메뉴 건너뛰기




Volumn 45, Issue 1, 2003, Pages 215-229

Scheduling for on-time completion in job shops using feasibility function

Author keywords

Due date based scheduling; Feasibility function; Job shop; Multi agent architecture; On time completion

Indexed keywords

CUSTOMER SATISFACTION; MULTI AGENT SYSTEMS; PRODUCTION; QUALITY CONTROL; RELIABILITY; SCHEDULING;

EID: 0038581751     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(03)00042-1     Document Type: Article
Times cited : (21)

References (13)
  • 1
    • 0034325416 scopus 로고    scopus 로고
    • Dynamic job-shop scheduling using reinforcement learning agents
    • Aydin M.E., Öztemel E. Dynamic job-shop scheduling using reinforcement learning agents. Robotics and Autonomous Systems. 33:(3):2000;169-178.
    • (2000) Robotics and Autonomous Systems , vol.33 , Issue.3 , pp. 169-178
    • Aydin, M.E.1    Öztemel, E.2
  • 3
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker K.R., Scudder G.D. Sequencing with earliness and tardiness penalties: a review. Operations Research. 38:1989;22-36.
    • (1989) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 4
    • 0032041372 scopus 로고    scopus 로고
    • Job shop scheduling for missed due date performance
    • Cheng T.C.E., Jiang J. Job shop scheduling for missed due date performance. Computers & Industrial Engineering. 34:(2):1997;297-307.
    • (1997) Computers & Industrial Engineering , vol.34 , Issue.2 , pp. 297-307
    • Cheng, T.C.E.1    Jiang, J.2
  • 6
    • 0002792672 scopus 로고
    • Control robotics: The procedural control of physical processes
    • Dertouzos, M. L (1974). Control robotics: The procedural control of physical processes. Proceedings of the IFIP Congress (pp. 807-813).
    • (1974) Proceedings of the IFIP Congress , pp. 807-813
    • Dertouzos, M.L.1
  • 9
    • 0025897854 scopus 로고
    • Minimizing weighted number of tardy jobs and weighted earliness tardiness penalties about a common due date
    • Lee C.Y., Liman S.D., Lin C.S. Minimizing weighted number of tardy jobs and weighted earliness tardiness penalties about a common due date. Computers and Operations Research. 18:1991;379-389.
    • (1991) Computers and Operations Research , vol.18 , pp. 379-389
    • Lee, C.Y.1    Liman, S.D.2    Lin, C.S.3
  • 12
    • 0035479473 scopus 로고    scopus 로고
    • Computer simulation of due-date setting in multi-machine job shops
    • Veral E.A. Computer simulation of due-date setting in multi-machine job shops. Computers & Industrial Engineering. 41:2001;77-94.
    • (2001) Computers & Industrial Engineering , vol.41 , pp. 77-94
    • Veral, E.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.