Simulation-based decision support system for economical supply chain management of rebar

Author keywords

Construction materials; Decision support systems; Simulation models; Turkey

Indexed keywords

REBAR; SHIPMENTS; SIMULATION MODELS; SUPPLY CHAIN MANAGEMENT; TURKEY;

EID: 33845809157     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:1(29)     Document Type: Article
Times cited : (34)

References (47)
  • 2
    • 0026913088 scopus 로고
    • Statistical properties of construction duration data
    • AbouRizk, S. M., and Halpin, D. W. (1992). " Statistical properties of construction duration data.. " J. Constr. Eng. Manage., 118 (3), 525-544.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 525-544
    • Abourizk, S.M.1    Halpin, D.W.2
  • 3
    • 0001009963 scopus 로고
    • Just in time application and implementation for building materials management
    • Akintoye, A. (1995). " Just in time application and implementation for building materials management.. " Constr. Manage. Econom., 13, 105-113.
    • (1995) Constr. Manage. Econom. , vol.13 , pp. 105-113
    • Akintoye, A.1
  • 5
    • 33845779315 scopus 로고    scopus 로고
    • Simulation of buffering and batching practices in the interface detailing-fabrication-installation of HVAC ductwork
    • Alves, T. C. L., and Tommelein, I. D. (2004). " Simulation of buffering and batching practices in the interface detailing-fabrication- installation of HVAC ductwork.. " 12th Annual Conf. on Lean Construction, Denmark.
    • (2004) 12th Annual Conf. on Lean Construction
    • Alves, T.C.L.1    Tommelein, I.D.2
  • 6
    • 0031147439 scopus 로고    scopus 로고
    • Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
    • Anwar, M. F., and Nagi, R. (1997). " Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups.. " Int. J. Prod. Res., 35 (5), 1447-1470.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.5 , pp. 1447-1470
    • Anwar, M.F.1    Nagi, R.2
  • 8
    • 1642563373 scopus 로고    scopus 로고
    • Toward construction JIT
    • L.Alarcon, ed., Balkema, Rotterdam, The Netherlands.
    • Ballard, G., and Howell, G. (1997). " Toward construction JIT.. " Lean construction, L. Alarcon, ed., Balkema, Rotterdam, The Netherlands.
    • (1997) Lean Construction
    • Ballard, G.1    Howell, G.2
  • 9
    • 0030406151 scopus 로고    scopus 로고
    • Construction waste: Quantification and source evaluation
    • Bossink, B. A. G., and Brouwers, H. J. H. (1996). " Construction waste: Quantification and source evaluation.. " J. Constr. Eng. Manage., 122 (1), 55-60.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 55-60
    • Bossink, B.A.G.1    Brouwers, H.J.H.2
  • 12
    • 1842699306 scopus 로고    scopus 로고
    • Material waste in building industry: Main causes and prevention
    • Formoso, C. T., Soibelman, L., De Cesare, C., and Isatto, E. L. (2002). " Material waste in building industry: Main causes and prevention.. " J. Constr. Eng. Manage., 128 (4), 316-325.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 316-325
    • Formoso, C.T.1    Soibelman, L.2    De Cesare, C.3    Isatto, E.L.4
  • 13
    • 0004253213 scopus 로고    scopus 로고
    • 2nd Ed., McGraw-Hill Int. Edition, Boston.
    • Hopp, W. J., and Spearman, M. L. (2000). Factory physics, 2nd Ed., McGraw-Hill Int. Edition, Boston.
    • (2000) Factory Physics
    • Hopp, W.J.1    Spearman, M.L.2
  • 15
    • 33845801201 scopus 로고    scopus 로고
    • Modeling the effects of lean capacity strategies on project performance
    • Horman, M. J. (2001). " Modeling the effects of lean capacity strategies on project performance.. " Proc., 9th Annual Conf. on Lean Construction, Singapore.
    • (2001) Proc., 9th Annual Conf. on Lean Construction
    • Horman, M.J.1
  • 16
    • 13944271969 scopus 로고    scopus 로고
    • Process dynamics: Identifying a strategy for the deployment of buffers in building logistics
    • Horman, M. J., and Kenley, R. (1998). " Process dynamics: Identifying a strategy for the deployment of buffers in building logistics.. " International Journal of Logistics: Research and Applications, 1 (3), 221-237.
    • (1998) International Journal of Logistics: Research and Applications , vol.1 , Issue.3 , pp. 221-237
    • Horman, M.J.1    Kenley, R.2
  • 18
    • 23044488934 scopus 로고    scopus 로고
    • Role of inventory buffers in construction labor performance
    • Horman, M. J., and Thomas, H. R. (2005). " Role of inventory buffers in construction labor performance.. " J. Constr. Eng. Manage., 131 (7), 834-843.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.7 , pp. 834-843
    • Horman, M.J.1    Thomas, H.R.2
  • 20
    • 0012303148 scopus 로고    scopus 로고
    • RR47-13, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Howell, G. A., and Ballard, G. (1996). " Managing uncertainty in the piping process.. " RR47-13, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (1996) Managing Uncertainty in the Piping Process
    • Howell, G.A.1    Ballard, G.2
  • 23
    • 38949086008 scopus 로고    scopus 로고
    • Lean Enterprise Institute. (The Lean Enterprise Institute, Brookline, Mass.
    • Lean Enterprise Institute. (2003). Lean Lexicon: A graphical glossary for lean thinkers, Version 1.0, The Lean Enterprise Institute, Brookline, Mass.
    • (2003) Lean Lexicon: A Graphical Glossary for Lean Thinkers
  • 26
    • 25844489404 scopus 로고
    • Repo, reverse repo and securities lending markets in Canada
    • Morrow, R. (1995). " Repo, reverse repo and securities lending markets in Canada.. " Bank of Canada Review, 75 (14), 61-70.
    • (1995) Bank of Canada Review , vol.75 , Issue.14 , pp. 61-70
    • Morrow, R.1
  • 28
    • 13944281790 scopus 로고    scopus 로고
    • Reliability buffering for construction projects
    • Park, M., and Pea-Mora, F. (2004). " Reliability buffering for construction projects.. " J. Constr. Eng. Manage., 130 (5), 626-637.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.5 , pp. 626-637
    • Park, M.1    Pea-Mora, F.2
  • 30
    • 0035509405 scopus 로고    scopus 로고
    • Just-in-time management of precast concrete components
    • Pheng, L. S., and Chuan, C. J. (2001). " Just-in-time management of precast concrete components.. " J. Constr. Eng. Manage., 127 (6), 494-501.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 494-501
    • Pheng, L.S.1    Chuan, C.J.2
  • 31
    • 0000118103 scopus 로고    scopus 로고
    • The application of jit philosophy to construction: A case study in site layout
    • Pheng, L. S., and Hui, M. S. (1999). " The application of jit philosophy to construction: A case study in site layout.. " Constr. Manage. Econom., 17 (5), 657-668.
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.5 , pp. 657-668
    • Pheng, L.S.1    Hui, M.S.2
  • 32
    • 12344260289 scopus 로고    scopus 로고
    • How just-in-time' wastages can be quantified: Case study of a private condominium project
    • Pheng, L. S., and Tan, S. K. L. (1998). " How just-in-time' wastages can be quantified: Case study of a private condominium project.. " Constr. Manage. Econom., 16 (6), 621-635.
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.6 , pp. 621-635
    • Pheng, L.S.1    Tan, S.K.L.2
  • 34
    • 25844432723 scopus 로고    scopus 로고
    • Supply chain management in construction: Problem analysis of current supply chain configurations for engineered-to-order products
    • Polat, G. (2003). " Supply chain management in construction: Problem analysis of current supply chain configurations for engineered-to-order products.. " Proc., ISEC'2003, Orlando, Fla.
    • (2003) Proc., ISEC'2003
    • Polat, G.1
  • 35
    • 25844521253 scopus 로고    scopus 로고
    • The JIT materials management system in developing countries
    • Polat, G., and Arditi, D. (2005). " The JIT materials management system in developing countries.. " Constr. Manage. Econom., 23 (7), 697-712.
    • (2005) Constr. Manage. Econom. , vol.23 , Issue.7 , pp. 697-712
    • Polat, G.1    Arditi, D.2
  • 36
    • 25844510550 scopus 로고    scopus 로고
    • Construction supply chains: Turkish supply chain configurations for cut and bent rebar
    • Polat, G., and Ballard, G. (2003). " Construction supply chains: Turkish supply chain configurations for cut and bent rebar.. " Proc., 11th Annual Conf. on Lean Construction, Blacksburg, Va.
    • (2003) Proc., 11th Annual Conf. on Lean Construction
    • Polat, G.1    Ballard, G.2
  • 38
    • 33845747118 scopus 로고    scopus 로고
    • The project manager's role as defender of contingency time: A new strategy and methodology to minimize the effects of risk
    • Powell, R. A., and Pierce, K. R. (1999). " The project manager's role as defender of contingency time: A new strategy and methodology to minimize the effects of risk.. " Proc., 30th Annual Project Management Institute Seminars and Symp.
    • (1999) Proc., 30th Annual Project Management Institute Seminars and Symp
    • Powell, R.A.1    Pierce, K.R.2
  • 39
    • 0029309051 scopus 로고
    • Creating flexible simulation models
    • Schelasin, R., and Mauer, J. (1995). " Creating flexible simulation models.. " IIE Solutions, 1 (1), 50-55.
    • (1995) IIE Solutions , vol.1 , Issue.1 , pp. 50-55
    • Schelasin, R.1    Mauer, J.2
  • 40
    • 25844519455 scopus 로고    scopus 로고
    • JIT and the complementarity of buffers and lot size
    • Shmanske, S. (2003). " JIT and the complementarity of buffers and lot size.. " American Business Review, 21 (1), 100-106.
    • (2003) American Business Review , vol.21 , Issue.1 , pp. 100-106
    • Shmanske, S.1
  • 41
    • 16244369857 scopus 로고    scopus 로고
    • Simulation modeling for logistics re-engineering in the construction company
    • Sobotka, A. (2000). " Simulation modeling for logistics re-engineering in the construction company.. " Constr. Manage. Econom., 18 (2), 183-195.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.2 , pp. 183-195
    • Sobotka, A.1
  • 42
    • 0002372299 scopus 로고    scopus 로고
    • Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
    • Tommelein, I., and Li, A. E. Y. (1999). " Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration.. " Proc., 7th Annual Conf. on Lean Construction, Berkeley, Calif.
    • (1999) Proc., 7th Annual Conf. on Lean Construction
    • Tommelein, I.1    Li, A.E.Y.2
  • 43
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
    • Tommelein, I. D. (1998). " Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique.. " J. Constr. Eng. Manage., 124 (4), 279-288.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 44
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact on work flow variability on trade performance
    • Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). " Parade game: Impact on work flow variability on trade performance.. " J. Constr. Eng. Manage., 125 (5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3
  • 45
    • 33748771924 scopus 로고    scopus 로고
    • More just-in-time: Location of buffers in structural steel supply and construction processes
    • Tommelein, I. D., and Weissenberger, M. (1999). " More just-in-time: Location of buffers in structural steel supply and construction processes.. " Proc., 7th Annual Conf. on Lean Construction, Berkeley, Calif.
    • (1999) Proc., 7th Annual Conf. on Lean Construction
    • Tommelein, I.D.1    Weissenberger, M.2
  • 46
    • 33845766598 scopus 로고    scopus 로고
    • Stochastic analysis on project duration under the requirement of continuous resource utilization
    • Yang, I. (2002). " Stochastic analysis on project duration under the requirement of continuous resource utilization.. " Proc., 10th Annual Conf. on Lean Construction, Gramado, Brazil.
    • (2002) Proc., 10th Annual Conf. on Lean Construction
    • Yang, I.1
  • 47
    • 4043118882 scopus 로고    scopus 로고
    • Resource-driven scheduling for repetitive projects: A pull-system approach
    • Yang, I., and Photios, G. (2001). " Resource-driven scheduling for repetitive projects: A pull-system approach.. " Proc., 9th Annual Conf. on Lean Construction, Singapore.
    • (2001) Proc., 9th Annual Conf. on Lean Construction
    • Yang, I.1    Photios, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.