-
1
-
-
0024769152
-
Implementing a loading heuristic in a discrete release job shop
-
Bobrowski, P. M., 1989, Implementing a loading heuristic in a discrete release job shop. International Journal of Production Research, 27, 1935-1948.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1935-1948
-
-
Bobrowski, P.M.1
-
2
-
-
0004113622
-
-
Reading, MA: Addison-Wesley)
-
Conway, R. W., Maxwell, W. L., and Miller, L. W., 1967, Theory of Scheduling (Reading, MA: Addison-Wesley).
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
3
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S., and Chowdhury, I. G., 1976, Due dates in job shop scheduling. International Journal of Production Research, 14, 223-237.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 223-237
-
-
Eilon, S.1
Chowdhury, I.G.2
-
4
-
-
0000327811
-
Alternative order release mechanisms: A comparison by simulation
-
Hendry, L. C., and Wong, S. K., 1994, Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research, 32, 2827-2842.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2827-2842
-
-
Hendry, L.C.1
Wong, S.K.2
-
5
-
-
0016319331
-
A loading and balancing methodology for job shop control
-
Irastorza, J. C., and Deane, R. H., 1974, A loading and balancing methodology for job shop control. AIIE Transactions, 6, 302-307.
-
(1974)
AIIE Transactions
, vol.6
, pp. 302-307
-
-
Irastorza, J.C.1
Deane, R.H.2
-
6
-
-
0000955366
-
An order release mechanism for a flexible flow system
-
Lingayat, S., Mittenthal, J., and O’ Keefe, R. M., 1995, An order release mechanism for a flexible flow system. International Journal of Production Research, 33, 1241-1256.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1241-1256
-
-
Lingayat, S.1
Mittenthal, J.2
O’ Keefe, R.M.3
-
7
-
-
0017937913
-
A problem of aggregate scheduling: An application for goal programming
-
Lockett, A. G., and Muhlemann, A. P., 1978, A problem of aggregate scheduling: an application for goal programming. International Journal of Production Research, 16, 127-135.
-
(1978)
International Journal of Production Research
, vol.16
, pp. 127-135
-
-
Lockett, A.G.1
Muhlemann, A.P.2
-
8
-
-
0024700372
-
Order review/release: Research issues and perspectives
-
Melnyk, S. A., and Ragatz, G. L., 1989, Order review/release: research issues and perspectives. International Journal of Production Research, 27, 1081-1096.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1081-1096
-
-
Melnyk, S.A.1
Ragatz, G.L.2
-
9
-
-
0004249572
-
-
Englewood Cliffs, NJ: Prentice Hall)
-
Narasimhan, S. L., Mcleavey, D. W., and Billington, P. J., 1995, Production Planning and Inventory Control (Englewood Cliffs, NJ: Prentice Hall).
-
(1995)
Production Planning and Inventory Control
-
-
Narasimhan, S.L.1
Mc Leavey, D.W.2
Billington, P.J.3
-
10
-
-
0023312276
-
An input/output control system for the dynamic job shop
-
Onus, L., and Fabrycky, W. J., 1987, An input/output control system for the dynamic job shop. IIE Transactions, 19, 88-97.
-
(1987)
IIE Transactions
, vol.19
, pp. 88-97
-
-
Onus, L.1
Fabrycky, W.J.2
-
11
-
-
0026953379
-
Capacity-based order review/release strategies to improve manufacturing performance
-
Philipoom, P.R., and Fry, T. D., 1992, Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research, 30, 2559-2572.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2559-2572
-
-
Philipoom, P.R.1
Fry, T.D.2
-
13
-
-
84985757538
-
An evaluation of order release mechanisms in a job-shop environment
-
Ragatz, G. L., and Mabert, V. A., 1988, An evaluation of order release mechanisms in a job-shop environment. Decision Sciences, 19, 167-189.
-
(1988)
Decision Sciences
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
14
-
-
38249007625
-
A note of workload-dependent due date assignment rules
-
Ragatz, G. L., 1989, A note of workload-dependent due date assignment rules. Journal of Operations Management, 8, 377-384.
-
(1989)
Journal of Operations Management
, vol.8
, pp. 377-384
-
-
Ragatz, G.L.1
-
15
-
-
0026836253
-
A comparison of order release strategies in production control systems
-
Roderick, L. M., Phillips, D. T., and Hogg, G. L., 1992, A comparison of order release strategies in production control systems. International Journal of Production Research, 30, 611-626.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 611-626
-
-
Roderick, L.M.1
Phillips, D.T.2
Hogg, G.L.3
-
16
-
-
0026186620
-
Dynamic rules for due-date assignment
-
Vig, M. M., and Dooley, K. J., 1991, Dynamic rules for due-date assignment. International Journal of Production Research, 29, 1361-1377.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
17
-
-
0027565391
-
Mixed static and dynamic flowtime estimates for duedate assignment
-
Vig, M. M., and Dooley, K. J., 1993, Mixed static and dynamic flowtime estimates for duedate assignment. Journal of Operations Management, 2, 67-79.
-
(1993)
Journal of Operations Management
, vol.2
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
18
-
-
0027609191
-
New concepts for production planning and control
-
Zapfel, G., and Missbauer, H., 1993, New concepts for production planning and control. European Journal of Operational Research, 67, 297-320.
-
(1993)
European Journal of Operational Research
, vol.67
, pp. 297-320
-
-
Zapfel, G.1
Missbauer, H.2
|