메뉴 건너뛰기




Volumn 120, Issue 1, 2000, Pages 118-130

Lead times, order release mechanisms, and customer service

Author keywords

Customer service; Efficiency; Manufacturing; Order release mechanisms; Siumulation

Indexed keywords


EID: 0347946641     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(98)00393-2     Document Type: Article
Times cited : (19)

References (35)
  • 5
    • 0029207722 scopus 로고
    • Quality defaults and work-in-process inventory
    • Cordon, C., 1995. Quality defaults and work-in-process inventory. European Journal of Operational Research 80, 240-251.
    • (1995) European Journal of Operational Research , vol.80 , pp. 240-251
    • Cordon, C.1
  • 9
    • 0008299369 scopus 로고
    • Determining safety stock in the presence of stochastic lead time and demand
    • Eppen, G.D., Martin, R.K., 1988. Determining safety stock in the presence of stochastic lead time and demand. Management Science 34, 1380-1390.
    • (1988) Management Science , vol.34 , pp. 1380-1390
    • Eppen, G.D.1    Martin, R.K.2
  • 13
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese JIT technique (with kanbans) for a multi-line, multistage production system
    • Huang, P.Y., Rees, L.P., Taylor III, B.W., 1983. A simulation analysis of the Japanese JIT technique (with kanbans) for a multi-line, multistage production system. Decision Sciences 14, 326-343.
    • (1983) Decision Sciences , vol.14 , pp. 326-343
    • Huang, P.Y.1    Rees, L.P.2    Taylor B.W. III3
  • 14
    • 77950506731 scopus 로고
    • Manufacturing lead times, order release, and capacity loading
    • Elsevier, Amsterdam
    • Karmarkar, U.S., 1987. Manufacturing lead times, order release, and capacity loading. In: Handbooks in OR & MS, vol. 4, Elsevier, Amsterdam, pp. 287-329.
    • (1987) Handbooks in or & MS , vol.4 , pp. 287-329
    • Karmarkar, U.S.1
  • 16
    • 0031221480 scopus 로고    scopus 로고
    • Lead time and response time in a pull production control system
    • Kim, I., Tang, C.S., 1997. Lead time and response time in a pull production control system. European Journal of Operational Research 101, 474-485.
    • (1997) European Journal of Operational Research , vol.101 , pp. 474-485
    • Kim, I.1    Tang, C.S.2
  • 17
    • 84952179325 scopus 로고
    • Design and analysis of pull systems: A method of multi-stage production control
    • Kimura, O., Terada, H., 1981. Design and analysis of pull systems: A method of multi-stage production control. International Journal of Production Research 19, 241-253.
    • (1981) International Journal of Production Research , vol.19 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 21
    • 0029370473 scopus 로고
    • Response time design in integrated order processing/production systems
    • Lovejoy, W.S., Whang, S., 1995. Response time design in integrated order processing/production systems. Operations Research 43, 851-861.
    • (1995) Operations Research , vol.43 , pp. 851-861
    • Lovejoy, W.S.1    Whang, S.2
  • 22
    • 0025564738 scopus 로고
    • Analysis of a novel discipline for cell coordination in production lines
    • Mitra, D., Mitrani, I., 1990. Analysis of a novel discipline for cell coordination in production lines. I. Management Science 36, 1548-1566.
    • (1990) I. Management Science , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 24
    • 0029288392 scopus 로고
    • Input control in job shops
    • Raman, N., 1995. Input control in job shops. IIE Transactions 27, 201-209.
    • (1995) IIE Transactions , vol.27 , pp. 201-209
    • Raman, N.1
  • 25
    • 0010843780 scopus 로고
    • Push, pull, and squeeze shop floor control with computer simulation
    • Ramsay, M.L., Brown, S., Tabibzadeh, K., 1990. Push, pull, and squeeze shop floor control with computer simulation Industrial Engineering. 39-45.
    • (1990) Industrial Engineering , pp. 39-45
    • Ramsay, M.L.1    Brown, S.2    Tabibzadeh, K.3
  • 26
    • 0000996514 scopus 로고
    • Customer service in pull production systems
    • Spearman, M.L., 1992. Customer service in pull production systems. Operations Research 40, 948-958.
    • (1992) Operations Research , vol.40 , pp. 948-958
    • Spearman, M.L.1
  • 27
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M.L., Zazanis, M.A., 1992. Push and pull production systems: Issues and comparisons. Operations Research 40 (3), 521-532.
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 28
    • 85037516378 scopus 로고
    • Due date based performance measures for queueing networks
    • School of Operations Research, Cornell University, Ithaca, NY
    • Tate, D., 1991. Due date based performance measures for queueing networks. Technical Report. School of Operations Research, Cornell University, Ithaca, NY.
    • (1991) Technical Report
    • Tate, D.1
  • 29
    • 21144459469 scopus 로고
    • Properties of serial kanban systems
    • Tayur, S.R., 1992. Properties of serial kanban systems. Queueing Systems 12, 297-318.
    • (1992) Queueing Systems , vol.12 , pp. 297-318
    • Tayur, S.R.1
  • 31
    • 0001200692 scopus 로고
    • Due-date setting and priority sequencing in a multiclass M/G/1 queue
    • Wein, L.M., 1991. Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science 37, 834-850.
    • (1991) Management Science , vol.37 , pp. 834-850
    • Wein, L.M.1
  • 32
    • 0026884810 scopus 로고
    • A broader view of the job shop scheduling problem
    • Wein, L.M., Chevalier, P.B., 1992. A broader view of the job shop scheduling problem. Management Science 38, 1018-1033.
    • (1992) Management Science , vol.38 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2
  • 33
    • 0021529403 scopus 로고
    • Open and closed models for networks of queues
    • Whitt, W., 1984. Open and closed models for networks of queues. AT & T Bell Laboratories Technical Journal 63, 1911-1978.
    • (1984) AT & T Bell Laboratories Technical Journal , vol.63 , pp. 1911-1978
    • Whitt, W.1
  • 34
    • 0023207074 scopus 로고
    • Setting planned lead times in serial production systems with tardiness costs
    • Yano, C., 1987. Setting planned lead times in serial production systems with tardiness costs. Management Science 33, 96-106.
    • (1987) Management Science , vol.33 , pp. 96-106
    • Yano, C.1
  • 35
    • 0023439708 scopus 로고
    • From EOQ towards ZI
    • Zangwill, W., 1987. From EOQ towards ZI. Management Science 33, 1209-1223.
    • (1987) Management Science , vol.33 , pp. 1209-1223
    • Zangwill, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.