Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops
-
Adam, N. R., Bertrand, J. W. M., Morehead, D. C. and Surkis, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops. European Journal of Operational Research, 68, 212-227.
-
(1993)
European Journal of Operational Research
, vol.68
, pp. 212-227
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Morehead, D.C.3
Surkis, J.4
-
2
-
-
0028530133
-
Note: Due-date assignment to multijob customer orders
-
Bagchi, U., Julien, F. M. and Magazine, M. J., 1994, Note: Due-date assignment to multijob customer orders. Management Science, 40, 1389-1392.
-
(1994)
Management Science
, vol.40
, pp. 1389-1392
-
-
Bagchi, U.1
Julien, F.M.2
Magazine, M.J.3
-
3
-
-
0003067640
-
An investigation of due-date assignment rules with constrained tightness
-
Baker, K. R. and Bertrand, J. W. M., 1981, An investigation of due-date assignment rules with constrained tightness. Journal of Operations Management, 1, 109-120.
-
(1981)
Journal of Operations Management
, vol.1
, pp. 109-120
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
4
-
-
0020783525
-
The effect of workload dependent due-dates on job shop performance
-
Bertrand, J. W. M., 1983, The effect of workload dependent due-dates on job shop performance. Management Science, 29, 799-816.
-
(1983)
Management Science
, vol.29
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
5
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J. H., Phillips, D. T. and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20, 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
7
-
-
0035730939
-
Quantity and due date quoting available to promise
-
Chen, C. Y., Zhao, Z. Y. and Ball, M. O., 2001, Quantity and due date quoting available to promise. Information Systems Frontiers, 3, 477-488.
-
(2001)
Information Systems Frontiers
, vol.3
, pp. 477-488
-
-
Chen, C.Y.1
Zhao, Z.Y.2
Ball, M.O.3
-
8
-
-
5144232771
-
A model for batch advanced available-to-promise
-
Chen, C. Y., Zhao, Z. Y. and Ball, M. O., 2002, A model for batch advanced available-to-promise. Production and Operations Management, 11, 424-440.
-
(2002)
Production and Operations Management
, vol.11
, pp. 424-440
-
-
Chen, C.Y.1
Zhao, Z.Y.2
Ball, M.O.3
-
9
-
-
0030216821
-
Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
-
Chen, Z. L., 1996, Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs. European Journal of Operational Research, 93, 49-60.
-
(1996)
European Journal of Operational Research
, vol.93
, pp. 49-60
-
-
Chen, Z.L.1
-
11
-
-
0023147094
-
Optimal TWK-power due-date determination and sequencing
-
Cheng, T. C. E., 1987, Optimal TWK-power due-date determination and sequencing. International Journal of Systems Sciences, 18, 1-7.
-
(1987)
International Journal of Systems Sciences
, vol.18
, pp. 1-7
-
-
Cheng, T.C.E.1
-
12
-
-
0024082419
-
Integration of priority dispatching and due-date assignment in a job shop
-
Cheng, T. C. E., 1988, Integration of priority dispatching and due-date assignment in a job shop. International Journal of Systems Science, 19, 1813-1825.
-
(1988)
International Journal of Systems Science
, vol.19
, pp. 1813-1825
-
-
Cheng, T.C.E.1
-
13
-
-
0026106024
-
Optimal assignment of total-work-content due-dates and sequencing in a single-machine shop
-
Cheng, T. C. E., 1991, Optimal assignment of total-work-content due-dates and sequencing in a single-machine shop. Journal of the Operational Research Society, 42, 177-181.
-
(1991)
Journal of the Operational Research Society
, vol.42
, pp. 177-181
-
-
Cheng, T.C.E.1
-
14
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38, 156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
15
-
-
0030173541
-
Due-date assignment and single machine scheduling with compressible processing times
-
Cheng, T. C. E., Oguz, C. and Qi, X. D., 1996, Due-date assignment and single machine scheduling with compressible processing times. International Journal of Production Economics, 43, 107-113.
-
(1996)
International Journal of Production Economics
, vol.43
, pp. 107-113
-
-
Cheng, T.C.E.1
Oguz, C.2
Qi, X.D.3
-
16
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
Conway, R. W., 1965, Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16, 228-237.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 228-237
-
-
Conway, R.W.1
-
17
-
-
0026836720
-
Optimal due-date assignment and sequencing
-
De, P., Ghosh, J. B. and Wells, C. E., 1992, Optimal due-date assignment and sequencing. European Journal of Operational Research, 57, 323-331.
-
(1992)
European Journal of Operational Research
, vol.57
, pp. 323-331
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
18
-
-
0028374525
-
Due-date assignment and early/tardy scheduling on identical parallel machines
-
De, P., Ghosh, J. B. and Wells, C. E., 1994a, Due-date assignment and early/tardy scheduling on identical parallel machines. Naval Research Logistics, 41, 17-32.
-
(1994)
Naval Research Logistics
, vol.41
, pp. 17-32
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
19
-
-
0028383311
-
Solving a generalized model for CON due date assignment and sequencing
-
De, P., Ghosh, J. B. and Wells, C. E., 1994b, Solving a generalized model for CON due date assignment and sequencing. International Journal of Production Economics, 34, 179-185.
-
(1994)
International Journal of Production Economics
, vol.34
, pp. 179-185
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
20
-
-
0001131108
-
Single facility due date setting with multiple customer classes
-
Duenyas, I., 1995, Single facility due date setting with multiple customer classes. Management Science, 41, 608-619.
-
(1995)
Management Science
, vol.41
, pp. 608-619
-
-
Duenyas, I.1
-
21
-
-
0002987480
-
Quoting customer lead times
-
Duenyas, I. and Hopp, W. J., 1995, Quoting customer lead times. Management Science, 41, 43-57.
-
(1995)
Management Science
, vol.41
, pp. 43-57
-
-
Duenyas, I.1
Hopp, W.J.2
-
22
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S. E. and Chowdhury, I. G., 1976, Due dates in job shop scheduling. International Journal of Production Research, 14, 223-237.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 223-237
-
-
Eilon, S.E.1
Chowdhury, I.G.2
-
23
-
-
13644273784
-
-
Stamford, CT: GartnerGroup)
-
Enslow, B. and Desisto, R., 1998, Managing Customer Commitments: ATP, CTP and Beyond (Stamford, CT: GartnerGroup).
-
(1998)
Managing Customer Commitments: ATP, CTP and Beyond
-
-
Enslow, B.1
Desisto, R.2
-
24
-
-
0024680497
-
Due date assignment in a multistage job shop
-
Fry, T. D., Philipoom, P. R. and Markland, R. E., 1989, Due date assignment in a multistage job shop. IIE Transactions, 21, 153-161.
-
(1989)
IIE Transactions
, vol.21
, pp. 153-161
-
-
Fry, T.D.1
Philipoom, P.R.2
Markland, R.E.3
-
25
-
-
0037118177
-
A survey of the state-of-the-art of common due date assignment and scheduling research
-
Gordon, V., Proth, J. and Chu, C., 2002, A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research, 139, 1-25.
-
(2002)
European Journal of Operational Research
, vol.139
, pp. 1-25
-
-
Gordon, V.1
Proth, J.2
Chu, C.3
-
26
-
-
0032155632
-
Effects of update techniques on main memory database system performance
-
Gruenwald, L., Chen, Y. and Huang, J., 1998, Effects of update techniques on main memory database system performance. IEEE Transactions on Knowledge and Data Engineering, 10, 859-861.
-
(1998)
IEEE Transactions on Knowledge and Data Engineering
, vol.10
, pp. 859-861
-
-
Gruenwald, L.1
Chen, Y.2
Huang, J.3
-
27
-
-
13644277715
-
Order management via advanced planning systems. APICS — The Performance Advantage
-
Hadavi, K. C., 1998, Order management via advanced planning systems. APICS — The Performance Advantage, January, 40-42.
-
(1998)
January
, pp. 40-42
-
-
Hadavi, K.C.1
-
28
-
-
0017246996
-
Due-dates and instantaneous load in the one-machine shop
-
Heard, E. L., 1976, Due-dates and instantaneous load in the one-machine shop. Management Science, 23, 444-450.
-
(1976)
Management Science
, vol.23
, pp. 444-450
-
-
Heard, E.L.1
-
29
-
-
0035307357
-
Due date setting with supply constraints in systems using MRP
-
Hegedus, M. G. and Hopp, W. J., 2001, Due date setting with supply constraints in systems using MRP. Computers and Industrial Engineering, 39, 293-305.
-
(2001)
Computers and Industrial Engineering
, vol.39
, pp. 293-305
-
-
Hegedus, M.G.1
Hopp, W.J.2
-
30
-
-
0034275944
-
Quoting manufacturing due dates subject to a service level constraint
-
Hopp, W. J. and Sturgis, M. L. R., 2000, Quoting manufacturing due dates subject to a service level constraint. IIE Transactions, 32, 771-784.
-
(2000)
IIE Transactions
, vol.32
, pp. 771-784
-
-
Hopp, W.J.1
Sturgis, M.L.R.2
-
31
-
-
0345010141
-
A simple, robust leadtime-quoting policy
-
Hopp, W. J. and Sturgis, M. R., 2001, A simple, robust leadtime-quoting policy. Manufacturing and Service Operations Management, 3, 321-336.
-
(2001)
Manufacturing and Service Operations Management
, vol.3
, pp. 321-336
-
-
Hopp, W.J.1
Sturgis, M.R.2
-
32
-
-
0027850894
-
A probabilistic cost-based due date assignment model for job shops
-
Kaplan, A. C. and Unal, A. T., 1993, A probabilistic cost-based due date assignment model for job shops. International Journal of Production Research, 31, 2817-2834.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2817-2834
-
-
Kaplan, A.C.1
Unal, A.T.2
-
33
-
-
0029393210
-
Estimating flowtimes and setting due-dates in complex production systems
-
Lawrence, S. R., 1995, Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions, 27, 657-668.
-
(1995)
IIE Transactions
, vol.27
, pp. 657-668
-
-
Lawrence, S.R.1
-
34
-
-
0032668257
-
Due date determination with resequencing
-
Li, C. L. and Cheng, T. C. E., 1999, Due date determination with resequencing. IIE Transactions, 31, 183-188.
-
(1999)
IIE Transactions
, vol.31
, pp. 183-188
-
-
Li, C.L.1
Cheng, T.C.E.2
-
35
-
-
0000861722
-
A proof for the queueing formula
-
Little, J. D., 1961, A proof for the queueing formula L = 1W. Operations Research, 9, 383-387.
-
(1961)
L = 1W. Operations Research
, vol.9
, pp. 383-387
-
-
Little, J.D.1
-
36
-
-
0027559574
-
A due date assignment algorithm for multiproduct manufacturing facilities
-
Luss, H. and Rosenwein, M. B., 1993, A due date assignment algorithm for multiproduct manufacturing facilities. European Journal of Operational Research, 65, 187-198.
-
(1993)
European Journal of Operational Research
, vol.65
, pp. 187-198
-
-
Luss, H.1
Rosenwein, M.B.2
-
37
-
-
0033096959
-
Due date demand management: Negotiating the trade-off between price and delivery
-
Moodie, D. R. and Bobrowski, P. M., 1999, Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37, 997-1021.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 997-1021
-
-
Moodie, D.R.1
Bobrowski, P.M.2
-
38
-
-
0033308059
-
Due date assignment using feedback control with reinforcement learning
-
Moses, S. A., 1999, Due date assignment using feedback control with reinforcement learning. IIE Transactions, 31, 989-999.
-
(1999)
IIE Transactions
, vol.31
, pp. 989-999
-
-
Moses, S.A.1
-
39
-
-
0032003355
-
Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand
-
Palaka, K., Erlebacher, S. and Kropp, D. H., 1998, Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand. IIE Transactions, 30, 151-163.
-
(1998)
IIE Transactions
, vol.30
, pp. 151-163
-
-
Palaka, K.1
Erlebacher, S.2
Kropp, D.H.3
-
40
-
-
0021468849
-
A framework for the study of due date management in job shops
-
Ragatz, G. L. and Mabert, V. A., 1984a, A framework for the study of due date management in job shops. International Journal of Production Research, 22, 685-695.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 685-695
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
41
-
-
0001870328
-
A simulation analysis of due date assignment rules
-
Ragatz, G. L. and Mabert, V. A., 1984b, A simulation analysis of due date assignment rules. Journal of Operations Management, 5, 27-39.
-
(1984)
Journal of Operations Management
, vol.5
, pp. 27-39
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
42
-
-
0000482128
-
Due-date setting methodologies based on simulated annealing — an experimental study in a real-life job shop
-
Raghu, T. S. and Rajendran, C., 1995, Due-date setting methodologies based on simulated annealing — an experimental study in a real-life job shop. International Journal of Production Research, 33, 2535-2554.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2535-2554
-
-
Raghu, T.S.1
Rajendran, C.2
-
43
-
-
0012351340
-
A due-date assignment model for a flow shop with application in a lightguide cable shop
-
Rajasekera, J. R., Murr, M. R. and So, K. C., 1991, A due-date assignment model for a flow shop with application in a lightguide cable shop. Journal of Manufacturing Systems, 10, 1-7.
-
(1991)
Journal of Manufacturing Systems
, vol.10
, pp. 1-7
-
-
Rajasekera, J.R.1
Murr, M.R.2
So, K.C.3
-
44
-
-
0030172572
-
Dynamic assignation of due-dates in an assembly shop based in simulation
-
Roman, D. B. and del Valle, A. G., 1996, Dynamic assignation of due-dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1539-1554
-
-
Roman, D.B.1
Del Valle, A.G.2
-
45
-
-
0032254704
-
-
Washington, DC, USA
-
Ruiz-Torres, A. J. and Nakatani, K., 1998, Application of real-time simulation to assign due dates on logistic-manufacturing networks. in Proceedings of the 1998 winter Simulation Conference, Washington, DC, USA, pp. 1205-1210.
-
(1998)
Application of Real-Time Simulation to Assign Due Dates on Logistic-Manufacturing Networks. In Proceedings of the 1998 Winter Simulation Conference
, pp. 1205-1210
-
-
Ruiz-Torres, A.J.1
Nakatani, K.2
-
46
-
-
0019560165
-
Due date assignment for production systems
-
Seidmann, A. and Smith, M. L., 1981, Due date assignment for production systems. Management Science, 27, 571-581.
-
(1981)
Management Science
, vol.27
, pp. 571-581
-
-
Seidmann, A.1
Smith, M.L.2
-
47
-
-
0024064120
-
Approximations for the time spent in a dynamic job shop with applications to due-date assignment
-
Shanthikumar, J. G. and Sumita, U., 1988, Approximations for the time spent in a dynamic job shop with applications to due-date assignment. International Journal of Production Research, 26, 1329-1352.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1329-1352
-
-
Shanthikumar, J.G.1
Sumita, U.2
-
48
-
-
0001385963
-
Regression-based due date assignment rules for improved assembly shop performance
-
Smith, C. H., Minor, E. D. and Wen, H. J., 1995, Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
49
-
-
0020500356
-
Due date selection procedures for job-shop simulation
-
Smith, M. L. and Seidmann, A., 1983, Due date selection procedures for job-shop simulation. Computers and Industrial Engineering, 7, 199-207.
-
(1983)
Computers and Industrial Engineering
, vol.7
, pp. 199-207
-
-
Smith, M.L.1
Seidmann, A.2
-
50
-
-
0032630294
-
Optimal lead time policies
-
Spearman, M. L. and Zhang, R. Q., 1999, Optimal lead time policies. Management Science, 45, 290-295.
-
(1999)
Management Science
, vol.45
, pp. 290-295
-
-
Spearman, M.L.1
Zhang, R.Q.2
-
51
-
-
0031332607
-
Integrating order release control with due-date assignment rules
-
Tsai, C. H., Chang, G. T. and Li, R. T., 1997, Integrating order release control with due-date assignment rules. International Journal of Production Research, 35, 3379-3392.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 3379-3392
-
-
Tsai, C.H.1
Chang, G.T.2
Li, R.T.3
-
52
-
-
0027540852
-
An investigation of due-date assignment using workload information of a dynamic shop
-
Udo, G., 1993, An investigation of due-date assignment using workload information of a dynamic shop. International Journal of Production Economics, 29, 89-101.
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 89-101
-
-
Udo, G.1
-
53
-
-
0026186620
-
Dynamic rules for due-date assignment
-
Vig, M. M., and Dooley, K. J., 1991, Dynamic rules for due-date assignment. International Journal of Production Research, 29(7), 1361-1377.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
54
-
-
0027565391
-
Mixing static and dynamic flowtime estimates for due-date assignment
-
Vig, M. M. and Dooley, K. J., 1993, Mixing static and dynamic flowtime estimates for due-date assignment. Journal of Operations Management, 11, 67-79.
-
(1993)
Journal of Operations Management
, vol.11
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
55
-
-
0032138424
-
A fuzzy due-date bargainer for the make-to-order manufacturing systems
-
Wang, D., Fang, S. C. and Hodgson, T. J., 1998, A fuzzy due-date bargainer for the make-to-order manufacturing systems. IEEE Transactions on Systems, Man, and Cybernetics — Part C: Applications and Reviews, 28, 492-497.
-
(1998)
IEEE Transactions on Systems, Man, and Cybernetics — Part C: Applications and Reviews
, vol.28
, pp. 492-497
-
-
Wang, D.1
Fang, S.C.2
Hodgson, T.J.3
-
56
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks, J. K., 1979, A simulation study of predictable due-dates. Management Science, 25, 363-373.
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
57
-
-
0001200692
-
Due-date setting and priority sequencing in a multiclass M/G/1 queue
-
Wein, L. M., 1991, Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science, 37, 834-850.
-
(1991)
Management Science
, vol.37
, pp. 834-850
-
-
Wein, L.M.1
-
58
-
-
0026884810
-
A broader view of the job-shop scheduling problem
-
Wein, L. M. and Chevalier, P. B., 1992, A broader view of the job-shop scheduling problem. Management Science, 38, 1018-1033.
-
(1992)
Management Science
, vol.38
, pp. 1018-1033
-
-
Wein, L.M.1
Chevalier, P.B.2
-
59
-
-
0002112447
-
The statistical analysis of simulation results
-
S. Lavenberg (ed.), New York: Academic Press
-
Welch, P., 1983, The statistical analysis of simulation results. In S. Lavenberg (ed.), The Computer Performance Modeling Handbook (New York: Academic Press), pp. 268-328.
-
(1983)
The Computer Performance Modeling Handbook
, pp. 268-328
-
-
Welch, P.1
-
60
-
-
0032656380
-
Strategies for integrating lead time and customer-order decisions
-
Weng, Z. K., 1999, Strategies for integrating lead time and customer-order decisions. IIE Transactions, 31, 161-171.
-
(1999)
IIE Transactions
, vol.31
, pp. 161-171
-
-
Weng, Z.K.1
-
61
-
-
0023207074
-
Setting planned leadtimes in serial production systems with tardiness costs
-
Yano, C. A., 1987, Setting planned leadtimes in serial production systems with tardiness costs. Management Science, 33, 95-106.
-
(1987)
Management Science
, vol.33
, pp. 95-106
-
-
Yano, C.A.1
|