메뉴 건너뛰기




Volumn 3, Issue 3, 2008, Pages 277-297

Due date assignment using ADRES and simulated annealing

Author keywords

DDA; Due Date Assignment; Flowtime estimation; SA; Simulated Annealing

Indexed keywords

QUALITY FUNCTION DEPLOYMENT; SIMULATED ANNEALING; STATISTICAL METHODS; SYSTEMS ENGINEERING;

EID: 40749129898     PISSN: 17485037     EISSN: 17485045     Source Type: Journal    
DOI: 10.1504/IJISE.2008.017421     Document Type: Article
Times cited : (6)

References (32)
  • 2
    • 0003067640 scopus 로고
    • An investigation of due date assignment rules with constrained tightness
    • Baker, K.R. and Bertrand, J.M.W. (1981) 'An investigation of due date assignment rules with constrained tightness', Operation Management Vol. 1, No. 3, pp.109-120.
    • (1981) Operation Management , vol.1 , Issue.3 , pp. 109-120
    • Baker, K.R.1    Bertrand, J.M.W.2
  • 3
    • 0002009274 scopus 로고
    • A dynamic priority rule for sequencing against due dates
    • Baker, K.R. and Bertrand, J.M.W. (1982) 'A dynamic priority rule for sequencing against due dates', Operation Management, Vol. 3, No. 1, pp.37-42.
    • (1982) Operation Management , vol.3 , Issue.1 , pp. 37-42
    • Baker, K.R.1    Bertrand, J.M.W.2
  • 4
    • 0035546638 scopus 로고    scopus 로고
    • A simulated annealing algorithm for dynamic layout problem
    • Baykasoǧlu, A. and Gindy, N.N.Z. (2001) 'A simulated annealing algorithm for dynamic layout problem', Computers and Operations Research, Vol. 28, No. 14, pp.1403-1426.
    • (2001) Computers and Operations Research , vol.28 , Issue.14 , pp. 1403-1426
    • Baykasoǧlu, A.1    Gindy, N.N.Z.2
  • 6
    • 40749084982 scopus 로고    scopus 로고
    • Baykasoǧlu, A. and Özbakir, L. (2004) 'Yapay sinir aǧlarι ile teslim tarihi belirleme', (in Turkish) YA/EM'2004: Yöneylem Araştιrmasι/ Endüstri Mühendisliǧi Kongresi XXIV, Ulusal Kongresi, 15-18 Haziran 2004, Gaziantep, Adana, pp.470-472.
    • Baykasoǧlu, A. and Özbakir, L. (2004) 'Yapay sinir aǧlarι ile teslim tarihi belirleme', (in Turkish) YA/EM'2004: Yöneylem Araştιrmasι/ Endüstri Mühendisliǧi Kongresi XXIV, Ulusal Kongresi, 15-18 Haziran 2004, Gaziantep, Adana, pp.470-472.
  • 7
    • 40749120644 scopus 로고    scopus 로고
    • Atölye tipi üretimde akιş süresi tahmini ve teslim tarihi belirlenmesi için yeni bir yaklaşιm
    • in Turkish, 26-28 April, Şanlιurfa, Turkey
    • Baykasoǧlu, A., Göçken, M. and Unutmaz, Z.D. (2006) 'Atölye tipi üretimde akιş süresi tahmini ve teslim tarihi belirlenmesi için yeni bir yaklaşιm', (in Turkish) GAP V. Mühendislik Kongresi, pp.163-171, 26-28 April 2006, Şanlιurfa, Turkey.
    • (2006) GAP V. Mühendislik Kongresi , pp. 163-171
    • Baykasoǧlu, A.1    Göçken, M.2    Unutmaz, Z.D.3
  • 9
    • 33244480840 scopus 로고    scopus 로고
    • A tabu search based linguistic optimization approach to due date determination in earliness-tardiness flexible job shop scheduling
    • Baykasoǧlu, A., Özbakir, L. and Sönmez, A.I. (2003) 'A tabu search based linguistic optimization approach to due date determination in earliness-tardiness flexible job shop scheduling', International Journal of Advanced Manufacturing Systems, Vol. 6, No. 1, pp.81-90.
    • (2003) International Journal of Advanced Manufacturing Systems , vol.6 , Issue.1 , pp. 81-90
    • Baykasoǧlu, A.1    Özbakir, L.2    Sönmez, A.I.3
  • 10
    • 0021819411 scopus 로고
    • A thermodynamical approach to the travelling salesman problem: An efficient simulation algorithm
    • Cerny, V. (1985) 'A thermodynamical approach to the travelling salesman problem: An efficient simulation algorithm', Journal of Optimization Theory and Application, Vol. 45, pp.41-55.
    • (1985) Journal of Optimization Theory and Application , vol.45 , pp. 41-55
    • Cerny, V.1
  • 11
    • 23044463387 scopus 로고    scopus 로고
    • Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
    • Chang, P.C., Hieh, J.C. and Liao, T.W. (2005) 'Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory', Journal of Intelligent Manufacturing, Vol. 16, pp.549-557.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , pp. 549-557
    • Chang, P.C.1    Hieh, J.C.2    Liao, T.W.3
  • 12
    • 0023436606 scopus 로고
    • An algorithm for the CON due date determination and sequencing problem
    • Cheng, T.C.E. (1987) 'An algorithm for the CON due date determination and sequencing problem', Computer and Operations Research, Vol. 14, No. 6, pp.537-542.
    • (1987) Computer and Operations Research , vol.14 , Issue.6 , pp. 537-542
    • Cheng, T.C.E.1
  • 13
    • 0032041372 scopus 로고    scopus 로고
    • Job shop scheduling for missed due date performance
    • Cheng, T.C.E. and Jiang, J. (1998) 'Job shop scheduling for missed due date performance', Computes and Industrial Engineering, Vol. 34, No. 2, pp.297-307.
    • (1998) Computes and Industrial Engineering , vol.34 , Issue.2 , pp. 297-307
    • Cheng, T.C.E.1    Jiang, J.2
  • 14
    • 0041732089 scopus 로고    scopus 로고
    • A case-based expert support system for due date assignment in a wafer fabrication factory
    • Chiu, C., Chang, P.C. and Chin, N.H. (2003) 'A case-based expert support system for due date assignment in a wafer fabrication factory', Journal of Intelligent Manufacturing, Vol. 14, pp.287-296.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 287-296
    • Chiu, C.1    Chang, P.C.2    Chin, N.H.3
  • 16
    • 0027657253 scopus 로고
    • Job shop flowtime prediction and tardiness control using queuing analysis
    • Enns, S.T. (1993) 'Job shop flowtime prediction and tardiness control using queuing analysis', International Journal of Production Research Vol. 31, No. 9, pp.2045-2057.
    • (1993) International Journal of Production Research , vol.31 , Issue.9 , pp. 2045-2057
    • Enns, S.T.1
  • 17
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness
    • Enns, S.T. (1995) 'A dynamic forecasting model for job shop flowtime prediction and tardiness', International Journal of Production Research, Vol. 33, No. 5, pp.1295-1312.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 18
    • 3943054030 scopus 로고    scopus 로고
    • Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
    • Hino, C.M., Ronconi, C.P. and Mendes, A.B. (2005) 'Minimizing earliness and tardiness penalties in a single-machine problem with a common due date', European journal of Operational Research, Vol. 160, No. 1, pp.190-201.
    • (2005) European journal of Operational Research , vol.160 , Issue.1 , pp. 190-201
    • Hino, C.M.1    Ronconi, C.P.2    Mendes, A.B.3
  • 19
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gellat, C.D. and Vecchi, M.P. (1983) 'Optimization by simulated annealing', Science, Vol. 220, pp.671-680.
    • (1983) Science , vol.220 , pp. 671-680
    • Kirkpatrick, S.1    Gellat, C.D.2    Vecchi, M.P.3
  • 23
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragartz, G.L. and Mabert, V.A. (1984) 'A simulation analysis of due date assignment rules', Journal of Operation Management, Vol. 5, No. 1, pp.27-39.
    • (1984) Journal of Operation Management , vol.5 , Issue.1 , pp. 27-39
    • Ragartz, G.L.1    Mabert, V.A.2
  • 24
    • 0000482128 scopus 로고
    • Due-date setting methodologies based on simulated annealing- an experimental study in a real-life job shop
    • Raghu, T.S. and Rajendran, C. (1995) 'Due-date setting methodologies based on simulated annealing- an experimental study in a real-life job shop', International Journal of Production Research, Vol. 33, No. 9, pp.2535-2554.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2535-2554
    • Raghu, T.S.1    Rajendran, C.2
  • 25
    • 0034659575 scopus 로고    scopus 로고
    • Dispatching rules for scheduling in assembly job shops-Part 1
    • Reeja, M.K. and Rajendran, C. (2000) 'Dispatching rules for scheduling in assembly job shops-Part 1', International Journal of Production Research, Vol. 38, No. 9, pp.2051-2066.
    • (2000) International Journal of Production Research , vol.38 , Issue.9 , pp. 2051-2066
    • Reeja, M.K.1    Rajendran, C.2
  • 26
    • 0036889382 scopus 로고    scopus 로고
    • Operation based flow time estimation in a dynamic shop
    • Sabuncuoglu, I. and Comlekci, A. (2002) 'Operation based flow time estimation in a dynamic shop', Omega, Vol. 30, No. 6, pp.423-442.
    • (2002) Omega , vol.30 , Issue.6 , pp. 423-442
    • Sabuncuoglu, I.1    Comlekci, A.2
  • 27
  • 29
    • 33751501444 scopus 로고    scopus 로고
    • Development of regression-based method with case-based tuning to solve the due date assignment problem
    • Sha, D.Y. and Storch, R.L. (2007) 'Development of regression-based method with case-based tuning to solve the due date assignment problem', International Journal of Production Research, Vol. 45, No. 1, pp.65-82.
    • (2007) International Journal of Production Research , vol.45 , Issue.1 , pp. 65-82
    • Sha, D.Y.1    Storch, R.L.2
  • 31
    • 0016984996 scopus 로고
    • A simulation study of operating policies in a hypothetical dual-constrained job shop
    • Weeks, J.K. and Fryer, J.S. (1976) 'A simulation study of operating policies in a hypothetical dual-constrained job shop', Management Science, Vol. 22, No. 12.
    • (1976) Management Science , vol.22 , Issue.12
    • Weeks, J.K.1    Fryer, J.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.