Volumn 153, Issue 1, 2007, Pages 297-345

Production planning with load dependent lead times: An update of research

Author keywords

Load dependent lead times; Mathematical programming; Production planning; Supply chain management

Indexed keywords


EID: 34250195301     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-007-0173-5     Document Type: Article
Times cited : (68)

References (111)
  • 1
    • 0016950777 scopus 로고
    • Dynamic modeling and control of congestion-prone systems
    • Agnew, C. (1976). Dynamic modeling and control of congestion-prone systems. Operations Research, 24(3), 400-419.
    • (1976) Operations Research , vol.24 , Issue.3 , pp. 400-419
    • Agnew, C.1
  • 5
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • Asmundsson, J., Rardin, R. L., & Uzsoy, R. (2006b). Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Transactions on Semiconductor Manufacturing, 19(1), 95-111.
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.1 , pp. 95-111
    • Asmundsson, J.1    Rardin, R.L.2    Uzsoy, R.3
  • 8
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W. (1988). Theory and practice of load-oriented manufacturing control. International Journal of Production Research, 26(3), 375-395.
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 10
    • 0020783525 scopus 로고
    • The effect of workload dependent due dates on job shop performance
    • Bertrand, J. W. M. (1983). The effect of workload dependent due dates on job shop performance. Management Science, 29(7), 799-816.
    • (1983) Management Science , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.W.M.1
  • 13
    • 0038183358 scopus 로고    scopus 로고
    • From fluid relaxations to practical algorithms for job shop scheduling: The makespan objective
    • Bertsimas, D., & Sethuraman, J. (2002). From fluid relaxations to practical algorithms for job shop scheduling: The makespan objective. Mathematical Programming, 92(1), 61-102.
    • (2002) Mathematical Programming , vol.92 , Issue.1 , pp. 61-102
    • Bertsimas, D.1    Sethuraman, J.2
  • 14
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained mrp systems: Review, formulation and problem reduction
    • Billington, P. J., McClain, J. O., & Thomas, L. J. (1983). Mathematical programming approaches to capacity-constrained mrp systems: Review, formulation and problem reduction. Management Science, 29(10), 1126-1137.
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1137
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 15
    • 0019590377 scopus 로고
    • Hierarchical production planning: A single stage system
    • Bitran, G. R., Haas, E. A., & Hax, A. C. (1981). Hierarchical production planning: A single stage system. Operations Research, 29, 717-743.
    • (1981) Operations Research , vol.29 , pp. 717-743
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 16
    • 0020103083 scopus 로고
    • Hierarchical production planning: A two stage system
    • Bitran, G. R., Haas, E. A., & Hax, A. C. (1982). Hierarchical production planning: A two stage system. Operations Research, 30, 232-251.
    • (1982) Operations Research , vol.30 , pp. 232-251
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 19
    • 0033313952 scopus 로고    scopus 로고
    • Modeling load-dependent lead time constraints for efficient supply chain coordination: Convexity issues
    • Caramanis, M. C., & Anli, O. M. (1999a). Modeling load-dependent lead time constraints for efficient supply chain coordination: Convexity issues. In Proceedings of the 38th IEEE conference on decision and control (Vol. 1, pp. 900-906).
    • (1999) Proceedings of the 38th IEEE conference on decision and control , vol.1 , pp. 900-906
    • Caramanis, M.C.1    Anli, O.M.2
  • 21
    • 0033872695 scopus 로고    scopus 로고
    • Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information
    • Chen, F., Drezner, Z., Ryan, J. K., & Simchi-Levi, D. (2000). Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information. Management Science, 46,436-443.
    • (2000) Management Science , vol.46 , pp. 436-443
    • Chen, F.1    Drezner, Z.2    Ryan, J.K.3    Simchi-Levi, D.4
  • 22
    • 0029387479 scopus 로고
    • A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times
    • Clark, A. R., & Armentano, V. A. (1995). A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times. Journal of the Operational Research Society, 46, 1208-1222.
    • (1995) Journal of the Operational Research Society , vol.46 , pp. 1208-1222
    • Clark, A.R.1    Armentano, V.A.2
  • 27
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead time settings
    • Enns, S. T. (2001). MRP performance effects due to lot size and planned lead time settings. International Journal of Production Research, 39(1), 461-480.
    • (2001) International Journal of Production Research , vol.39 , Issue.1 , pp. 461-480
    • Enns, S.T.1
  • 30
    • 0034156160 scopus 로고    scopus 로고
    • A supply network model with base-stock control and service requirements
    • Ettl, M., Feigin, G. E., Lin, G. Y., & Yao, D. D. (2000). A supply network model with base-stock control and service requirements. Operations Research, 48, 216-232.
    • (2000) Operations Research , vol.48 , pp. 216-232
    • Ettl, M.1    Feigin, G.E.2    Lin, G.Y.3    Yao, D.D.4
  • 34
  • 35
    • 0022741221 scopus 로고
    • A tactical planning model for job shops
    • Graves, S. C. (1986). A tactical planning model for job shops. Operations Research, 34, 522-533.
    • (1986) Operations Research , vol.34 , pp. 522-533
    • Graves, S.C.1
  • 37
    • 34250188514 scopus 로고    scopus 로고
    • Working paper, The Logistics Institute, Georgia Tech, and The Logistics Institute-Asia Pacific, National University of Singapore
    • Hackman, S., Rianõ, G., Serfozo, R., Ng, S. H., Lendermann, P., & Chan, L. P. (2002). A stochastic production planning model. Working paper, The Logistics Institute, Georgia Tech, and The Logistics Institute-Asia Pacific, National University of Singapore.
    • (2002) A stochastic production planning model
    • Hackman, S.1    Rianõ, G.2    Serfozo, R.3    Ng, S.H.4    Lendermann, P.5    Chan, L.P.6
  • 38
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • Hackman, S. T., & Leachman, R. C. (1989). A general framework for modeling production. Management Science, 35, 478-495.
    • (1989) Management Science , vol.35 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 39
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • Hall, N. G., & Potts, C. N. (2003). Supply chain scheduling: Batching and delivery. Operations Research, 51, 566-584.
    • (2003) Operations Research , vol.51 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 40
    • 0026239339 scopus 로고
    • Job release: Part of a hierarchical system to manage manufacturing lead times in make-to-order companies
    • Hendry, L. C., & Kingsman, B. C. (1991). Job release: Part of a hierarchical system to manage manufacturing lead times in make-to-order companies. Journal of the Operational Research Society, 42 , 871-883.
    • (1991) Journal of the Operational Research Society , vol.42 , pp. 871-883
    • Hendry, L.C.1    Kingsman, B.C.2
  • 41
    • 0032634574 scopus 로고    scopus 로고
    • Finding optimal material release times using simulation-based optimization
    • Homem-de-Mello, T., Shapiro, A., & Spearman, M. L. (1999). Finding optimal material release times using simulation-based optimization. Management Science, 45, 86-102.
    • (1999) Management Science , vol.45 , pp. 86-102
    • Homem-de-Mello, T.1    Shapiro, A.2    Spearman, M.L.3
  • 45
    • 0242364629 scopus 로고    scopus 로고
    • The impacts of sharing production information on supply chain dynamics: A review of the literature
    • Huang, G. Q., Lau, J. S. K., & Mak, K. L. (2003). The impacts of sharing production information on supply chain dynamics: A review of the literature. International Journal of Production Research, 41, 1483-1517.
    • (2003) International Journal of Production Research , vol.41 , pp. 1483-1517
    • Huang, G.Q.1    Lau, J.S.K.2    Mak, K.L.3
  • 46
    • 85016055097 scopus 로고    scopus 로고
    • A production planning approach based on iterations of linear programming optimization and flow time prediction
    • Hung, Y.-F, & Hou, M.-C. (2001). A production planning approach based on iterations of linear programming optimization and flow time prediction. Journal of the Chinese Institute of Industrial Engineers, 18(3), 55-67.
    • (2001) Journal of the Chinese Institute of Industrial Engineers , vol.18 , Issue.3 , pp. 55-67
    • Hung, Y.-F.1    Hou, M.-C.2
  • 47
    • 29144458408 scopus 로고    scopus 로고
    • A single-product dynamic lot sizing model with work in process and congestion
    • Technical report, School of Industrial Engineering, Purdue University, West Lafayette
    • Hwang, S., & Uzsoy, R. (2004). A single-product dynamic lot sizing model with work in process and congestion. Technical report, School of Industrial Engineering, Purdue University, West Lafayette.
    • (2004)
    • Hwang, S.1    Uzsoy, R.2
  • 49
    • 10444251003 scopus 로고    scopus 로고
    • Definition and properties of the input-weighted average lead-time
    • Jodlbauer, H. (2005). Definition and properties of the input-weighted average lead-time. European Journal of Operational Research, 164, 354-357.
    • (2005) European Journal of Operational Research , vol.164 , pp. 354-357
    • Jodlbauer, H.1
  • 50
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar, U. S. (1987). Lot sizes, lead times and in-process inventories. Management Science, 33, 409-418.
    • (1987) Management Science , vol.33 , pp. 409-418
    • Karmarkar, U.S.1
  • 51
    • 0001626728 scopus 로고
    • Batching to minimize flow times on parallel heterogeneous machines
    • Karmarkar, U. S. ( 1989a). Batching to minimize flow times on parallel heterogeneous machines. Management Science, 35, 607-613.
    • (1989) Management Science , vol.35 , pp. 607-613
    • Karmarkar, U.S.1
  • 52
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-process (WIP) and lead times
    • Karmarkar, U. S. (1989b). Capacity loading and release planning with work-in-process (WIP) and lead times. Journal of Manufacturing and Operations Management, 2, 105-123.
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 54
    • 77950506731 scopus 로고
    • Manufacturing lead times, order release and capacity loading
    • S. C. Graves, A. Rinnooy Kan & P. Zipkin Eds, Amsterdam: North-Holland
    • Karmarkar, U. S. (1993b). Manufacturing lead times, order release and capacity loading. In S. C. Graves, A. Rinnooy Kan & P. Zipkin (Eds.), Logistics of production and inventoiy. Handbooks in operations research and management science (Vol. 4, pp. 287-329). Amsterdam: North-Holland.
    • (1993) Logistics of production and inventoiy. Handbooks in operations research and management science , vol.4 , pp. 287-329
    • Karmarkar, U.S.1
  • 55
    • 0022128589 scopus 로고
    • Lot sizing in multi-item multi-machine job shops
    • Karmarkar, U. S., Kekre, S., & Kekre, S. (1985a). Lot sizing in multi-item multi-machine job shops. HE Transactions, 17, 290-298.
    • (1985) HE Transactions , vol.17 , pp. 290-298
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3
  • 56
    • 0022034627 scopus 로고
    • Lot-sizing and lead-time performance ina manufacturing cell
    • Karmarkar, U. S., Kekre, S., Kekre, S., & Freeman, S. (1985b). Lot-sizing and lead-time performance ina manufacturing cell. Interfaces, 15(2), 1-9.
    • (1985) Interfaces , vol.15 , Issue.2 , pp. 1-9
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3    Freeman, S.4
  • 59
    • 0030407745 scopus 로고    scopus 로고
    • Dynamic release control policy for the semiconductor wafer fabrication lines
    • Kim, J., Leachman, R. C., & Suh, B. (1996). Dynamic release control policy for the semiconductor wafer fabrication lines. Journal of the Operational Research Society, 47, 1516-1525.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 1516-1525
    • Kim, J.1    Leachman, R.C.2    Suh, B.3
  • 60
    • 34250213874 scopus 로고    scopus 로고
    • A column generation heuristic for capacity expansion problems
    • to appear
    • Kim, S., & Uzsoy, R. (2006a). A column generation heuristic for capacity expansion problems. HE Transactions, to appear.
    • (2006) HE Transactions
    • Kim, S.1    Uzsoy, R.2
  • 61
    • 34250166549 scopus 로고    scopus 로고
    • Exact and heuristic algorithms for capacity expansion problems
    • Technical report, Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, West Lafayette
    • Kim, S., & Uzsoy, R. (2006b). Exact and heuristic algorithms for capacity expansion problems. Technical report, Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, West Lafayette.
    • (2006)
    • Kim, S.1    Uzsoy, R.2
  • 63
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concept in job shops: A critical assessment
    • Land, M. J., & Gaalman, G. J. C. (1996). Workload control concept in job shops: A critical assessment. International Journal of Production Economics, 46/47(11), 535-548.
    • (1996) International Journal of Production Economics , vol.46-47 , Issue.11 , pp. 535-548
    • Land, M.J.1    Gaalman, G.J.C.2
  • 64
    • 34250222510 scopus 로고    scopus 로고
    • Mittelfristige Produktionsprogrammplanung mit auslastungsabhängigen Vorlaufzeiten. PhD thesis, University of Darmstadt, Dannstadt
    • Lautenschläger, M. (1999). Mittelfristige Produktionsprogrammplanung mit auslastungsabhängigen Vorlaufzeiten. PhD thesis, University of Darmstadt, Dannstadt.
    • (1999)
    • Lautenschläger, M.1
  • 65
    • 12344293116 scopus 로고    scopus 로고
    • Modelling lead times depending on capacity utilization
    • Technical report, Technische Hochschule Darmstadt, Darmstadt, Germany
    • Lautenschläger, M., & Stadtler, H. (1998). Modelling lead times depending on capacity utilization. Technical report, Technische Hochschule Darmstadt, Darmstadt, Germany.
    • (1998)
    • Lautenschläger, M.1    Stadtler, H.2
  • 66
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: The bullwhip effect
    • Lee, H. L., Padmanabhan, V., & Whang, S. (1997). Information distortion in a supply chain: The bullwhip effect. Management Science, 43, 546-558.
    • (1997) Management Science , vol.43 , pp. 546-558
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 67
    • 0000797228 scopus 로고
    • Metamodels of production line transient behaviour for sudden machine breakdowns
    • Lin, L., & Cochran, J. K. (1990). Metamodels of production line transient behaviour for sudden machine breakdowns. International Journal of Production Research, 28(10), 1791-1806.
    • (1990) International Journal of Production Research , vol.28 , Issue.10 , pp. 1791-1806
    • Lin, L.1    Cochran, J.K.2
  • 68
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Lu, S. C. H., Ramaswamy, D., & Kumar, P. R. (1994). Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing, 7, 374-388.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 70
    • 0036820605 scopus 로고    scopus 로고
    • Lot sizing in workload control systems
    • Missbauer, H. (2002). Lot sizing in workload control systems. Production Planning & Control, 13(7), 649-664.
    • (2002) Production Planning & Control , vol.13 , Issue.7 , pp. 649-664
    • Missbauer, H.1
  • 71
    • 34250197258 scopus 로고    scopus 로고
    • Models of the transient behaviour of production units to optimize the aggregate material flow
    • Presented at, Iceland, 2-5 July
    • Missbauer, H. (2006a). Models of the transient behaviour of production units to optimize the aggregate material flow. Presented at 21st European conference on operational research, EURO XXI, Iceland, 2-5 July 2006.
    • (2006) 21st European conference on operational research, EURO , vol.21
    • Missbauer, H.1
  • 73
    • 0020748126 scopus 로고
    • Operations Research, 31
    • 3, 432-4-55
    • Odoni, A. R., & Roth, E. (1983). An empirical investigation of the transient behavior of stationary queuing systems. Operations Research, 31(3), 432-4-55.
    • (1983)
    • Odoni, A.R.1    Roth, E.2
  • 74
    • 84873012341 scopus 로고    scopus 로고
    • Orcun, S., Asmundsson, J. M., Uzsoy, R., Clement, J. P., Pekny, J. F., & Rardin, R. L. (2006a, to appear). Supply chain optimization and protocol environment (SCOPE) for rapid prototyping and analysis of complex supply chains. Production Planning & Control.
    • Orcun, S., Asmundsson, J. M., Uzsoy, R., Clement, J. P., Pekny, J. F., & Rardin, R. L. (2006a, to appear). Supply chain optimization and protocol environment (SCOPE) for rapid prototyping and analysis of complex supply chains. Production Planning & Control.
  • 76
    • 0030170083 scopus 로고    scopus 로고
    • Mixture inventory models with backorders and lost sales for variable lead times
    • Ouyang, L., Yeh, N., & Wu, K. (1997). Mixture inventory models with backorders and lost sales for variable lead times. Journal of the Operational Research Society, 47, 829-832.
    • (1997) Journal of the Operational Research Society , vol.47 , pp. 829-832
    • Ouyang, L.1    Yeh, N.2    Wu, K.3
  • 78
    • 29144457726 scopus 로고    scopus 로고
    • Load dependent lead times - from empirical evidence to mathematical modeling
    • H. Kotzab, S. Seuring, M. Müiler & G. Reiner Eds, Heidelberg: Physica
    • Pahl, J., Voß, S., & Woodruff, D. L. (2005a). Load dependent lead times - from empirical evidence to mathematical modeling. In H. Kotzab, S. Seuring, M. Müiler & G. Reiner (Eds.), Research methodologies in supply chain management (pp. 539-554). Heidelberg: Physica.
    • (2005) Research methodologies in supply chain management , pp. 539-554
    • Pahl, J.1    Voß, S.2    Woodruff, D.L.3
  • 79
    • 29144447714 scopus 로고    scopus 로고
    • Production planning with load dependent lead times. 40R: A Quarterly
    • Pahl, J., Voß, S., & Woodruff, D. L. (2005b). Production planning with load dependent lead times. 40R: A Quarterly Journal of Operations Research, 3(4), 257-302.
    • (2005) Journal of Operations Research , vol.3 , Issue.4 , pp. 257-302
    • Pahl, J.1    Voß, S.2    Woodruff, D.L.3
  • 80
    • 0026953379 scopus 로고
    • Capacity-based order review/release strategies to improve manufacturing performance
    • Philipoom, P. R., & Fry, T. D. (1992). Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research, 30(11), 2559-2572.
    • (1992) International Journal of Production Research , vol.30 , Issue.11 , pp. 2559-2572
    • Philipoom, P.R.1    Fry, T.D.2
  • 82
    • 34250216059 scopus 로고    scopus 로고
    • Technical report, COPA Centra de Optimización y Probabilidad Aplicada, Universidad de los Andes and Georgia Institute of Technology
    • Riano, G., Serfozo, R., & Hackman, S. (2003a). Modeling mndom lead times in linear programs: A tutorial. Technical report, COPA Centra de Optimización y Probabilidad Aplicada, Universidad de los Andes and Georgia Institute of Technology.
    • (2003) Modeling mndom lead times in linear programs: A tutorial
    • Riano, G.1    Serfozo, R.2    Hackman, S.3
  • 83
    • 34250204944 scopus 로고    scopus 로고
    • Technical report, COPA Centra de Optimizaciön y Probabilidad Aplicada, Universidad de los Andes and Georgia Institute of Technology
    • Riafio, G., Serfozo, R., & Hackman, S. (2003b). A transient little law. Technical report, COPA Centra de Optimizaciön y Probabilidad Aplicada, Universidad de los Andes and Georgia Institute of Technology.
    • (2003) A transient little law
    • Riafio, G.1    Serfozo, R.2    Hackman, S.3
  • 84
    • 34250193319 scopus 로고    scopus 로고
    • Technical report, COPA Centra de Optimizaciön y Probabilidad Aplicada, Universidad de los Andes and Georgia Institute of Technology
    • Riafio, G., Serfozo, R., & Hackman, S. (2006). Transient behavior of queuing networks. Technical report, COPA Centra de Optimizaciön y Probabilidad Aplicada, Universidad de los Andes and Georgia Institute of Technology.
    • (2006) Transient behavior of queuing networks
    • Riafio, G.1    Serfozo, R.2    Hackman, S.3
  • 85
    • 84873001085 scopus 로고    scopus 로고
    • Selcuk, B., Fransoo, J. C., & De Kok, A. G. (2005). Work-in-process clewing in supply chain operations planning. Working paper, Department of Technology Management, Technische Universiteit Eindhoven, The Netherlands. Internet source: http://w3.tm.tue.nl/fileadmin/tm/ Capaciteitsgroepen/OPAC/ ClearingFunction.pdf, last call 25 December 2006.
    • Selcuk, B., Fransoo, J. C., & De Kok, A. G. (2005). Work-in-process clewing in supply chain operations planning. Working paper, Department of Technology Management, Technische Universiteit Eindhoven, The Netherlands. Internet source: http://w3.tm.tue.nl/fileadmin/tm/ Capaciteitsgroepen/OPAC/ ClearingFunction.pdf, last call 25 December 2006.
  • 86
    • 33748747284 scopus 로고    scopus 로고
    • The effect of updating lead times on the performance of hierarchical planning systems
    • Selcuk, B., Fransoo, J. C., & De Kok, A. G. (2006). The effect of updating lead times on the performance of hierarchical planning systems. International Journal of Production Economics, 104(2), 427-440.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 427-440
    • Selcuk, B.1    Fransoo, J.C.2    De Kok, A.G.3
  • 88
    • 0032630294 scopus 로고    scopus 로고
    • Optimal lead time policies
    • Spearman, M. L., & Zhang, R. Q. (1999). Optimal lead time policies. Management Science, 45(2), 290-295.
    • (1999) Management Science , vol.45 , Issue.2 , pp. 290-295
    • Spearman, M.L.1    Zhang, R.Q.2
  • 92
    • 34250211828 scopus 로고    scopus 로고
    • Stadtler, H, & Kilger, C, Eds, 3rd ed, Berlin: Springer
    • Stadtler, H., & Kilger, C. (Eds.). (2005). Supply chain management and advanced planning (3rd ed.). Berlin: Springer.
    • (2005) Supply chain management and advanced planning
  • 94
    • 0021623890 scopus 로고
    • Modeling flexible manufacturing systems using mean value analysis
    • Suri, R., & Hildenbrant, R. R. (1984). Modeling flexible manufacturing systems using mean value analysis. Journal of Manufacturing Systems, 3, 27-38.
    • (1984) Journal of Manufacturing Systems , vol.3 , pp. 27-38
    • Suri, R.1    Hildenbrant, R.R.2
  • 95
    • 0020936101 scopus 로고    scopus 로고
    • Tatsiopoulos, 1. P., & Kingsman, B. G. (1983). Lead time management. European Journal of Operational Research, 14, 351-358.
    • Tatsiopoulos, 1. P., & Kingsman, B. G. (1983). Lead time management. European Journal of Operational Research, 14, 351-358.
  • 96
    • 0036794777 scopus 로고    scopus 로고
    • Improving supply-chain performance by sharing advance demand information
    • Thonemann, U. W. (2002). Improving supply-chain performance by sharing advance demand information. European Journal of Operational Research, 142, 81-107.
    • (2002) European Journal of Operational Research , vol.142 , pp. 81-107
    • Thonemann, U.W.1
  • 97
    • 34250156036 scopus 로고    scopus 로고
    • Integrated production planning and pricing decisions in congestion - prone capacitated production systems
    • Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, West Lafayette
    • Upasani, A., & Uzsoy, R. (2005). Integrated production planning and pricing decisions in congestion - prone capacitated production systems. Research report, Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, West Lafayette.
    • (2005) Research report
    • Upasani, A.1    Uzsoy, R.2
  • 98
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, part II: Shop-floor control
    • Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1994). A review of production planning and scheduling models in the semiconductor industry, part II: Shop-floor control. HE Transactions, 26, 44-55.
    • (1994) HE Transactions , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 102
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management Science, 5, 89-96.
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 104
    • 29144535470 scopus 로고    scopus 로고
    • Simple heuristics for scheduling with limited intermediate storage
    • to appear
    • Witt, A., & Voß, S. (2005, to appear). Simple heuristics for scheduling with limited intermediate storage. Computers & Operations Research.
    • (2005) Computers & Operations Research
    • Witt, A.1    Voß, S.2
  • 105
    • 29144493329 scopus 로고    scopus 로고
    • A mixed inventory model with variable lead time and random supplier capacity
    • Wu, K. (2001). A mixed inventory model with variable lead time and random supplier capacity. Production Planning &Control, 33, 95-106.
    • (2001) Production Planning &Control , vol.33 , pp. 95-106
    • Wu, K.1
  • 106
    • 0023207074 scopus 로고
    • Setting planned leadtimes in serial production systems with tardiness costs
    • Yano, C. A. (1987). Setting planned leadtimes in serial production systems with tardiness costs. Management Science, 33, 95-106.
    • (1987) Management Science , vol.33 , pp. 95-106
    • Yano, C.A.1
  • 108
    • 0027625964 scopus 로고
    • Production planning and control (PPC) systems including load-oriented order release - problems and research perspectives
    • Zäpfel, G., & Missbauer, H. (1993a). Production planning and control (PPC) systems including load-oriented order release - problems and research perspectives. International Journal of Production Economics, 30, 107-122.
    • (1993) International Journal of Production Economics , vol.30 , pp. 107-122
    • Zäpfel, G.1    Missbauer, H.2
  • 110
    • 0037120692 scopus 로고    scopus 로고
    • The impact of forecasting model selection on the value of information sharing in a supply chain
    • Zhao, X., Xie, J., & Leung, J. (2002). The impact of forecasting model selection on the value of information sharing in a supply chain. European Journal of Operational Research, 142, 321-344.
    • (2002) European Journal of Operational Research , vol.142 , pp. 321-344
    • Zhao, X.1    Xie, J.2    Leung, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.