메뉴 건너뛰기




Volumn 47, Issue 24, 2009, Pages 6967-6979

Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication

Author keywords

Capacity planning; Operational research; Production control; Production management; Production planning; Semiconductor manufacture

Indexed keywords

CAPACITY PLANNING; OPERATIONAL RESEARCH; PRODUCTION MANAGEMENT; PRODUCTION PLANNING; SEMICONDUCTOR MANUFACTURES;

EID: 74549179054     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802415568     Document Type: Article
Times cited : (14)

References (22)
  • 1
    • 0032257638 scopus 로고    scopus 로고
    • A simulation based decision support approach for operational capacity planning in a customer order driven assembly line
    • Washington, DC, USA, 2
    • Andersson, M. and Olsson, G., 1998. A simulation based decision support approach for operational capacity planning in a customer order driven assembly line. In: Proceedings of the 1998 winter simulation conference, Washington, DC, USA, 2, 935-941.
    • (1998) Proceedings of the 1998 winter simulation conference , pp. 935-941
    • Andersson, M.1    Olsson, G.2
  • 2
    • 0023981636 scopus 로고
    • Empirical evaluation of a queuing network model for semiconductor wafer fabrication
    • Chen, H., et al., 1988. Empirical evaluation of a queuing network model for semiconductor wafer fabrication. Operations Research, 36 (2), 202-215.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 202-215
    • Chen, H.1
  • 3
    • 0036468406 scopus 로고    scopus 로고
    • Semiconductor capacity planning: Stochastic modeling and computational studies
    • Christie, R.M.E. and Wu, S.D., 2002. Semiconductor capacity planning: stochastic modeling and computational studies. IIE Transactions, 34 (2), 131-143.
    • (2002) IIE Transactions , vol.34 , Issue.2 , pp. 131-143
    • Christie, R.M.E.1    Wu, S.D.2
  • 4
    • 0036468403 scopus 로고    scopus 로고
    • Cycle time estimation for wafer fab with engineering lots
    • Chung, S.S. and Huang, H.W., 2002. Cycle time estimation for wafer fab with engineering lots. IIE Transactions, 34 (2), 105-118.
    • (2002) IIE Transactions , vol.34 , Issue.2 , pp. 105-118
    • Chung, S.S.1    Huang, H.W.2
  • 7
    • 0004253213 scopus 로고    scopus 로고
    • 2nd ed. New York: Irwin/McGraw-Hill
    • Hopp, W.J. and Spearman, M.L., 1996. Factory physics. 2nd ed. New York: Irwin/McGraw-Hill, 260-263.
    • (1996) Factory physics , pp. 260-263
    • Hopp, W.J.1    Spearman, M.L.2
  • 8
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • Hung, Y.F. and Leachman, R.C., 1996. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing, 9 (2), 257-269.
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 9
    • 0002549571 scopus 로고
    • On capacity modeling for production planning with alternative matching types
    • Leachman, R.C. and Carmon, T., 1992. On capacity modeling for production planning with alternative matching types. IIE Transactions, 24 (4), 62-72.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 62-72
    • Leachman, R.C.1    Carmon, T.2
  • 10
    • 1242265223 scopus 로고    scopus 로고
    • Queuing network analysis approach for estimating the size of the time buffers in theory of constraints - controlled production systems
    • Louw, L. and Page, D.C., 2004. Queuing network analysis approach for estimating the size of the time buffers in theory of constraints - controlled production systems. International Journal of Production Research, 42 (6), 1207-1226.
    • (2004) International Journal of Production Research , vol.42 , Issue.6 , pp. 1207-1226
    • Louw, L.1    Page, D.C.2
  • 11
    • 0001239965 scopus 로고
    • A many-server queue with service interruptions
    • Mitrany, I.L. and Avi-Itzhak, B., 1968. A many-server queue with service interruptions. Operations Research, 16 (3), 628-638.
    • (1968) Operations Research , vol.16 , Issue.3 , pp. 628-638
    • Mitrany, I.L.1    Avi-Itzhak, B.2
  • 12
    • 0033330365 scopus 로고    scopus 로고
    • Capacity planning for semiconductor wafer fabrication with time constraints between operations
    • Phoenix, AZ, USA, 1
    • Robinson, J.K. and Giglio, R., 1999. Capacity planning for semiconductor wafer fabrication with time constraints between operations. In: Proceedings of the 1999 winter simulation conference, Phoenix, AZ, USA, 1, 880-887.
    • (1999) Proceedings of the 1999 winter simulation conference , pp. 880-887
    • Robinson, J.K.1    Giglio, R.2
  • 13
    • 0033314649 scopus 로고    scopus 로고
    • On the corrupting influence of variability in semiconductor manufacturing
    • Phoenix, AZ, USA, 1
    • Schoemig, A.K., 1999. On the corrupting influence of variability in semiconductor manufacturing. In: Proceedings of the 1999 winter simulation conference, Phoenix, AZ, USA, 1, 837-842.
    • (1999) Proceedings of the 1999 winter simulation conference , pp. 837-842
    • Schoemig, A.K.1
  • 15
    • 74549140144 scopus 로고    scopus 로고
    • Tu, Y.M. and Chen, H.N., 2006. Waiting time approximation with resource failure. In:16th international conference on Pacific Rim management, Honolulu, HI, USA.
    • Tu, Y.M. and Chen, H.N., 2006. Waiting time approximation with resource failure. In:16th international conference on Pacific Rim management, Honolulu, HI, USA.
  • 16
    • 74549132372 scopus 로고    scopus 로고
    • Tu, Y.M. and Chen, H.N., 2007. Model to determine the capacity of a wafer foundry with sequential time constraints. In:17th international conference on Pacific Rim management, Las Vegas.
    • Tu, Y.M. and Chen, H.N., 2007. Model to determine the capacity of a wafer foundry with sequential time constraints. In:17th international conference on Pacific Rim management, Las Vegas.
  • 17
    • 27844453227 scopus 로고    scopus 로고
    • Model to determine the backup capacity of a wafer foundry
    • Tu, Y.M., et al., 2005. Model to determine the backup capacity of a wafer foundry. International Journal of Production Research, 43 (2), 339-359.
    • (2005) International Journal of Production Research , vol.43 , Issue.2 , pp. 339-359
    • Tu, Y.M.1
  • 18
    • 33744727366 scopus 로고    scopus 로고
    • Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication
    • Tu, Y.M. and Liou, C.S., 2006. Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication. Journal of the Chinese Institute of Industrial Engineers, 23 (3), 192-199.
    • (2006) Journal of the Chinese Institute of Industrial Engineers , vol.23 , Issue.3 , pp. 192-199
    • Tu, Y.M.1    Liou, C.S.2
  • 19
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part 1: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.Y., and Louis, A.M., 1992. A review of production planning and scheduling models in the semiconductor industry, Part 1: System characteristics, performance evaluation and production planning. IIE Transactions, 24 (4), 47-60.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Louis, A.M.3
  • 20
    • 0020848139 scopus 로고
    • The queueing network analyzer
    • Whitt, W., 1983. The queueing network analyzer. The Bell System Technical Journal, 62 (9), 2779-2815.
    • (1983) The Bell System Technical Journal , vol.62 , Issue.9 , pp. 2779-2815
    • Whitt, W.1
  • 21
    • 84986958774 scopus 로고
    • Approximations for the GI/G/m queue
    • Whitt, W., 1993. Approximations for the GI/G/m queue. Production and Operations Management,2 (2), 114-161.
    • (1993) Production and Operations Management , vol.2 , Issue.2 , pp. 114-161
    • Whitt, W.1
  • 22
    • 22444434389 scopus 로고    scopus 로고
    • Managing capacity in the high-tech industry: A review of literature
    • Wu, S.D., Erkoc, M., and Karabuk, S., 2005. Managing capacity in the high-tech industry: a review of literature. The Engineering Economist, 50 (2), 125-158.
    • (2005) The Engineering Economist , vol.50 , Issue.2 , pp. 125-158
    • Wu, S.D.1    Erkoc, M.2    Karabuk, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.