메뉴 건너뛰기




Volumn 129, Issue 3, 2003, Pages 330-332

Implications of even flow production methodology for U.S. housing industry

Author keywords

Buildings, residential; Construction management; Project management

Indexed keywords

BUILDINGS, RESIDENTIAL; CONSTRUCTION MANAGEMENT; EVEN FLOW STRATEGY; PRODUCTION EFFICIENCY;

EID: 1642563359     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2003)129:3(330)     Document Type: Article
Times cited : (46)

References (19)
  • 1
    • 0032104987 scopus 로고    scopus 로고
    • A framework for applying simulation in the construction industry
    • AbouRizk, S. M., and Hajjar, D. (1998). "A framework for applying simulation in the construction industry." Can. J. Civ. Eng., 25(3), 604-617.
    • (1998) Can. J. Civ. Eng. , vol.25 , Issue.3 , pp. 604-617
    • AbouRizk, S.M.1    Hajjar, D.2
  • 2
    • 0033351012 scopus 로고    scopus 로고
    • Special purpose simulation template for utility tunnel construction
    • Institute of Electrical and Electronics Engineers, Piscataway, N.J.
    • AbouRizk, S. M., Ruwanpura, J. Y., Er, K. C., and Fernando, S. (1999). "Special purpose simulation template for utility tunnel construction." Proc., Winter Simulation Conf., Institute of Electrical and Electronics Engineers, Piscataway, N.J., 948-955.
    • (1999) Proc., Winter Simulation Conf. , pp. 948-955
    • AbouRizk, S.M.1    Ruwanpura, J.Y.2    Er, K.C.3    Fernando, S.4
  • 3
    • 13944283035 scopus 로고    scopus 로고
    • Even flow construction
    • Caldeira, E. (1999). "Even flow construction." Professional Builder, 64(16), 40.
    • (1999) Professional Builder , vol.64 , Issue.16 , pp. 40
    • Caldeira, E.1
  • 5
    • 0004244246 scopus 로고
    • revised, North River, Great Barrington, Mass.
    • Goldratt, E. (1992). The goal, 2nd Ed., revised, North River, Great Barrington, Mass.
    • (1992) The Goal, 2nd Ed.
    • Goldratt, E.1
  • 6
    • 0033315084 scopus 로고    scopus 로고
    • Simphony: An environment for building special purpose construction simulation tools
    • Institute of Electrical and Electronics Engineers, Piscataway, N.J.
    • Hajjar, D., and AbouRizk, S. M. (1999). "Simphony: An environment for building special purpose construction simulation tools." Proc., Winter Simulation Conf., Institute of Electrical and Electronics Engineers, Piscataway, N.J.
    • (1999) Proc., Winter Simulation Conf.
    • Hajjar, D.1    Abourizk, S.M.2
  • 8
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • Harmelink, D. J., and Rowings, J. E. (1998). "Linear scheduling model: Development of controlling activity path." J. Constr. Eng. Manage., 124(4), 263-268.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1    Rowings, J.E.2
  • 9
    • 0001247217 scopus 로고    scopus 로고
    • What is lean construction?
    • International Group for Lean Construction, Univ. of California, Berkeley, Calif.
    • Howell, G. A. (1999). "What is lean construction?" Proc., 7th Annual Conf., International Group for Lean Construction, Univ. of California, Berkeley, Calif., 1-10.
    • (1999) Proc., 7th Annual Conf. , pp. 1-10
    • Howell, G.A.1
  • 10
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • Johnston, D. W. (1981). "Linear scheduling method for highway construction." J. Constr. Div., Am. Soc. Civ. Eng., 107(2), 247-261.
    • (1981) J. Constr. Div., Am. Soc. Civ. Eng. , vol.107 , Issue.2 , pp. 247-261
    • Johnston, D.W.1
  • 11
    • 13944249615 scopus 로고    scopus 로고
    • MS thesis, Arizona State Univ., Tempe, Ariz
    • Joines, J. (1999). "Work flow variability." MS thesis, Arizona State Univ., Tempe, Ariz.
    • (1999) Work Flow Variability
    • Joines, J.1
  • 12
    • 13944264028 scopus 로고    scopus 로고
    • Alliance lean design/construct on a small high-tech project
    • International Group for Lean Construction, Univ. of California, Berkeley, Calif.
    • Miles, R. S. (1998). "Alliance lean design/construct on a small high-tech project." Proc., 6th Annual Conf., International Group for Lean Construction, Univ. of California, Berkeley, Calif., 1-27.
    • (1998) Proc., 6th Annual Conf. , pp. 1-27
    • Miles, R.S.1
  • 13
    • 13944273831 scopus 로고    scopus 로고
    • Even flow construction: The wave of the future
    • National Association of Home Builders Research Center (NAHBRC). (2000). "Even flow construction: The wave of the future." Toolbase News, 5(1), 4.
    • (2000) Toolbase News , vol.5 , Issue.1 , pp. 4
  • 15
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe spool installation: Simulation of lean construction techniques
    • Tommelein, I. D. (1998). "Pull-driven scheduling for pipe spool installation: Simulation of lean construction techniques." J. Comput. Civ. Eng., 124(4), 279-288.
    • (1998) J. Comput. Civ. Eng. , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 16
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D., and Howell, G. A. (1999). "Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.2    Howell, G.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.