메뉴 건너뛰기




Volumn 45, Issue 14, 2007, Pages 3245-3262

Using dispatching rules for job shop scheduling with due date-based objectives

Author keywords

Dispatching rules; Due dates; Jop shop; Scheduling

Indexed keywords

COMPUTATIONAL METHODS; COMPUTER SIMULATION; PRODUCT DESIGN; SCHEDULING;

EID: 34249341750     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600786715     Document Type: Article
Times cited : (74)

References (24)
  • 1
    • 27844498692 scopus 로고    scopus 로고
    • The modified critical ratio: Towards sequencing with a continuous decision domain
    • Abu-Suleiman, A., Pratt, D.B. and Boardman, B., The modified critical ratio: towards sequencing with a continuous decision domain. Int. J. Prod. Res., 2005, 43(15), 3287-3296.
    • (2005) Int. J. Prod. Res , vol.43 , Issue.15 , pp. 3287-3296
    • Abu-Suleiman, A.1    Pratt, D.B.2    Boardman, B.3
  • 2
    • 0025694085 scopus 로고
    • Two new rules to minimize tardiness in a job shop
    • Anderson, E.J. and Nyirenda, J.C., Two new rules to minimize tardiness in a job shop. Int. J. Prod. Res., 1990, 28(3), 2277-2292.
    • (1990) Int. J. Prod. Res , vol.28 , Issue.3 , pp. 2277-2292
    • Anderson, E.J.1    Nyirenda, J.C.2
  • 4
    • 0031256963 scopus 로고    scopus 로고
    • Simple priority rule combinations: An approach to improve both flow time and tardiness
    • Barman, S., Simple priority rule combinations: an approach to improve both flow time and tardiness. Int. J. Prod. Res., 1997, 35(10), 2857-2870.
    • (1997) Int. J. Prod. Res , vol.35 , Issue.10 , pp. 2857-2870
    • Barman, S.1
  • 5
    • 0032074551 scopus 로고    scopus 로고
    • The impact of priority rule combinations on lateness and tardiness
    • Barman, S., The impact of priority rule combinations on lateness and tardiness. IIE Trans., 1998, 30, 495-504.
    • (1998) IIE Trans , vol.30 , pp. 495-504
    • Barman, S.1
  • 6
    • 0030217535 scopus 로고    scopus 로고
    • Ranking dispatching rules by data envelopment analysis in a job shop environment
    • Chang, Y.-L., Sueyoshi, T. and Sullivan, R.S., Ranking dispatching rules by data envelopment analysis in a job shop environment. IIE Trans., 1996, 28, 631-642.
    • (1996) IIE Trans , vol.28 , pp. 631-642
    • Chang, Y.-L.1    Sueyoshi, T.2    Sullivan, R.S.3
  • 7
    • 3042580921 scopus 로고    scopus 로고
    • Solving the FMS scheduling problem by critical ratio-based heuristics and the genetic algorithm
    • Chiang, T.-C. and Fu, L.-C., Solving the FMS scheduling problem by critical ratio-based heuristics and the genetic algorithm, in Proceedings of the IEEE Conference on Robotics and Automation, 2004, Vol. 3, pp. 3131-3136.
    • (2004) Proceedings of the IEEE Conference on Robotics and Automation , vol.3 , pp. 3131-3136
    • Chiang, T.-C.1    Fu, L.-C.2
  • 8
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multi-objective genetic algorithm: NSGA-II
    • Deb, K., Pratap, A., Agarwal, S. and Meyarivan, T., A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Trans. Evol. Computat., 2002, 6(2), 181-197.
    • (2002) IEEE Trans. Evol. Computat , vol.6 , Issue.2 , pp. 181-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 9
    • 0000418020 scopus 로고    scopus 로고
    • Benchmarks for shop scheduling problems
    • Demirkol, E., Mehta, S. and Uzsoy, R., Benchmarks for shop scheduling problems. Eur. J. Oper. Res., 1998, 109, 137-141.
    • (1998) Eur. J. Oper. Res , vol.109 , pp. 137-141
    • Demirkol, E.1    Mehta, S.2    Uzsoy, R.3
  • 11
    • 0034651053 scopus 로고    scopus 로고
    • New dispatching rules for shop scheduling: A step forward
    • Jayamonhan, M.S. and Rajendran, C., New dispatching rules for shop scheduling: a step forward. Int. J. Prod. Res., 2000, 38(3), 563-586.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.3 , pp. 563-586
    • Jayamonhan, M.S.1    Rajendran, C.2
  • 12
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules
    • Jeong, K.-C. and Kim, Y.-D., A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. Int. J. Prod. Res., 1998, 36(9), 2609-2626.
    • (1998) Int. J. Prod. Res , vol.36 , Issue.9 , pp. 2609-2626
    • Jeong, K.-C.1    Kim, Y.-D.2
  • 13
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling in a flexible manufacturing system
    • Kim, M.H. and Kim, Y.-D., Simulation-based real-time scheduling in a flexible manufacturing system. J. Manuf. Sys., 1994, 13(2), 85-93.
    • (1994) J. Manuf. Sys , vol.13 , Issue.2 , pp. 85-93
    • Kim, M.H.1    Kim, Y.-D.2
  • 14
    • 0037954326 scopus 로고    scopus 로고
    • Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility
    • Kim, Y.-D., Shim, S.-O., Choi, B. and Hwang, H., Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility. IEEE Trans. Semiconduct. Manuf., 2003, 16(2), 290-298.
    • (2003) IEEE Trans. Semiconduct. Manuf , vol.16 , Issue.2 , pp. 290-298
    • Kim, Y.-D.1    Shim, S.-O.2    Choi, B.3    Hwang, H.4
  • 15
    • 2942637921 scopus 로고    scopus 로고
    • A new rule for minimizing the number of tardy jobs in dynamic flow shops
    • Lodree Jr, E., Jang, W. and Klein, C.M., A new rule for minimizing the number of tardy jobs in dynamic flow shops. Eur. J. Oper. Res., 2004, 159, 258-263.
    • (2004) Eur. J. Oper. Res , vol.159 , pp. 258-263
    • Lodree Jr, E.1    Jang, W.2    Klein, C.M.3
  • 16
    • 0010842657 scopus 로고
    • A survey of priority rules for FMS scheduling and their performance for the benchmark problem
    • Moser, M. and Engell, S., A survey of priority rules for FMS scheduling and their performance for the benchmark problem, in Proceedings of the 31st Conference on Decision and Control, 1992, pp. 392-397.
    • (1992) Proceedings of the 31st Conference on Decision and Control , pp. 392-397
    • Moser, M.1    Engell, S.2
  • 17
    • 0031165072 scopus 로고    scopus 로고
    • Dynamic selection of dispatching rules for manufacturing system scheduling
    • Pierreval, H. and Mebarki, N., Dynamic selection of dispatching rules for manufacturing system scheduling. Int. J. Prod. Res., 1997, 35, 1575-1591.
    • (1997) Int. J. Prod. Res , vol.35 , pp. 1575-1591
    • Pierreval, H.1    Mebarki, N.2
  • 18
    • 0027699991 scopus 로고
    • An efficient dynamic dispatching rule for scheduling in a job shop
    • Raghu, T.S. and Rajendran, C., An efficient dynamic dispatching rule for scheduling in a job shop. Int. J. Prod. Econ., 1993, 32, 301-313.
    • (1993) Int. J. Prod. Econ , vol.32 , pp. 301-313
    • Raghu, T.S.1    Rajendran, C.2
  • 19
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flowshops and job shops
    • Rajendran, C. and Holthaus, O., A comparative study of dispatching rules in dynamic flowshops and job shops. Eur. J. Oper. Res., 1999, 116, 156-170.
    • (1999) Eur. J. Oper. Res , vol.116 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 20
    • 0036928708 scopus 로고    scopus 로고
    • Some issues of the critical ratio dispatch rule in semiconductor manufacturing
    • Rose, O., Some issues of the critical ratio dispatch rule in semiconductor manufacturing, in Proceedings of the 2002 Winter Simulation Conference, 2002, pp. 1401-1405.
    • (2002) Proceedings of the 2002 Winter Simulation Conference , pp. 1401-1405
    • Rose, O.1
  • 21
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russell, R.S., Dar-El, E.M. and Taylor III, B.W., A comparative analysis of the COVERT job sequencing rule using various shop performance measures. Int. J. Prod. Res., 1987, 25(10), 1523-1540.
    • (1987) Int. J. Prod. Res , vol.25 , Issue.10 , pp. 1523-1540
    • Russell, R.S.1    Dar-El, E.M.2    Taylor III, B.W.3
  • 22
    • 0033355662 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data -Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment
    • Shafaei, R. and Brunn, P., Workshop scheduling using practical (inaccurate) data -Part 2: an investigation of the robustness of scheduling rules in a dynamic and stochastic environment. Int. J. Prod. Res., 1999a, 37(18), 4105-4117.
    • (1999) Int. J. Prod. Res , vol.37 , Issue.18 , pp. 4105-4117
    • Shafaei, R.1    Brunn, P.2
  • 23
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data - Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
    • Shafaei, R. and Brunn, P., Workshop scheduling using practical (inaccurate) data - Part 1: the performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach. Int. J. Prod. Res., 1999b, 37(17), 3913-3925.
    • (1999) Int. J. Prod. Res , vol.37 , Issue.17 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2
  • 24
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A.P.J. and Morton, T.E., Priority rules for job shops with weighted tardiness costs. Manage. Sci., 1987, 33(8), 1035-1047.
    • (1987) Manage. Sci , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.