메뉴 건너뛰기




Volumn 42, Issue 20, 2004, Pages 4353-4375

Real-time due-date promising by build-to-order environments

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; CUSTOMER SATISFACTION; ESTIMATION; OPERATIONS RESEARCH; PROCESS CONTROL; PRODUCT DEVELOPMENT; RESOURCE ALLOCATION;

EID: 13644284218     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540410001716462     Document Type: Article
Times cited : (67)

References (61)
  • 1
    • 0027627910 scopus 로고
    • Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops
    • Adam, N. R., Bertrand, J. W. M., Morehead, D. C. and Surkis, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops. European Journal of Operational Research, 68, 212-227.
    • (1993) European Journal of Operational Research , vol.68 , pp. 212-227
    • Adam, N.R.1    Bertrand, J.W.M.2    Morehead, D.C.3    Surkis, J.4
  • 2
    • 0028530133 scopus 로고
    • Note: Due-date assignment to multijob customer orders
    • Bagchi, U., Julien, F. M. and Magazine, M. J., 1994, Note: Due-date assignment to multijob customer orders. Management Science, 40, 1389-1392.
    • (1994) Management Science , vol.40 , pp. 1389-1392
    • Bagchi, U.1    Julien, F.M.2    Magazine, M.J.3
  • 3
    • 0003067640 scopus 로고
    • An investigation of due-date assignment rules with constrained tightness
    • Baker, K. R. and Bertrand, J. W. M., 1981, An investigation of due-date assignment rules with constrained tightness. Journal of Operations Management, 1, 109-120.
    • (1981) Journal of Operations Management , vol.1 , pp. 109-120
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 4
    • 0020783525 scopus 로고
    • The effect of workload dependent due-dates on job shop performance
    • Bertrand, J. W. M., 1983, The effect of workload dependent due-dates on job shop performance. Management Science, 29, 799-816.
    • (1983) Management Science , vol.29 , pp. 799-816
    • Bertrand, J.W.M.1
  • 9
    • 0030216821 scopus 로고    scopus 로고
    • Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
    • Chen, Z. L., 1996, Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs. European Journal of Operational Research, 93, 49-60.
    • (1996) European Journal of Operational Research , vol.93 , pp. 49-60
    • Chen, Z.L.1
  • 11
    • 0023147094 scopus 로고
    • Optimal TWK-power due-date determination and sequencing
    • Cheng, T. C. E., 1987, Optimal TWK-power due-date determination and sequencing. International Journal of Systems Sciences, 18, 1-7.
    • (1987) International Journal of Systems Sciences , vol.18 , pp. 1-7
    • Cheng, T.C.E.1
  • 12
    • 0024082419 scopus 로고
    • Integration of priority dispatching and due-date assignment in a job shop
    • Cheng, T. C. E., 1988, Integration of priority dispatching and due-date assignment in a job shop. International Journal of Systems Science, 19, 1813-1825.
    • (1988) International Journal of Systems Science , vol.19 , pp. 1813-1825
    • Cheng, T.C.E.1
  • 13
    • 0026106024 scopus 로고
    • Optimal assignment of total-work-content due-dates and sequencing in a single-machine shop
    • Cheng, T. C. E., 1991, Optimal assignment of total-work-content due-dates and sequencing in a single-machine shop. Journal of the Operational Research Society, 42, 177-181.
    • (1991) Journal of the Operational Research Society , vol.42 , pp. 177-181
    • Cheng, T.C.E.1
  • 14
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38, 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 15
    • 0030173541 scopus 로고    scopus 로고
    • Due-date assignment and single machine scheduling with compressible processing times
    • Cheng, T. C. E., Oguz, C. and Qi, X. D., 1996, Due-date assignment and single machine scheduling with compressible processing times. International Journal of Production Economics, 43, 107-113.
    • (1996) International Journal of Production Economics , vol.43 , pp. 107-113
    • Cheng, T.C.E.1    Oguz, C.2    Qi, X.D.3
  • 16
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • Conway, R. W., 1965, Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16, 228-237.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 18
    • 0028374525 scopus 로고
    • Due-date assignment and early/tardy scheduling on identical parallel machines
    • De, P., Ghosh, J. B. and Wells, C. E., 1994a, Due-date assignment and early/tardy scheduling on identical parallel machines. Naval Research Logistics, 41, 17-32.
    • (1994) Naval Research Logistics , vol.41 , pp. 17-32
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 20
    • 0001131108 scopus 로고
    • Single facility due date setting with multiple customer classes
    • Duenyas, I., 1995, Single facility due date setting with multiple customer classes. Management Science, 41, 608-619.
    • (1995) Management Science , vol.41 , pp. 608-619
    • Duenyas, I.1
  • 21
    • 0002987480 scopus 로고
    • Quoting customer lead times
    • Duenyas, I. and Hopp, W. J., 1995, Quoting customer lead times. Management Science, 41, 43-57.
    • (1995) Management Science , vol.41 , pp. 43-57
    • Duenyas, I.1    Hopp, W.J.2
  • 24
    • 0024680497 scopus 로고
    • Due date assignment in a multistage job shop
    • Fry, T. D., Philipoom, P. R. and Markland, R. E., 1989, Due date assignment in a multistage job shop. IIE Transactions, 21, 153-161.
    • (1989) IIE Transactions , vol.21 , pp. 153-161
    • Fry, T.D.1    Philipoom, P.R.2    Markland, R.E.3
  • 25
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • Gordon, V., Proth, J. and Chu, C., 2002, A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research, 139, 1-25.
    • (2002) European Journal of Operational Research , vol.139 , pp. 1-25
    • Gordon, V.1    Proth, J.2    Chu, C.3
  • 27
    • 13644277715 scopus 로고    scopus 로고
    • Order management via advanced planning systems. APICS — The Performance Advantage
    • Hadavi, K. C., 1998, Order management via advanced planning systems. APICS — The Performance Advantage, January, 40-42.
    • (1998) January , pp. 40-42
    • Hadavi, K.C.1
  • 28
    • 0017246996 scopus 로고
    • Due-dates and instantaneous load in the one-machine shop
    • Heard, E. L., 1976, Due-dates and instantaneous load in the one-machine shop. Management Science, 23, 444-450.
    • (1976) Management Science , vol.23 , pp. 444-450
    • Heard, E.L.1
  • 29
    • 0035307357 scopus 로고    scopus 로고
    • Due date setting with supply constraints in systems using MRP
    • Hegedus, M. G. and Hopp, W. J., 2001, Due date setting with supply constraints in systems using MRP. Computers and Industrial Engineering, 39, 293-305.
    • (2001) Computers and Industrial Engineering , vol.39 , pp. 293-305
    • Hegedus, M.G.1    Hopp, W.J.2
  • 30
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • Hopp, W. J. and Sturgis, M. L. R., 2000, Quoting manufacturing due dates subject to a service level constraint. IIE Transactions, 32, 771-784.
    • (2000) IIE Transactions , vol.32 , pp. 771-784
    • Hopp, W.J.1    Sturgis, M.L.R.2
  • 32
    • 0027850894 scopus 로고
    • A probabilistic cost-based due date assignment model for job shops
    • Kaplan, A. C. and Unal, A. T., 1993, A probabilistic cost-based due date assignment model for job shops. International Journal of Production Research, 31, 2817-2834.
    • (1993) International Journal of Production Research , vol.31 , pp. 2817-2834
    • Kaplan, A.C.1    Unal, A.T.2
  • 33
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due-dates in complex production systems
    • Lawrence, S. R., 1995, Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions, 27, 657-668.
    • (1995) IIE Transactions , vol.27 , pp. 657-668
    • Lawrence, S.R.1
  • 34
    • 0032668257 scopus 로고    scopus 로고
    • Due date determination with resequencing
    • Li, C. L. and Cheng, T. C. E., 1999, Due date determination with resequencing. IIE Transactions, 31, 183-188.
    • (1999) IIE Transactions , vol.31 , pp. 183-188
    • Li, C.L.1    Cheng, T.C.E.2
  • 35
    • 0000861722 scopus 로고
    • A proof for the queueing formula
    • Little, J. D., 1961, A proof for the queueing formula L = 1W. Operations Research, 9, 383-387.
    • (1961) L = 1W. Operations Research , vol.9 , pp. 383-387
    • Little, J.D.1
  • 36
    • 0027559574 scopus 로고
    • A due date assignment algorithm for multiproduct manufacturing facilities
    • Luss, H. and Rosenwein, M. B., 1993, A due date assignment algorithm for multiproduct manufacturing facilities. European Journal of Operational Research, 65, 187-198.
    • (1993) European Journal of Operational Research , vol.65 , pp. 187-198
    • Luss, H.1    Rosenwein, M.B.2
  • 37
    • 0033096959 scopus 로고    scopus 로고
    • Due date demand management: Negotiating the trade-off between price and delivery
    • Moodie, D. R. and Bobrowski, P. M., 1999, Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37, 997-1021.
    • (1999) International Journal of Production Research , vol.37 , pp. 997-1021
    • Moodie, D.R.1    Bobrowski, P.M.2
  • 38
    • 0033308059 scopus 로고    scopus 로고
    • Due date assignment using feedback control with reinforcement learning
    • Moses, S. A., 1999, Due date assignment using feedback control with reinforcement learning. IIE Transactions, 31, 989-999.
    • (1999) IIE Transactions , vol.31 , pp. 989-999
    • Moses, S.A.1
  • 39
    • 0032003355 scopus 로고    scopus 로고
    • Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand
    • Palaka, K., Erlebacher, S. and Kropp, D. H., 1998, Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand. IIE Transactions, 30, 151-163.
    • (1998) IIE Transactions , vol.30 , pp. 151-163
    • Palaka, K.1    Erlebacher, S.2    Kropp, D.H.3
  • 41
  • 42
    • 0000482128 scopus 로고
    • Due-date setting methodologies based on simulated annealing — an experimental study in a real-life job shop
    • Raghu, T. S. and Rajendran, C., 1995, Due-date setting methodologies based on simulated annealing — an experimental study in a real-life job shop. International Journal of Production Research, 33, 2535-2554.
    • (1995) International Journal of Production Research , vol.33 , pp. 2535-2554
    • Raghu, T.S.1    Rajendran, C.2
  • 43
    • 0012351340 scopus 로고
    • A due-date assignment model for a flow shop with application in a lightguide cable shop
    • Rajasekera, J. R., Murr, M. R. and So, K. C., 1991, A due-date assignment model for a flow shop with application in a lightguide cable shop. Journal of Manufacturing Systems, 10, 1-7.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 1-7
    • Rajasekera, J.R.1    Murr, M.R.2    So, K.C.3
  • 44
    • 0030172572 scopus 로고    scopus 로고
    • Dynamic assignation of due-dates in an assembly shop based in simulation
    • Roman, D. B. and del Valle, A. G., 1996, Dynamic assignation of due-dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
    • (1996) International Journal of Production Research , vol.34 , pp. 1539-1554
    • Roman, D.B.1    Del Valle, A.G.2
  • 46
    • 0019560165 scopus 로고
    • Due date assignment for production systems
    • Seidmann, A. and Smith, M. L., 1981, Due date assignment for production systems. Management Science, 27, 571-581.
    • (1981) Management Science , vol.27 , pp. 571-581
    • Seidmann, A.1    Smith, M.L.2
  • 47
    • 0024064120 scopus 로고
    • Approximations for the time spent in a dynamic job shop with applications to due-date assignment
    • Shanthikumar, J. G. and Sumita, U., 1988, Approximations for the time spent in a dynamic job shop with applications to due-date assignment. International Journal of Production Research, 26, 1329-1352.
    • (1988) International Journal of Production Research , vol.26 , pp. 1329-1352
    • Shanthikumar, J.G.1    Sumita, U.2
  • 48
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith, C. H., Minor, E. D. and Wen, H. J., 1995, Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
    • (1995) International Journal of Production Research , vol.33 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 52
    • 0027540852 scopus 로고
    • An investigation of due-date assignment using workload information of a dynamic shop
    • Udo, G., 1993, An investigation of due-date assignment using workload information of a dynamic shop. International Journal of Production Economics, 29, 89-101.
    • (1993) International Journal of Production Economics , vol.29 , pp. 89-101
    • Udo, G.1
  • 54
    • 0027565391 scopus 로고
    • Mixing static and dynamic flowtime estimates for due-date assignment
    • Vig, M. M. and Dooley, K. J., 1993, Mixing static and dynamic flowtime estimates for due-date assignment. Journal of Operations Management, 11, 67-79.
    • (1993) Journal of Operations Management , vol.11 , pp. 67-79
    • Vig, M.M.1    Dooley, K.J.2
  • 56
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • Weeks, J. K., 1979, A simulation study of predictable due-dates. Management Science, 25, 363-373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 57
    • 0001200692 scopus 로고
    • Due-date setting and priority sequencing in a multiclass M/G/1 queue
    • Wein, L. M., 1991, Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science, 37, 834-850.
    • (1991) Management Science , vol.37 , pp. 834-850
    • Wein, L.M.1
  • 58
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein, L. M. and Chevalier, P. B., 1992, A broader view of the job-shop scheduling problem. Management Science, 38, 1018-1033.
    • (1992) Management Science , vol.38 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2
  • 59
    • 0002112447 scopus 로고
    • The statistical analysis of simulation results
    • S. Lavenberg (ed.), New York: Academic Press
    • Welch, P., 1983, The statistical analysis of simulation results. In S. Lavenberg (ed.), The Computer Performance Modeling Handbook (New York: Academic Press), pp. 268-328.
    • (1983) The Computer Performance Modeling Handbook , pp. 268-328
    • Welch, P.1
  • 60
    • 0032656380 scopus 로고    scopus 로고
    • Strategies for integrating lead time and customer-order decisions
    • Weng, Z. K., 1999, Strategies for integrating lead time and customer-order decisions. IIE Transactions, 31, 161-171.
    • (1999) IIE Transactions , vol.31 , pp. 161-171
    • Weng, Z.K.1
  • 61
    • 0023207074 scopus 로고
    • Setting planned leadtimes in serial production systems with tardiness costs
    • Yano, C. A., 1987, Setting planned leadtimes in serial production systems with tardiness costs. Management Science, 33, 95-106.
    • (1987) Management Science , vol.33 , pp. 95-106
    • Yano, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.