-
1
-
-
0032257638
-
A simulation based decision support approach for operational capacity planning in a customer order driven assembly line
-
Washington, DC, USA, 2
-
Andersson, M. and Olsson, G., 1998. A simulation based decision support approach for operational capacity planning in a customer order driven assembly line. In: Proceedings of the 1998 winter simulation conference, Washington, DC, USA, 2, 935-941.
-
(1998)
Proceedings of the 1998 winter simulation conference
, pp. 935-941
-
-
Andersson, M.1
Olsson, G.2
-
2
-
-
0023981636
-
Empirical evaluation of a queuing network model for semiconductor wafer fabrication
-
Chen, H., et al., 1988. Empirical evaluation of a queuing network model for semiconductor wafer fabrication. Operations Research, 36 (2), 202-215.
-
(1988)
Operations Research
, vol.36
, Issue.2
, pp. 202-215
-
-
Chen, H.1
-
3
-
-
0036468406
-
Semiconductor capacity planning: Stochastic modeling and computational studies
-
Christie, R.M.E. and Wu, S.D., 2002. Semiconductor capacity planning: stochastic modeling and computational studies. IIE Transactions, 34 (2), 131-143.
-
(2002)
IIE Transactions
, vol.34
, Issue.2
, pp. 131-143
-
-
Christie, R.M.E.1
Wu, S.D.2
-
4
-
-
0036468403
-
Cycle time estimation for wafer fab with engineering lots
-
Chung, S.S. and Huang, H.W., 2002. Cycle time estimation for wafer fab with engineering lots. IIE Transactions, 34 (2), 105-118.
-
(2002)
IIE Transactions
, vol.34
, Issue.2
, pp. 105-118
-
-
Chung, S.S.1
Huang, H.W.2
-
5
-
-
0030212054
-
A queueing network model for semiconductor manufacturing
-
Connors, D.P., Feigin, G.E., and Yao, D.D., 1996. A queueing network model for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 9 (3), 412-427.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, Issue.3
, pp. 412-427
-
-
Connors, D.P.1
Feigin, G.E.2
Yao, D.D.3
-
6
-
-
0038630719
-
Capacity planning under demand uncertainty for semiconductor manufacturing
-
Hood, S.J., Bermon, S., and Barahona, F., 2003. Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 16 (2), 273-280.
-
(2003)
IEEE Transactions on Semiconductor Manufacturing
, vol.16
, Issue.2
, pp. 273-280
-
-
Hood, S.J.1
Bermon, S.2
Barahona, F.3
-
7
-
-
0004253213
-
-
2nd ed. New York: Irwin/McGraw-Hill
-
Hopp, W.J. and Spearman, M.L., 1996. Factory physics. 2nd ed. New York: Irwin/McGraw-Hill, 260-263.
-
(1996)
Factory physics
, pp. 260-263
-
-
Hopp, W.J.1
Spearman, M.L.2
-
8
-
-
0030150549
-
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
-
Hung, Y.F. and Leachman, R.C., 1996. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing, 9 (2), 257-269.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, Issue.2
, pp. 257-269
-
-
Hung, Y.F.1
Leachman, R.C.2
-
9
-
-
0002549571
-
On capacity modeling for production planning with alternative matching types
-
Leachman, R.C. and Carmon, T., 1992. On capacity modeling for production planning with alternative matching types. IIE Transactions, 24 (4), 62-72.
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 62-72
-
-
Leachman, R.C.1
Carmon, T.2
-
10
-
-
1242265223
-
Queuing network analysis approach for estimating the size of the time buffers in theory of constraints - controlled production systems
-
Louw, L. and Page, D.C., 2004. Queuing network analysis approach for estimating the size of the time buffers in theory of constraints - controlled production systems. International Journal of Production Research, 42 (6), 1207-1226.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.6
, pp. 1207-1226
-
-
Louw, L.1
Page, D.C.2
-
11
-
-
0001239965
-
A many-server queue with service interruptions
-
Mitrany, I.L. and Avi-Itzhak, B., 1968. A many-server queue with service interruptions. Operations Research, 16 (3), 628-638.
-
(1968)
Operations Research
, vol.16
, Issue.3
, pp. 628-638
-
-
Mitrany, I.L.1
Avi-Itzhak, B.2
-
12
-
-
0033330365
-
Capacity planning for semiconductor wafer fabrication with time constraints between operations
-
Phoenix, AZ, USA, 1
-
Robinson, J.K. and Giglio, R., 1999. Capacity planning for semiconductor wafer fabrication with time constraints between operations. In: Proceedings of the 1999 winter simulation conference, Phoenix, AZ, USA, 1, 880-887.
-
(1999)
Proceedings of the 1999 winter simulation conference
, pp. 880-887
-
-
Robinson, J.K.1
Giglio, R.2
-
13
-
-
0033314649
-
On the corrupting influence of variability in semiconductor manufacturing
-
Phoenix, AZ, USA, 1
-
Schoemig, A.K., 1999. On the corrupting influence of variability in semiconductor manufacturing. In: Proceedings of the 1999 winter simulation conference, Phoenix, AZ, USA, 1, 837-842.
-
(1999)
Proceedings of the 1999 winter simulation conference
, pp. 837-842
-
-
Schoemig, A.K.1
-
14
-
-
0029478868
-
Correlation between yield and waiting time: A quantitative study
-
Srnivasan, K., Sandell, R., and Brown, S., 1995. Correlation between yield and waiting time: a quantitative study. In: 1995 IEEE/CPMT international electronics manufacturing technology symposium, Texas, 65-69.
-
(1995)
1995 IEEE/CPMT international electronics manufacturing technology symposium, Texas, 65-69
-
-
Srnivasan, K.1
Sandell, R.2
Brown, S.3
-
15
-
-
74549140144
-
-
Tu, Y.M. and Chen, H.N., 2006. Waiting time approximation with resource failure. In:16th international conference on Pacific Rim management, Honolulu, HI, USA.
-
Tu, Y.M. and Chen, H.N., 2006. Waiting time approximation with resource failure. In:16th international conference on Pacific Rim management, Honolulu, HI, USA.
-
-
-
-
16
-
-
74549132372
-
-
Tu, Y.M. and Chen, H.N., 2007. Model to determine the capacity of a wafer foundry with sequential time constraints. In:17th international conference on Pacific Rim management, Las Vegas.
-
Tu, Y.M. and Chen, H.N., 2007. Model to determine the capacity of a wafer foundry with sequential time constraints. In:17th international conference on Pacific Rim management, Las Vegas.
-
-
-
-
17
-
-
27844453227
-
Model to determine the backup capacity of a wafer foundry
-
Tu, Y.M., et al., 2005. Model to determine the backup capacity of a wafer foundry. International Journal of Production Research, 43 (2), 339-359.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.2
, pp. 339-359
-
-
Tu, Y.M.1
-
18
-
-
33744727366
-
Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication
-
Tu, Y.M. and Liou, C.S., 2006. Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication. Journal of the Chinese Institute of Industrial Engineers, 23 (3), 192-199.
-
(2006)
Journal of the Chinese Institute of Industrial Engineers
, vol.23
, Issue.3
, pp. 192-199
-
-
Tu, Y.M.1
Liou, C.S.2
-
19
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry, Part 1: System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C.Y., and Louis, A.M., 1992. A review of production planning and scheduling models in the semiconductor industry, Part 1: System characteristics, performance evaluation and production planning. IIE Transactions, 24 (4), 47-60.
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Louis, A.M.3
-
20
-
-
0020848139
-
The queueing network analyzer
-
Whitt, W., 1983. The queueing network analyzer. The Bell System Technical Journal, 62 (9), 2779-2815.
-
(1983)
The Bell System Technical Journal
, vol.62
, Issue.9
, pp. 2779-2815
-
-
Whitt, W.1
-
21
-
-
84986958774
-
Approximations for the GI/G/m queue
-
Whitt, W., 1993. Approximations for the GI/G/m queue. Production and Operations Management,2 (2), 114-161.
-
(1993)
Production and Operations Management
, vol.2
, Issue.2
, pp. 114-161
-
-
Whitt, W.1
-
22
-
-
22444434389
-
Managing capacity in the high-tech industry: A review of literature
-
Wu, S.D., Erkoc, M., and Karabuk, S., 2005. Managing capacity in the high-tech industry: a review of literature. The Engineering Economist, 50 (2), 125-158.
-
(2005)
The Engineering Economist
, vol.50
, Issue.2
, pp. 125-158
-
-
Wu, S.D.1
Erkoc, M.2
Karabuk, S.3
|