Simulation of repetitive-unit construction
-
Ashley, D. B. (1980). " Simulation of repetitive-unit construction.. " J. Constr. Div., 106 (2), 185-194.
-
(1980)
J. Constr. Div.
, vol.106
, Issue.2
, pp. 185-194
-
-
Ashley, D.B.1
-
2
-
-
0019064535
-
Construction planning-Beyond the critical path
-
Birrell, G. S. (1980). " Construction planning-Beyond the critical path.. " J. Constr. Div., 106 (3), 389-407.
-
(1980)
J. Constr. Div.
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.S.1
-
3
-
-
0000981977
-
Planning construction of repetitive building units
-
Carr, R. I., and Meyer, W. L. (1974). " Planning construction of repetitive building units.. " J. Constr. Div., 100 (3), 403-412.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.3
, pp. 403-412
-
-
Carr, R.I.1
Meyer, W.L.2
-
4
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W. T., Chua, D. K. H., and Kannan, C. G. (1996). " Construction resource scheduling with genetic algorithms.. " J. Constr. Eng. Manage., 122 (2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
Kannan, C.G.3
-
5
-
-
0016342705
-
Construction scheduling of linear construction sites
-
Dressler, J. (1974). " Construction scheduling of linear construction sites.. " J. Constr. Div., 100 (4), 571-587.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.4
, pp. 571-587
-
-
Dressler, J.1
-
6
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
El-Rayes, K., and Moselhi, O. (1998). " Resource-driven scheduling of repetitive activities.. " Constr. Manage. Econom., 16, 433-446.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
7
-
-
0036539550
-
An object-oriented model for planning and control of housing construction
-
El-Rayes, K., Ramanathan, R., and Moselhi, O. (2002). " An object-oriented model for planning and control of housing construction.. " Constr. Manage. Econom., 20, 201-210.
-
(2002)
Constr. Manage. Econom.
, vol.20
, pp. 201-210
-
-
El-Rayes, K.1
Ramanathan, R.2
Moselhi, O.3
-
8
-
-
0035391905
-
Linear scheduling model: Float characteristics
-
Harmelink, D. J. (2001). " Linear scheduling model: Float characteristics.. " J. Constr. Eng. Manage., 127 (4), 255-260.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 255-260
-
-
Harmelink, D.J.1
-
9
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
Harmelink, D. J., and Rowings, J. E. (1998). " Linear scheduling model: Development of controlling activity path.. " J. Constr. Eng. Manage., 124 (4), 263-268.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, J.E.2
-
10
-
-
0000674566
-
Scheduling project with repeating activities
-
Harris, R. B., and Ioannou, P. G. (1998). " Scheduling project with repeating activities.. " J. Constr. Eng. Manage., 124 (4), 269-278.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
11
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms.. " J. Constr. Eng. Manage., 125 (3), 167-175.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
12
-
-
16444380299
-
Discussion of algorithm for determining controlling path considering resource continuity
-
Ioannou, P. G., and Harris, R. B. (2003). " Discussion of algorithm for determining controlling path considering resource continuity.. " J. Comput. Civ. Eng., 17 (1), 68-70.
-
(2003)
J. Comput. Civ. Eng.
, vol.17
, Issue.1
, pp. 68-70
-
-
Ioannou, P.G.1
Harris, R.B.2
-
13
-
-
34248586377
-
Discussion of algorithm for determining controlling path considering resource continuity
-
Ioannou, P. G., and Yang, I. T. (2003). " Discussion of algorithm for determining controlling path considering resource continuity.. " J. Comput. Civ. Eng., 17 (1), 70-72.
-
(2003)
J. Comput. Civ. Eng.
, vol.17
, Issue.1
, pp. 70-72
-
-
Ioannou, P.G.1
Yang, I.T.2
-
14
-
-
13944262179
-
Discussion of comparison of linear scheduling model and repetitive scheduling method
-
Ioannou, P. G., and Yang, I. T. (2004). " Discussion of comparison of linear scheduling model and repetitive scheduling method.. " J. Compos. Constr., 8 (3), 461-463.
-
(2004)
J. Compos. Constr.
, vol.8
, Issue.3
, pp. 461-463
-
-
Ioannou, P.G.1
Yang, I.T.2
-
15
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D. W. (1981). " Linear scheduling method for highway construction.. " J. Constr. Div., 107 (2), 247-261.
-
(1981)
J. Constr. Div.
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
16
-
-
34248512689
-
Correspondence of activity relationships and critical path between time-location diagrams and critical path method
-
Kallantzis, A., and Lambropoulos, S. (2003). " Correspondence of activity relationships and critical path between time-location diagrams and critical path method.. " Proc., 16th National Conf., Hellenic Operational Research Society (HELORS), Larissa, Greece, 67-76.
-
(2003)
Proc., 16th National Conf., Hellenic Operational Research Society (HELORS)
, pp. 67-76
-
-
Kallantzis, A.1
Lambropoulos, S.2
-
17
-
-
2542468807
-
Critical path determination by incorporation minimum and maximum time and distance constraints into linear scheduling
-
Kallantzis, A., and Lambropoulos, S. (2004). " Critical path determination by incorporation minimum and maximum time and distance constraints into linear scheduling.. " Eng., Constr., Archit. Manage., 11 (3), 211-222.
-
(2004)
Eng., Constr., Archit. Manage.
, vol.11
, Issue.3
, pp. 211-222
-
-
Kallantzis, A.1
Lambropoulos, S.2
-
18
-
-
84993081857
-
Linear scheduling: Past efforts and future directions
-
Mattila, K. G., and Abraham, D. M. (1998). " Linear scheduling: Past efforts and future directions.. " Eng., Constr., Archit. Manage., 5 (3), 294-303.
-
(1998)
Eng., Constr., Archit. Manage.
, vol.5
, Issue.3
, pp. 294-303
-
-
Mattila, K.G.1
Abraham, D.M.2
-
19
-
-
13944263987
-
Accuracy of highway contractor's schedules
-
Mattila, K. G., and Bowman, M. R. (2004). " Accuracy of highway contractor's schedules.. " J. Constr. Eng. Manage., 130 (5), 647-655.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.5
, pp. 647-655
-
-
Mattila, K.G.1
Bowman, M.R.2
-
20
-
-
13944263588
-
Comparison of linear scheduling model and repetitive scheduling method
-
Mattila, K. G., and Park, A. (2003). " Comparison of linear scheduling model and repetitive scheduling method.. " J. Constr. Eng. Manage., 129 (1), 56-64.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.1
, pp. 56-64
-
-
Mattila, K.G.1
Park, A.2
-
21
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
O'Brien, J. J. (1975). " VPM scheduling for high-rise buildings.. " J. Constr. Div., 101 (4), 895-905.
-
(1975)
J. Constr. Div.
, vol.101
, Issue.4
, pp. 895-905
-
-
O'Brien, J.J.1
-
22
-
-
2142649813
-
Network analysis and construction planning
-
Peer, S. (1974). " Network analysis and construction planning.. " J. Constr. Div., 100 (3), 203-210.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.3
, pp. 203-210
-
-
Peer, S.1
-
23
-
-
0025447970
-
RPM: Repetitive project modeling
-
Reda, R. B. (1990). " RPM: Repetitive project modeling.. " J. Constr. Eng. Manage., 116 (2), 316-330.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.B.1
-
24
-
-
0023984188
-
Extensions to linear schedule optimization
-
Russell, A. D., and Ceselton, W. F. (1988). " Extensions to linear schedule optimization.. " J. Constr. Eng. Manage., 114 (4), 36-52.
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.4
, pp. 36-52
-
-
Russell, A.D.1
Ceselton, W.F.2
-
25
-
-
0027607475
-
New generation of planning structures
-
Russell, A. D., and Wong, W. C. M. (1993). " New generation of planning structures.. " J. Constr. Eng. Manage., 119 (2), 196-214.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
26
-
-
0019030431
-
Construction planning for linear projects
-
Selinger, S. (1980). " Construction planning for linear projects.. " J. Constr. Div., 106 (2), 195-205.
-
(1980)
J. Constr. Div.
, vol.106
, Issue.2
, pp. 195-205
-
-
Selinger, S.1
-
27
-
-
0020178299
-
Time space scheduling method
-
Stradal, O., and Cacha, J. (1982). " Time space scheduling method.. " J. Constr. Div., 108 (3), 445-457.
-
(1982)
J. Constr. Div.
, vol.108
, Issue.3
, pp. 445-457
-
-
Stradal, O.1
Cacha, J.2
-
28
-
-
0002872941
-
Linear scheduling and visualization
-
Vorster, M. C., Beliveau, Y. J., and Bafna, T. (1992). " Linear scheduling and visualization.. " Transp. Res. Rec., 1351, 32-39.
-
(1992)
Transp. Res. Rec.
, vol.1351
, pp. 32-39
-
-
Vorster, M.C.1
Beliveau, Y.J.2
Bafna, T.3
-
30
-
-
34248549089
-
Stochastic analysis on project duration under the requirement of continuous resource utilization
-
Yang, I. T. (2002b). " Stochastic analysis on project duration under the requirement of continuous resource utilization.. " Proc., 10th Int. Conf. Group for Lean Construction, Gramado, Brazil, 527-540.
-
(2002)
Proc., 10th Int. Conf. Group for Lean Construction
, pp. 527-540
-
-
Yang, I.T.1
-
31
-
-
4043118882
-
Resource-driven scheduling for repetitive projects: A pull-system approach
-
Yang, I. T., and Ioannou, P. G. (2001). " Resource-driven scheduling for repetitive projects: A pull-system approach.. " Proc., 9th Int. Conf. Group for Lean Construction, Singapore, 365-377.
-
(2001)
Proc., 9th Int. Conf. Group for Lean Construction
, pp. 365-377
-
-
Yang, I.T.1
Ioannou, P.G.2
-
32
-
-
4043093611
-
Scheduling with focus on practical concerns in repetitive projects
-
Yang, I. T., and Ioannou, P. G. (2004). " Scheduling with focus on practical concerns in repetitive projects.. " Constr. Manage. Econom., 22, 619-630.
-
(2004)
Constr. Manage. Econom.
, vol.22
, pp. 619-630
-
-
Yang, I.T.1
Ioannou, P.G.2
|