메뉴 건너뛰기




Volumn , Issue , 2006, Pages 1100-1103

Capacity planning method for semiconductor fab with time constraints between operations

Author keywords

Capacity planning; Queue time; Queuing theory; Risk based planning; Semiconductor fabrication

Indexed keywords

CAPACITY PLANNING; QUEUE TIME CONSTRAINTS; QUEUING THEORY; RISK BASED PLANNING;

EID: 34250782621     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SICE.2006.315820     Document Type: Conference Paper
Times cited : (12)

References (5)
  • 1
    • 0033330365 scopus 로고    scopus 로고
    • Capacity Planning for Semiconductor Wafer Fabrication with Time Constraints between Operators
    • Robinson, Giglio, "Capacity Planning for Semiconductor Wafer Fabrication with Time Constraints between Operators," Proceeding of 1999 Winter Simulation Conference, pp 880-887, 1999.
    • (1999) Proceeding of 1999 Winter Simulation Conference , pp. 880-887
    • Robinson, G.1
  • 2
    • 0031355419 scopus 로고    scopus 로고
    • Artificial Immunity Based Management System for a Semiconductor Production Line
    • Man, and Cybernetics, pp
    • K. Mori, M. Tsukiyama and T. Fukuda, "Artificial Immunity Based Management System for a Semiconductor Production Line," Proceeding of IEEE 1997 Int. Conf. on Systems, Man, and Cybernetics, pp 851-855, 1997.
    • (1997) Proceeding of IEEE 1997 Int. Conf. on Systems , pp. 851-855
    • Mori, K.1    Tsukiyama, M.2    Fukuda, T.3
  • 5
    • 34250747796 scopus 로고    scopus 로고
    • The Need for Speed: IBM's Raw Process Time Reduction Success Means Faster Turnaround Time for Customers
    • Christopher Konarski, Neil Peruffo and Ron Warren, "The Need for Speed: IBM's Raw Process Time Reduction Success Means Faster Turnaround Time for Customers," IBM Micro News Fourth Quarter 2001, vol.7, No.4, pp 8-10, 2001.
    • (2001) IBM Micro News Fourth Quarter , vol.7 , Issue.4 , pp. 8-10
    • Konarski, C.1    Peruffo, N.2    Warren, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.