메뉴 건너뛰기




Volumn 38, Issue 9, 2000, Pages 2051-2066

Dispatching rules for scheduling in assembly jobshops - Part 1

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY MACHINES; COMPUTER SIMULATION; JOB ANALYSIS; SCHEDULING;

EID: 0034659575     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/002075400188492     Document Type: Article
Times cited : (41)

References (33)
  • 1
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi-level assembly jobshops
    • Adam, N.R., Bertrand, J.W.M. and Surkis, J., 1987, Priority assignment procedures in multi-level assembly jobshops, IIE Transactions, 19, 317-328.
    • (1987) IIE Transactions , vol.19 , pp. 317-328
    • Adam, N.R.1    Bertrand, J.W.M.2    Surkis, J.3
  • 2
    • 0027627910 scopus 로고
    • Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops
    • Adam, N.R., Bertrand, J.W.M., Morehead, D.C. and Surkis, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops. European Journal of Operational Research, 68, 212-227.
    • (1993) European Journal of Operational Research , vol.68 , pp. 212-227
    • Adam, N.R.1    Bertrand, J.W.M.2    Morehead, D.C.3    Surkis, J.4
  • 5
  • 9
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a jobshop
    • Conway, R.W., 1965, Priority dispatching and job lateness in a jobshop. Journal of Industrial Engineering, 16, 228-237.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 10
    • 0011788714 scopus 로고
    • Network dispatching by shortest operation discipline
    • Conway, R.W. and Maxwell, W.L., 1962, Network dispatching by shortest operation discipline. Operations Research, 10, 51-73.
    • (1962) Operations Research , vol.10 , pp. 51-73
    • Conway, R.W.1    Maxwell, W.L.2
  • 12
    • 84989446840 scopus 로고
    • Operating policies for scheduling assembled products
    • Goodwin, J.S. and Goodwin, J.C., 1982, Operating policies for scheduling assembled products. Decision Sciences, 13, 585-603.
    • (1982) Decision Sciences , vol.13 , pp. 585-603
    • Goodwin, J.S.1    Goodwin, J.C.2
  • 13
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R., 1989, A survey of priority rule-based scheduling. OR Spektrum, 11, 3-16.
    • (1989) OR Spektrum, , vol.11 , pp. 3-16
    • Haupt, R.1
  • 16
    • 0011789253 scopus 로고
    • Priority dispatching and assembly operations in a jobshop
    • 1969
    • Maxwell, W.L., 1969, Priority dispatching and assembly operations in a jobshop. Rand Corporation Memorandum, 1969.
    • (1969) Rand Corporation Memorandum
    • Maxwell, W.L.1
  • 17
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W.L. and Mehra, M., 1968, Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 19
    • 0042305903 scopus 로고
    • An experimental investigation and comparative evaluation of priority disciplines in jobshop-like queuing networks
    • Management Sciences Research Project
    • Nanot, Y.R., 1963, An experimental investigation and comparative evaluation of priority disciplines in jobshop-like queuing networks. Management Sciences Research Project, UCLA Research Report No. 87.
    • (1963) UCLA Research Report , vol.87
    • Nanot, Y.R.1
  • 20
    • 0026140380 scopus 로고
    • A preliminary investigation of multi-attribute based sequencing rules for assembly shops
    • Philipoom, P.R., Russell, R.S. and Fry, T.D., 1991, A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29, 739-753.
    • (1991) International Journal of Production Research , vol.29 , pp. 739-753
    • Philipoom, P.R.1    Russell, R.S.2    Fry, T.D.3
  • 22
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flowshops and jobshops
    • Rajendran, C. and Holthaus, O., 1999, A comparative study of dispatching rules in dynamic flowshops and jobshops. European Journal of Operational Research, 116, 156-170.
    • (1999) European Journal of Operational Research , vol.116 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 23
    • 29444438437 scopus 로고
    • Dynamic jobshop scheduling: A survey of simulation research
    • Ramasesh, R., 1990, Dynamic jobshop scheduling: a survey of simulation research. OMEGA, 16, 43-57.
    • (1990) OMEGA , vol.16 , pp. 43-57
    • Ramasesh, R.1
  • 24
    • 0016885524 scopus 로고
    • A statistical comparison of the performance of simple dispatching rules for a particular set of jobshops
    • Rochette, R. and Sadowski, R.P., 1976, A statistical comparison of the performance of simple dispatching rules for a particular set of jobshops. International Journal of Production Research, 14, 63-75.
    • (1976) International Journal of Production Research , vol.14 , pp. 63-75
    • Rochette, R.1    Sadowski, R.P.2
  • 25
    • 0030172572 scopus 로고    scopus 로고
    • Dynamic assignation of due-dates in an assembly shop based in simulation
    • Roman, D.B. and Del Valle, A.G., 1996, Dynamic assignation of due-dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
    • (1996) International Journal of Production Research , vol.34 , pp. 1539-1554
    • Roman, D.B.1    Del Valle, A.G.2
  • 27
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for an assembly shop
    • Russell, R.S. and Taylor III B.W., 1985, An evaluation of sequencing rules for an assembly shop. Decision Sciences, 16, 196-212.
    • (1985) Decision Sciences , vol.16 , pp. 196-212
    • Russell, R.S.1    Taylor B.W. III2
  • 28
    • 0011727186 scopus 로고
    • Priority dispatching rules in jobshops with assembly operations and random delays
    • Sculli, D., 1980, Priority dispatching rules in jobshops with assembly operations and random delays. OMEGA, 8, 227-234.
    • (1980) OMEGA , vol.8 , pp. 227-234
    • Sculli, D.1
  • 30
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith, C.H., Minor, E.D. and Wen, H.J., 1995, Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
    • (1995) International Journal of Production Research , vol.33 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 31
    • 0023399009 scopus 로고
    • Priority rules for jobshops with weighted tardiness costs
    • Vepsalainen, A.P.J. and Morton, T.E., 1987, Priority rules for jobshops with weighted tardiness costs. Management Science, 33, 1035-1047.
    • (1987) Management Science , vol.33 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 32
    • 0029344295 scopus 로고
    • A comparative study of some priority dispatching rules under different shop loads
    • Waikar, A.M., Sarkar, B.R. and Lal, A.M., 1995, A comparative study of some priority dispatching rules under different shop loads. Production Planning & Control, 6, 301-310.
    • (1995) Production Planning & Control , vol.6 , pp. 301-310
    • Waikar, A.M.1    Sarkar, B.R.2    Lal, A.M.3
  • 33
    • 0345403299 scopus 로고
    • The influence of setup time on jobshop performance
    • Wilbrecht, J.K. and Prescott, W.R., 1969, The influence of setup time on jobshop performance. Management Science, 16, 274-280.
    • (1969) Management Science , vol.16 , pp. 274-280
    • Wilbrecht, J.K.1    Prescott, W.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.