.
-
(1982)
IEEE Transaction Automatic Control
, vol.27
, Issue.3
, pp. 600-609
-
-
Rosberg, Z.1
Varaiya, P.P.2
Walrand, J.C.3
-
20
-
-
0033307341
-
CONLOAD-A new lot release rule for semiconductor wafer fabs
-
5-8 December 1999, Phoenix, Arizona
-
Rose, O., 1999. CONLOAD-A new lot release rule for semiconductor wafer fabs. In: Winter simulation conference, 5-8 December 1999, Phoenix, Arizona, 850-855.
-
(1999)
Winter Simulation Conference
, pp. 850-855
-
-
Rose, O.1
-
22
-
-
0034249293
-
Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations
-
Scholl, W. and Domaschke, J., 2000. Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. IEEE Transactions on Semiconductor Manufacturing, 13 (3), 273-277.
-
(2000)
IEEE Transactions on Semiconductor Manufacturing
, vol.13
, Issue.3
, pp. 273-277
-
-
Scholl, W.1
Domaschke, J.2
-
23
-
-
27844453227
-
Model to determine the backup capacity of a wafer foundry
-
Tu, Y.-M., et al., 2005. Model to determine the backup capacity of a wafer foundry. International Journal of Production Research, 43 (2), 339-359.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.2
, pp. 339-359
-
-
Tu, Y.-M.1
-
24
-
-
33744727366
-
Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication
-
Tu, Y.-M. and Liou, C.-S., 2006. Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication. Journal of the Chinese Institute of Industrial Engineers, 23 (3), 192-199.
-
(2006)
Journal of the Chinese Institute of Industrial Engineers
, vol.23
, Issue.3
, pp. 192-199
-
-
Tu, Y.-M.1
Liou, C.-S.2
-
25
-
-
74549179054
-
Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication
-
DOI: 10.1080/00207540802415568
-
Tu, Y.-M. and Chen., H.-N., 2008. Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication. International Journal of Production Research, to appear, DOI: 10.1080/00207540802415568.
-
(2008)
International Journal of Production Research, to Appear
-
-
Tu, Y.-M.1
Chen, H.-N.2
-
27
-
-
33244455259
-
Dynamic allocation of reconfigurable resources in a two-stage tandem queueing system with reliability considerations
-
Wu, C.-H., Lewis, M. E., and Veatch, M., 2006. Dynamic allocation of reconfigurable resources in a two-stage tandem queueing system with reliability considerations. IEEE Transactions on Automatic Control, 51 (2), 309-314.
-
(2006)
IEEE Transactions on Automatic Control
, vol.51
, Issue.2
, pp. 309-314
-
-
Wu, C.-H.1
Lewis, M.E.2
Veatch, M.3
-
28
-
-
0037139690
-
On control strategies in a multi-stage production system
-
Xiaobo, Z., Gong, Q., and Wang, J., 2002. On control strategies in a multi-stage production system. International Journal of Production Research, 40 (5), 1155-1171.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.5
, pp. 1155-1171
-
-
Xiaobo, Z.1
Gong, Q.2
Wang, J.3
-
29
-
-
0029184695
-
A two-machine flowshop sequencing problem with limited waiting time constraint
-
Yang, D.-L. and Chern, M.-S., 1995. A two-machine flowshop sequencing problem with limited waiting time constraint. Computers and Industrial Engineering, 28 (1), 63-70.
-
(1995)
Computers and Industrial Engineering
, vol.28
, Issue.1
, pp. 63-70
-
-
Yang, D.-L.1
Chern, M.-S.2
|