-
1
-
-
2342441450
-
Playing games: Evaluating the impact of lean production strategies on project cost and schedule
-
IGLC-7, 26-28 July held in Berkeley, CA, USA
-
Alarcon, L.F., and Ashley, D.B. (1999). "Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule" Proc. 7th Ann. Conf. Intl. Group for Lean Constr., IGLC-7, 26-28 July held in Berkeley, CA, USA, 263-173.
-
(1999)
Proc. 7th Ann. Conf. Intl. Group for Lean Constr.
, pp. 263-173
-
-
Alarcon, L.F.1
Ashley, D.B.2
-
2
-
-
84866109969
-
Simulation of buffering and batching practices in the interface detailing-fabrication-installation of hvac ductwork
-
IGLC-12, August held in Ellsinore, Denmark
-
Alves, T.C.L. and Tommelein, I.D. (2004). "Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork" Proc. 10th Ann. Conf. Intl. Group for Lean Constr., IGLC-12, August held in Ellsinore, Denmark, 13 pp.
-
(2004)
Proc. 10th Ann. Conf. Intl. Group for Lean Constr.
, pp. 13
-
-
Alves, T.C.L.1
Tommelein, I.D.2
-
3
-
-
0000674566
-
Scheduling projects with repeating activities
-
July/August Issue
-
Harris, R.B., and P. G. Ioannou. (1998). "Scheduling projects with repeating activities" ASCE, J. of Constr. Engrg. and Mgmt., 1998, 269-278, July/August Issue.
-
(1998)
ASCE, J. of Constr. Engrg. and Mgmt., 1998
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
4
-
-
33846656118
-
Simulation of multiple-drift tunnel construction with limited resources
-
eds. M. E. Kuhl, N. M. Steiger, F. B. Armstrong, and J. A. Joines, IEEE, Piscataway, NJ, 1765
-
Ioannou P.G. and V. Likhitruangsilp. (2005). "Simulation of Multiple-Drift Tunnel Construction With Limited Resources", Proc. 2005 Winter Sim. Conf., eds. M. E. Kuhl, N. M. Steiger, F. B. Armstrong, and J. A. Joines, IEEE, Piscataway, NJ, 1765.
-
(2005)
2005 Winter Sim. Conf.
-
-
Ioannou, P.G.1
Likhitruangsilp, V.2
-
5
-
-
46149102275
-
Sequence step algorithm for continuous resource utilization in probabilistic repetitive projects
-
IEEE, Piscataway, New Jersey
-
Ioannou P.G. and C. Srisuwanrat. (2006). "Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects", In Proc. of the 2005 Winter Simulation Conference, IEEE, Piscataway, New Jersey.
-
(2006)
Proc. of the 2005 Winter Simulation Conference
-
-
Ioannou, P.G.1
Srisuwanrat, C.2
-
6
-
-
0032677122
-
General purpose systems for effective construction simulation
-
American Society of Civil Engineers, (125)4, July-August 1999
-
Martinez, J.C. and P.G. Ioannou. (1999). "General Purpose Systems For Effective Construction Simulation," Journal of Construction Engineering and Management, American Society of Civil Engineers, (125)4, July-August 1999.
-
(1999)
Journal of Construction Engineering and Management
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
7
-
-
37249000222
-
A study of the relationship between buffers and performance in construction
-
IGLC-10, August held in Gramado, Brazil
-
Sakamoto, M., Horman, M.J., and Thomas, H.R. (2002). "A Study of the Relationship between Buffers and Performance in Construction" Proc. 10th Ann. Conf. Intl. Group for Lean Constr., IGLC-10, August held in Gramado, Brazil, 13 pp.
-
(2002)
Proc. 10th Ann. Conf. Intl. Group for Lean Constr.
, pp. 13
-
-
Sakamoto, M.1
Horman, M.J.2
Thomas, H.R.3
-
9
-
-
2342444468
-
Parade game: Impact of work flow variability on trade performance
-
IGLC-6, 13-15 August held in Guaruja, Brazil
-
Tommelein, I.D., Riley, D., and Howell, G.A. (1998). "Parade Game: Impact of Work Flow Variability on Trade Performance." Proc. 6th Ann. Conf. Intl. Group for Lean Constr., IGLC-6, 13-15 August held in Guaruja, Brazil, 14 pp.
-
(1998)
Proc. 6th Ann. Conf. Intl. Group for Lean Constr.
, pp. 14
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
|