-
1
-
-
0023418695
-
Priority assignment procedures in multi-level assembly jobshops
-
Adam, N.R., Bertrand, J.W.M. and Surkis, J., 1987, Priority assignment procedures in multi-level assembly jobshops, IIE Transactions, 19, 317-328.
-
(1987)
IIE Transactions
, vol.19
, pp. 317-328
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Surkis, J.3
-
2
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops
-
Adam, N.R., Bertrand, J.W.M., Morehead, D.C. and Surkis, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops. European Journal of Operational Research, 68, 212-227.
-
(1993)
European Journal of Operational Research
, vol.68
, pp. 212-227
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Morehead, D.C.3
Surkis, J.4
-
3
-
-
0025694085
-
Two new rules to minimize tardiness in a jobshop
-
Anderson, E.J. and Nyirendra, J.C., 1990, Two new rules to minimize tardiness in a jobshop. International Journal of Production Research, 28, 2277-2292.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2277-2292
-
-
Anderson, E.J.1
Nyirendra, J.C.2
-
5
-
-
0000450049
-
Simulation of a simplified jobshop
-
Baker, C.T. and Dzeilinski, B.P., 1960, Simulation of a simplified jobshop. Management Science, 6, 311-323.
-
(1960)
Management Science
, vol.6
, pp. 311-323
-
-
Baker, C.T.1
Dzeilinski, B.P.2
-
6
-
-
0002563758
-
Jobshop scheduling with modified due dates
-
Baker, K.R. and Kanet, J.J., 1983, Jobshop scheduling with modified due dates. Journal of Operations Management, 4, 11-22.
-
(1983)
Journal of Operations Management
, vol.4
, pp. 11-22
-
-
Baker, K.R.1
Kanet, J.J.2
-
7
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing jobshop operations
-
Blackstone, J.H., Phillips, D.T. and Hogg, G.L., 1982, A state-of-the-art survey of dispatching rules for manufacturing jobshop operations. International Journal of Production Research, 20, 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
9
-
-
0001173515
-
Priority dispatching and job lateness in a jobshop
-
Conway, R.W., 1965, Priority dispatching and job lateness in a jobshop. Journal of Industrial Engineering, 16, 228-237.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 228-237
-
-
Conway, R.W.1
-
10
-
-
0011788714
-
Network dispatching by shortest operation discipline
-
Conway, R.W. and Maxwell, W.L., 1962, Network dispatching by shortest operation discipline. Operations Research, 10, 51-73.
-
(1962)
Operations Research
, vol.10
, pp. 51-73
-
-
Conway, R.W.1
Maxwell, W.L.2
-
11
-
-
0004113622
-
-
Reading, MA: Addison Wesley
-
Conway, R.W., Maxwell, W.L. and Miller, L.W., 1967, Theory of Scheduling (Reading, MA: Addison Wesley).
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
12
-
-
84989446840
-
Operating policies for scheduling assembled products
-
Goodwin, J.S. and Goodwin, J.C., 1982, Operating policies for scheduling assembled products. Decision Sciences, 13, 585-603.
-
(1982)
Decision Sciences
, vol.13
, pp. 585-603
-
-
Goodwin, J.S.1
Goodwin, J.C.2
-
13
-
-
34249973653
-
A survey of priority rule-based scheduling
-
Haupt, R., 1989, A survey of priority rule-based scheduling. OR Spektrum, 11, 3-16.
-
(1989)
OR Spektrum,
, vol.11
, pp. 3-16
-
-
Haupt, R.1
-
14
-
-
0030782894
-
Efficient dispatching rules for scheduling in a jobshop
-
Holthaus, O. and Rajendran, C., 1997, Efficient dispatching rules for scheduling in a jobshop. International Journal of Production Economies, 48, 87-105.
-
(1997)
International Journal of Production Economies
, vol.48
, pp. 87-105
-
-
Holthaus, O.1
Rajendran, C.2
-
16
-
-
0011789253
-
Priority dispatching and assembly operations in a jobshop
-
1969
-
Maxwell, W.L., 1969, Priority dispatching and assembly operations in a jobshop. Rand Corporation Memorandum, 1969.
-
(1969)
Rand Corporation Memorandum
-
-
Maxwell, W.L.1
-
17
-
-
0001274658
-
Multiple-factor rules for sequencing with assembly constraints
-
Maxwell, W.L. and Mehra, M., 1968, Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
-
(1968)
Naval Research Logistics Quarterly
, vol.15
, pp. 241-254
-
-
Maxwell, W.L.1
Mehra, M.2
-
19
-
-
0042305903
-
An experimental investigation and comparative evaluation of priority disciplines in jobshop-like queuing networks
-
Management Sciences Research Project
-
Nanot, Y.R., 1963, An experimental investigation and comparative evaluation of priority disciplines in jobshop-like queuing networks. Management Sciences Research Project, UCLA Research Report No. 87.
-
(1963)
UCLA Research Report
, vol.87
-
-
Nanot, Y.R.1
-
20
-
-
0026140380
-
A preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
Philipoom, P.R., Russell, R.S. and Fry, T.D., 1991, A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29, 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 739-753
-
-
Philipoom, P.R.1
Russell, R.S.2
Fry, T.D.3
-
21
-
-
0027699991
-
An efficient dynamic dispatching rule for scheduling in a jobshop
-
Raghu, T.S. and Rajendran, C., 1993, An efficient dynamic dispatching rule for scheduling in a jobshop. International Journal of Production Economics, 32, 301-313.
-
(1993)
International Journal of Production Economics
, vol.32
, pp. 301-313
-
-
Raghu, T.S.1
Rajendran, C.2
-
22
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flowshops and jobshops
-
Rajendran, C. and Holthaus, O., 1999, A comparative study of dispatching rules in dynamic flowshops and jobshops. European Journal of Operational Research, 116, 156-170.
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
23
-
-
29444438437
-
Dynamic jobshop scheduling: A survey of simulation research
-
Ramasesh, R., 1990, Dynamic jobshop scheduling: a survey of simulation research. OMEGA, 16, 43-57.
-
(1990)
OMEGA
, vol.16
, pp. 43-57
-
-
Ramasesh, R.1
-
24
-
-
0016885524
-
A statistical comparison of the performance of simple dispatching rules for a particular set of jobshops
-
Rochette, R. and Sadowski, R.P., 1976, A statistical comparison of the performance of simple dispatching rules for a particular set of jobshops. International Journal of Production Research, 14, 63-75.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 63-75
-
-
Rochette, R.1
Sadowski, R.P.2
-
25
-
-
0030172572
-
Dynamic assignation of due-dates in an assembly shop based in simulation
-
Roman, D.B. and Del Valle, A.G., 1996, Dynamic assignation of due-dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1539-1554
-
-
Roman, D.B.1
Del Valle, A.G.2
-
27
-
-
84985747359
-
An evaluation of sequencing rules for an assembly shop
-
Russell, R.S. and Taylor III B.W., 1985, An evaluation of sequencing rules for an assembly shop. Decision Sciences, 16, 196-212.
-
(1985)
Decision Sciences
, vol.16
, pp. 196-212
-
-
Russell, R.S.1
Taylor B.W. III2
-
28
-
-
0011727186
-
Priority dispatching rules in jobshops with assembly operations and random delays
-
Sculli, D., 1980, Priority dispatching rules in jobshops with assembly operations and random delays. OMEGA, 8, 227-234.
-
(1980)
OMEGA
, vol.8
, pp. 227-234
-
-
Sculli, D.1
-
30
-
-
0001385963
-
Regression-based due date assignment rules for improved assembly shop performance
-
Smith, C.H., Minor, E.D. and Wen, H.J., 1995, Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
31
-
-
0023399009
-
Priority rules for jobshops with weighted tardiness costs
-
Vepsalainen, A.P.J. and Morton, T.E., 1987, Priority rules for jobshops with weighted tardiness costs. Management Science, 33, 1035-1047.
-
(1987)
Management Science
, vol.33
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
32
-
-
0029344295
-
A comparative study of some priority dispatching rules under different shop loads
-
Waikar, A.M., Sarkar, B.R. and Lal, A.M., 1995, A comparative study of some priority dispatching rules under different shop loads. Production Planning & Control, 6, 301-310.
-
(1995)
Production Planning & Control
, vol.6
, pp. 301-310
-
-
Waikar, A.M.1
Sarkar, B.R.2
Lal, A.M.3
-
33
-
-
0345403299
-
The influence of setup time on jobshop performance
-
Wilbrecht, J.K. and Prescott, W.R., 1969, The influence of setup time on jobshop performance. Management Science, 16, 274-280.
-
(1969)
Management Science
, vol.16
, pp. 274-280
-
-
Wilbrecht, J.K.1
Prescott, W.R.2
|