-
1
-
-
34249023767
-
Analysing scheduling in the food-processing industry: Structure and tasks
-
in press
-
Akkerman, R. and van Donk, D.P., Analysing scheduling in the food-processing industry: structure and tasks. Cogn. Technol. Work, 2006 (in press).
-
(2006)
Cogn. Technol. Work
-
-
Akkerman, R.1
van Donk, D.P.2
-
2
-
-
21844487379
-
The SPT priority sequence rule
-
Bassett, G. and Todd, R., The SPT priority sequence rule. Int. J. Oper. Prod. Mgmt, 1994, 14, 70-78.
-
(1994)
Int. J. Oper. Prod. Mgmt
, vol.14
, pp. 70-78
-
-
Bassett, G.1
Todd, R.2
-
3
-
-
0040905926
-
Detailed scheduling for a class of two-stage intermittent manufacturing systems
-
Belarbi, K. and Hindi, K.S., Detailed scheduling for a class of two-stage intermittent manufacturing systems. Prod. Plann. Contr., 1992, 7, 36-47.
-
(1992)
Prod. Plann. Contr
, vol.7
, pp. 36-47
-
-
Belarbi, K.1
Hindi, K.S.2
-
4
-
-
34249003495
-
-
Cox, J.F. and Blackstone, J.H, editors, 10th ed, American Production and Inventory Control Society: Alexandria, VA
-
Cox, J.F. and Blackstone, J.H., editors, APICS Dictionary, 10th ed., 2002 (American Production and Inventory Control Society: Alexandria, VA).
-
(2002)
APICS Dictionary
-
-
-
5
-
-
0023995996
-
Two-stage, hybrid flowshop scheduling problem
-
Gupta, J.N.D., Two-stage, hybrid flowshop scheduling problem. J. Oper. Res. Soc., 1988, 39, 359-364.
-
(1988)
J. Oper. Res. Soc
, vol.39
, pp. 359-364
-
-
Gupta, J.N.D.1
-
6
-
-
0026190509
-
Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
-
Gupta, J.N.D. and Tune, E.A., Schedules for a two-stage hybrid flowshop with parallel machines at the second stage. Int. J. Prod. Res., 1991, 29, 1489-1502.
-
(1991)
Int. J. Prod. Res
, vol.29
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tune, E.A.2
-
7
-
-
0037056089
-
A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
-
Holthaus, O. and Rajendran, C., A study on the performance of scheduling rules in buffer-constrained dynamic flowshops. Int. J. Prod. Res., 2002, 40, 3041-3052.
-
(2002)
Int. J. Prod. Res
, vol.40
, pp. 3041-3052
-
-
Holthaus, O.1
Rajendran, C.2
-
8
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times included
-
Johnson, S.M., Optimal two- and three-stage production schedules with setup times included. Nov. Res. Logist. Q., 1954, 1, 61-68.
-
(1954)
Nov. Res. Logist. Q
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
9
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations - I. MILP formulation
-
Kondili, E., Pantelides, C.C. and Sargent, R.W., A general algorithm for short-term scheduling of batch operations - I. MILP formulation. Comput. Chem. Engng, 1993, 17, 211-227.
-
(1993)
Comput. Chem. Engng
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.3
-
10
-
-
0031248652
-
A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
-
Li, S., A hybrid two-stage flowshop with part family, batch production, major and minor set-ups. Eur. J. Oper. Res., 1997, 102, 142-156.
-
(1997)
Eur. J. Oper. Res
, vol.102
, pp. 142-156
-
-
Li, S.1
-
11
-
-
0021466086
-
Scheduling in a two-stage manufacturing process
-
Narasimhan, S.L. and Panwalkar, S.S., Scheduling in a two-stage manufacturing process. Int. J. Prod. Res., 1984, 22, 555-564.
-
(1984)
Int. J. Prod. Res
, vol.22
, pp. 555-564
-
-
Narasimhan, S.L.1
Panwalkar, S.S.2
-
12
-
-
0032649738
-
The permutation flow shop with buffers: A tabu search approach
-
Nowicki, E., The permutation flow shop with buffers: a tabu search approach. Eur. J. Oper. Res., 1999, 116, 205-219.
-
(1999)
Eur. J. Oper. Res
, vol.116
, pp. 205-219
-
-
Nowicki, E.1
-
13
-
-
84976662527
-
Flowshop scheduling with limited temporary storage
-
Papadimitriou, C.H. and Kanellakis, P.C., Flowshop scheduling with limited temporary storage. J. ACM, 1980, 27, 533-549.
-
(1980)
J. ACM
, vol.27
, pp. 533-549
-
-
Papadimitriou, C.H.1
Kanellakis, P.C.2
-
14
-
-
0003438602
-
-
2nd ed, Prentice Hall: Upper Saddle River, NJ
-
Pinedo, M., Scheduling: Theory, Algorithms, and Systems, 2nd ed., 2002 (Prentice Hall: Upper Saddle River, NJ).
-
(2002)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
15
-
-
0032386621
-
Assignment and sequencing models for the scheduling of process systems
-
Pinto, J.M. and Grossmann, I.E., Assignment and sequencing models for the scheduling of process systems. Ann. Oper. Res., 1998, 81, 433-466.
-
(1998)
Ann. Oper. Res
, vol.81
, pp. 433-466
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
16
-
-
0033895628
-
Scheduling with batching: A review
-
Potts, C.N. and Kovalyov, M.Y., Scheduling with batching: a review. Eur. J. Oper. Res., 2000, 120, 228-249.
-
(2000)
Eur. J. Oper. Res
, vol.120
, pp. 228-249
-
-
Potts, C.N.1
Kovalyov, M.Y.2
-
17
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flowshops and jobshops
-
Rajendran, C. and Holthaus, O., A comparative study of dispatching rules in dynamic flowshops and jobshops. Eur. J. Oper. Res., 1999, 116, 156-170.
-
(1999)
Eur. J. Oper. Res
, vol.116
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
18
-
-
0024881398
-
Shelf life considerations in a family production context
-
Silver, E.A., Shelf life considerations in a family production context. Int. J. Prod. Res., 1989, 27, 2021-2026.
-
(1989)
Int. J. Prod. Res
, vol.27
, pp. 2021-2026
-
-
Silver, E.A.1
-
19
-
-
0037349179
-
A hybrid two-stage flowshop with limited waiting time constraints
-
Su, L.-H., A hybrid two-stage flowshop with limited waiting time constraints. Comput. Ind. Engng, 2003, 44, 409-424.
-
(2003)
Comput. Ind. Engng
, vol.44
, pp. 409-424
-
-
Su, L.-H.1
-
20
-
-
0030291549
-
The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
-
Tsubone, H., Ohba, M. and Uetake, T., The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop. Int. J. Prod. Res., 1996, 34, 3037-3053.
-
(1996)
Int. J. Prod. Res
, vol.34
, pp. 3037-3053
-
-
Tsubone, H.1
Ohba, M.2
Uetake, T.3
-
21
-
-
0035852790
-
Make to stock or make to order: The decoupling point in the food processing industries
-
van Donk, D.P., Make to stock or make to order: the decoupling point in the food processing industries. Int. J. Prod. Econ., 2001, 69, 297-306.
-
(2001)
Int. J. Prod. Econ
, vol.69
, pp. 297-306
-
-
van Donk, D.P.1
-
22
-
-
0029338650
-
Scheduling groups of jobs on a single machine
-
Webster, S.T. and Baker, K.R., Scheduling groups of jobs on a single machine. Oper. Res., 1995, 43, 692-703.
-
(1995)
Oper. Res
, vol.43
, pp. 692-703
-
-
Webster, S.T.1
Baker, K.R.2
-
23
-
-
0029184695
-
A two-machine flowshop sequencing problem with limited waiting time constraints
-
Yang, D.-L. and Chern, M.-S., A two-machine flowshop sequencing problem with limited waiting time constraints. Comput. Ind. Engng, 1995, 28, 63-70.
-
(1995)
Comput. Ind. Engng
, vol.28
, pp. 63-70
-
-
Yang, D.-L.1
Chern, M.-S.2
-
24
-
-
0034660723
-
Optimal operation of quality controlled product storage
-
Yi, G., Suh, K.-H., Lee, B. and Lee, E.S., Optimal operation of quality controlled product storage. Comput. Chem. Engng, 2000, 24, 475-480.
-
(2000)
Comput. Chem. Engng
, vol.24
, pp. 475-480
-
-
Yi, G.1
Suh, K.-H.2
Lee, B.3
Lee, E.S.4
|