|
Volumn 1, Issue , 1999, Pages 880-887
|
Capacity planning for semiconductor wafer fabrication with time constraints between operations
a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
COMPUTER SIMULATION;
CONSTRAINT THEORY;
DISCRETE TIME CONTROL SYSTEMS;
MATHEMATICAL MODELS;
OPERATIONS RESEARCH;
PLANNING;
PROBABILITY;
QUEUEING THEORY;
SEMICONDUCTOR DEVICE MANUFACTURE;
SPREADSHEETS;
CAPACITY PLANNING;
DISCRETE TIME EVENT SIMULATION;
TIME BOUND SEQUENCE;
TIME CONSTRAINTS;
COMPUTER INTEGRATED MANUFACTURING;
|
EID: 0033330365
PISSN: 02750708
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1145/324138.324545 Document Type: Conference Paper |
Times cited : (43)
|
References (21)
|