-
2
-
-
0026913088
-
Statistical properties of construction duration data
-
AbouRizk, S. M., and Halpin, D. W. (1992). " Statistical properties of construction duration data.. " J. Constr. Eng. Manage., 118 (3), 525-544.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.3
, pp. 525-544
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
3
-
-
0001009963
-
Just in time application and implementation for building materials management
-
Akintoye, A. (1995). " Just in time application and implementation for building materials management.. " Constr. Manage. Econom., 13, 105-113.
-
(1995)
Constr. Manage. Econom.
, vol.13
, pp. 105-113
-
-
Akintoye, A.1
-
5
-
-
33845779315
-
Simulation of buffering and batching practices in the interface detailing-fabrication-installation of HVAC ductwork
-
Alves, T. C. L., and Tommelein, I. D. (2004). " Simulation of buffering and batching practices in the interface detailing-fabrication- installation of HVAC ductwork.. " 12th Annual Conf. on Lean Construction, Denmark.
-
(2004)
12th Annual Conf. on Lean Construction
-
-
Alves, T.C.L.1
Tommelein, I.D.2
-
6
-
-
0031147439
-
Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
-
Anwar, M. F., and Nagi, R. (1997). " Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups.. " Int. J. Prod. Res., 35 (5), 1447-1470.
-
(1997)
Int. J. Prod. Res.
, vol.35
, Issue.5
, pp. 1447-1470
-
-
Anwar, M.F.1
Nagi, R.2
-
8
-
-
1642563373
-
Toward construction JIT
-
L.Alarcon, ed., Balkema, Rotterdam, The Netherlands.
-
Ballard, G., and Howell, G. (1997). " Toward construction JIT.. " Lean construction, L. Alarcon, ed., Balkema, Rotterdam, The Netherlands.
-
(1997)
Lean Construction
-
-
Ballard, G.1
Howell, G.2
-
9
-
-
0030406151
-
Construction waste: Quantification and source evaluation
-
Bossink, B. A. G., and Brouwers, H. J. H. (1996). " Construction waste: Quantification and source evaluation.. " J. Constr. Eng. Manage., 122 (1), 55-60.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 55-60
-
-
Bossink, B.A.G.1
Brouwers, H.J.H.2
-
10
-
-
0003879360
-
-
2nd Ed., Wiley, New York.
-
Chase, W., and Brown, F. (1992). General statistics, 2nd Ed., Wiley, New York.
-
(1992)
General Statistics
-
-
Chase, W.1
Brown, F.2
-
12
-
-
1842699306
-
Material waste in building industry: Main causes and prevention
-
Formoso, C. T., Soibelman, L., De Cesare, C., and Isatto, E. L. (2002). " Material waste in building industry: Main causes and prevention.. " J. Constr. Eng. Manage., 128 (4), 316-325.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.4
, pp. 316-325
-
-
Formoso, C.T.1
Soibelman, L.2
De Cesare, C.3
Isatto, E.L.4
-
13
-
-
0004253213
-
-
2nd Ed., McGraw-Hill Int. Edition, Boston.
-
Hopp, W. J., and Spearman, M. L. (2000). Factory physics, 2nd Ed., McGraw-Hill Int. Edition, Boston.
-
(2000)
Factory Physics
-
-
Hopp, W.J.1
Spearman, M.L.2
-
15
-
-
33845801201
-
Modeling the effects of lean capacity strategies on project performance
-
Horman, M. J. (2001). " Modeling the effects of lean capacity strategies on project performance.. " Proc., 9th Annual Conf. on Lean Construction, Singapore.
-
(2001)
Proc., 9th Annual Conf. on Lean Construction
-
-
Horman, M.J.1
-
16
-
-
13944271969
-
Process dynamics: Identifying a strategy for the deployment of buffers in building logistics
-
Horman, M. J., and Kenley, R. (1998). " Process dynamics: Identifying a strategy for the deployment of buffers in building logistics.. " International Journal of Logistics: Research and Applications, 1 (3), 221-237.
-
(1998)
International Journal of Logistics: Research and Applications
, vol.1
, Issue.3
, pp. 221-237
-
-
Horman, M.J.1
Kenley, R.2
-
17
-
-
33845736787
-
Using buffers to manage production: A case study of the Pentagon renovation project
-
Horman, M. J., Messner, J. I., Riley, D. R., and Pulaski, M. H. (2003). " Using buffers to manage production: A case study of the Pentagon renovation project.. " Proc. 11th Annual Conf. on Lean Construction, Blacksburg, Va.
-
(2003)
Proc. 11th Annual Conf. on Lean Construction
-
-
Horman, M.J.1
Messner, J.I.2
Riley, D.R.3
Pulaski, M.H.4
-
18
-
-
23044488934
-
Role of inventory buffers in construction labor performance
-
Horman, M. J., and Thomas, H. R. (2005). " Role of inventory buffers in construction labor performance.. " J. Constr. Eng. Manage., 131 (7), 834-843.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.7
, pp. 834-843
-
-
Horman, M.J.1
Thomas, H.R.2
-
20
-
-
0012303148
-
-
RR47-13, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
Howell, G. A., and Ballard, G. (1996). " Managing uncertainty in the piping process.. " RR47-13, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
(1996)
Managing Uncertainty in the Piping Process
-
-
Howell, G.A.1
Ballard, G.2
-
22
-
-
0004312378
-
-
3rd Ed., McGraw-Hill, Boston.
-
Law, A., and Kelton, W. D. (2000). Simulation modeling and analysis, 3rd Ed., McGraw-Hill, Boston.
-
(2000)
Simulation Modeling and Analysis
-
-
Law, A.1
Kelton, W.D.2
-
23
-
-
38949086008
-
-
Lean Enterprise Institute. (The Lean Enterprise Institute, Brookline, Mass.
-
Lean Enterprise Institute. (2003). Lean Lexicon: A graphical glossary for lean thinkers, Version 1.0, The Lean Enterprise Institute, Brookline, Mass.
-
(2003)
Lean Lexicon: A Graphical Glossary for Lean Thinkers
-
-
-
24
-
-
33845748052
-
-
Minneapolis, ASCE, Va.
-
Martinez, J. C., and Ioannou, P. G. (1997). State-based probabilistic scheduling using STROBOSCOPE's CPM add-on, Construction Congress V, Minneapolis, ASCE, Va.
-
(1997)
State-based Probabilistic Scheduling Using STROBOSCOPE's CPM Add-on, Construction Congress v
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
26
-
-
25844489404
-
Repo, reverse repo and securities lending markets in Canada
-
Morrow, R. (1995). " Repo, reverse repo and securities lending markets in Canada.. " Bank of Canada Review, 75 (14), 61-70.
-
(1995)
Bank of Canada Review
, vol.75
, Issue.14
, pp. 61-70
-
-
Morrow, R.1
-
28
-
-
13944281790
-
Reliability buffering for construction projects
-
Park, M., and Pea-Mora, F. (2004). " Reliability buffering for construction projects.. " J. Constr. Eng. Manage., 130 (5), 626-637.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.5
, pp. 626-637
-
-
Park, M.1
Pea-Mora, F.2
-
29
-
-
0038213619
-
-
Ashgate, Brookfield, Vt.
-
Pheng, L. S., and Chan, Y. M. (1997). Managing productivity in construction: JIT operations and Measurements, Ashgate, Brookfield, Vt.
-
(1997)
Managing Productivity in Construction: JIT Operations and Measurements
-
-
Pheng, L.S.1
Chan, Y.M.2
-
30
-
-
0035509405
-
Just-in-time management of precast concrete components
-
Pheng, L. S., and Chuan, C. J. (2001). " Just-in-time management of precast concrete components.. " J. Constr. Eng. Manage., 127 (6), 494-501.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 494-501
-
-
Pheng, L.S.1
Chuan, C.J.2
-
31
-
-
0000118103
-
The application of jit philosophy to construction: A case study in site layout
-
Pheng, L. S., and Hui, M. S. (1999). " The application of jit philosophy to construction: A case study in site layout.. " Constr. Manage. Econom., 17 (5), 657-668.
-
(1999)
Constr. Manage. Econom.
, vol.17
, Issue.5
, pp. 657-668
-
-
Pheng, L.S.1
Hui, M.S.2
-
32
-
-
12344260289
-
How just-in-time' wastages can be quantified: Case study of a private condominium project
-
Pheng, L. S., and Tan, S. K. L. (1998). " How just-in-time' wastages can be quantified: Case study of a private condominium project.. " Constr. Manage. Econom., 16 (6), 621-635.
-
(1998)
Constr. Manage. Econom.
, vol.16
, Issue.6
, pp. 621-635
-
-
Pheng, L.S.1
Tan, S.K.L.2
-
34
-
-
25844432723
-
Supply chain management in construction: Problem analysis of current supply chain configurations for engineered-to-order products
-
Polat, G. (2003). " Supply chain management in construction: Problem analysis of current supply chain configurations for engineered-to-order products.. " Proc., ISEC'2003, Orlando, Fla.
-
(2003)
Proc., ISEC'2003
-
-
Polat, G.1
-
35
-
-
25844521253
-
The JIT materials management system in developing countries
-
Polat, G., and Arditi, D. (2005). " The JIT materials management system in developing countries.. " Constr. Manage. Econom., 23 (7), 697-712.
-
(2005)
Constr. Manage. Econom.
, vol.23
, Issue.7
, pp. 697-712
-
-
Polat, G.1
Arditi, D.2
-
36
-
-
25844510550
-
Construction supply chains: Turkish supply chain configurations for cut and bent rebar
-
Polat, G., and Ballard, G. (2003). " Construction supply chains: Turkish supply chain configurations for cut and bent rebar.. " Proc., 11th Annual Conf. on Lean Construction, Blacksburg, Va.
-
(2003)
Proc., 11th Annual Conf. on Lean Construction
-
-
Polat, G.1
Ballard, G.2
-
38
-
-
33845747118
-
The project manager's role as defender of contingency time: A new strategy and methodology to minimize the effects of risk
-
Powell, R. A., and Pierce, K. R. (1999). " The project manager's role as defender of contingency time: A new strategy and methodology to minimize the effects of risk.. " Proc., 30th Annual Project Management Institute Seminars and Symp.
-
(1999)
Proc., 30th Annual Project Management Institute Seminars and Symp
-
-
Powell, R.A.1
Pierce, K.R.2
-
39
-
-
0029309051
-
Creating flexible simulation models
-
Schelasin, R., and Mauer, J. (1995). " Creating flexible simulation models.. " IIE Solutions, 1 (1), 50-55.
-
(1995)
IIE Solutions
, vol.1
, Issue.1
, pp. 50-55
-
-
Schelasin, R.1
Mauer, J.2
-
40
-
-
25844519455
-
JIT and the complementarity of buffers and lot size
-
Shmanske, S. (2003). " JIT and the complementarity of buffers and lot size.. " American Business Review, 21 (1), 100-106.
-
(2003)
American Business Review
, vol.21
, Issue.1
, pp. 100-106
-
-
Shmanske, S.1
-
41
-
-
16244369857
-
Simulation modeling for logistics re-engineering in the construction company
-
Sobotka, A. (2000). " Simulation modeling for logistics re-engineering in the construction company.. " Constr. Manage. Econom., 18 (2), 183-195.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.2
, pp. 183-195
-
-
Sobotka, A.1
-
42
-
-
0002372299
-
Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
-
Tommelein, I., and Li, A. E. Y. (1999). " Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration.. " Proc., 7th Annual Conf. on Lean Construction, Berkeley, Calif.
-
(1999)
Proc., 7th Annual Conf. on Lean Construction
-
-
Tommelein, I.1
Li, A.E.Y.2
-
43
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998). " Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique.. " J. Constr. Eng. Manage., 124 (4), 279-288.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
44
-
-
0032645520
-
Parade game: Impact on work flow variability on trade performance
-
Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). " Parade game: Impact on work flow variability on trade performance.. " J. Constr. Eng. Manage., 125 (5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
-
45
-
-
33748771924
-
More just-in-time: Location of buffers in structural steel supply and construction processes
-
Tommelein, I. D., and Weissenberger, M. (1999). " More just-in-time: Location of buffers in structural steel supply and construction processes.. " Proc., 7th Annual Conf. on Lean Construction, Berkeley, Calif.
-
(1999)
Proc., 7th Annual Conf. on Lean Construction
-
-
Tommelein, I.D.1
Weissenberger, M.2
-
46
-
-
33845766598
-
Stochastic analysis on project duration under the requirement of continuous resource utilization
-
Yang, I. (2002). " Stochastic analysis on project duration under the requirement of continuous resource utilization.. " Proc., 10th Annual Conf. on Lean Construction, Gramado, Brazil.
-
(2002)
Proc., 10th Annual Conf. on Lean Construction
-
-
Yang, I.1
-
47
-
-
4043118882
-
Resource-driven scheduling for repetitive projects: A pull-system approach
-
Yang, I., and Photios, G. (2001). " Resource-driven scheduling for repetitive projects: A pull-system approach.. " Proc., 9th Annual Conf. on Lean Construction, Singapore.
-
(2001)
Proc., 9th Annual Conf. on Lean Construction
-
-
Yang, I.1
Photios, G.2
|