메뉴 건너뛰기




Volumn , Issue , 2007, Pages 580-589

The investigation of lead-time buffering under uncertainty using simulation and cost optimization

Author keywords

Continuous resource utilization; Genetic algorithm; Idle time; Lead time buffering; Production work flow; Profit maximization; Simulation; STROBOSCOPE; The completed unit algorithm; The sequence step algorithm

Indexed keywords

IDLE TIME; LEADTIME; PRODUCTION WORK; PROFIT MAXIMIZATION; RESOURCE UTILIZATIONS; SIMULATION; STEP ALGORITHMS;

EID: 84858058245     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (9)

References (9)
  • 1
    • 2342441450 scopus 로고    scopus 로고
    • Playing games: Evaluating the impact of lean production strategies on project cost and schedule
    • IGLC-7, 26-28 July held in Berkeley, CA, USA
    • Alarcon, L.F., and Ashley, D.B. (1999). "Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule" Proc. 7th Ann. Conf. Intl. Group for Lean Constr., IGLC-7, 26-28 July held in Berkeley, CA, USA, 263-173.
    • (1999) Proc. 7th Ann. Conf. Intl. Group for Lean Constr. , pp. 263-173
    • Alarcon, L.F.1    Ashley, D.B.2
  • 2
    • 84866109969 scopus 로고    scopus 로고
    • Simulation of buffering and batching practices in the interface detailing-fabrication-installation of hvac ductwork
    • IGLC-12, August held in Ellsinore, Denmark
    • Alves, T.C.L. and Tommelein, I.D. (2004). "Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork" Proc. 10th Ann. Conf. Intl. Group for Lean Constr., IGLC-12, August held in Ellsinore, Denmark, 13 pp.
    • (2004) Proc. 10th Ann. Conf. Intl. Group for Lean Constr. , pp. 13
    • Alves, T.C.L.1    Tommelein, I.D.2
  • 4
    • 33846656118 scopus 로고    scopus 로고
    • Simulation of multiple-drift tunnel construction with limited resources
    • eds. M. E. Kuhl, N. M. Steiger, F. B. Armstrong, and J. A. Joines, IEEE, Piscataway, NJ, 1765
    • Ioannou P.G. and V. Likhitruangsilp. (2005). "Simulation of Multiple-Drift Tunnel Construction With Limited Resources", Proc. 2005 Winter Sim. Conf., eds. M. E. Kuhl, N. M. Steiger, F. B. Armstrong, and J. A. Joines, IEEE, Piscataway, NJ, 1765.
    • (2005) 2005 Winter Sim. Conf.
    • Ioannou, P.G.1    Likhitruangsilp, V.2
  • 5
    • 46149102275 scopus 로고    scopus 로고
    • Sequence step algorithm for continuous resource utilization in probabilistic repetitive projects
    • IEEE, Piscataway, New Jersey
    • Ioannou P.G. and C. Srisuwanrat. (2006). "Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects", In Proc. of the 2005 Winter Simulation Conference, IEEE, Piscataway, New Jersey.
    • (2006) Proc. of the 2005 Winter Simulation Conference
    • Ioannou, P.G.1    Srisuwanrat, C.2
  • 6
    • 0032677122 scopus 로고    scopus 로고
    • General purpose systems for effective construction simulation
    • American Society of Civil Engineers, (125)4, July-August 1999
    • Martinez, J.C. and P.G. Ioannou. (1999). "General Purpose Systems For Effective Construction Simulation," Journal of Construction Engineering and Management, American Society of Civil Engineers, (125)4, July-August 1999.
    • (1999) Journal of Construction Engineering and Management
    • Martinez, J.C.1    Ioannou, P.G.2
  • 7
    • 37249000222 scopus 로고    scopus 로고
    • A study of the relationship between buffers and performance in construction
    • IGLC-10, August held in Gramado, Brazil
    • Sakamoto, M., Horman, M.J., and Thomas, H.R. (2002). "A Study of the Relationship between Buffers and Performance in Construction" Proc. 10th Ann. Conf. Intl. Group for Lean Constr., IGLC-10, August held in Gramado, Brazil, 13 pp.
    • (2002) Proc. 10th Ann. Conf. Intl. Group for Lean Constr. , pp. 13
    • Sakamoto, M.1    Horman, M.J.2    Thomas, H.R.3
  • 9
    • 2342444468 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • IGLC-6, 13-15 August held in Guaruja, Brazil
    • Tommelein, I.D., Riley, D., and Howell, G.A. (1998). "Parade Game: Impact of Work Flow Variability on Trade Performance." Proc. 6th Ann. Conf. Intl. Group for Lean Constr., IGLC-6, 13-15 August held in Guaruja, Brazil, 14 pp.
    • (1998) Proc. 6th Ann. Conf. Intl. Group for Lean Constr. , pp. 14
    • Tommelein, I.D.1    Riley, D.2    Howell, G.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.