메뉴 건너뛰기




Volumn 18, Issue 3, 2001, Pages 55-67

A production planning approach based on iterations of linear programming optimization and flow time prediction

Author keywords

Flow time; Production planning; Semiconductor manufacturing

Indexed keywords


EID: 85016055097     PISSN: 10170669     EISSN: 21517606     Source Type: Journal    
DOI: 10.1080/10170660109509458     Document Type: Article
Times cited : (22)

References (14)
  • 2
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • Hackman, S. T., and Leachman, R. C., 1989. A general framework for modeling production. Management Science, 35:478–495.
    • (1989) Management Science , vol.35 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 6
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • Hung, Y. F., and Leachman, R. C., 1996. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing, 9 (2):257–269.
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 7
    • 0001930641 scopus 로고
    • Jobshop-like queueing systems
    • Jackson, J. R., 1963. Jobshop-like queueing systems. Management Science, 10:131–142.
    • (1963) Management Science , vol.10 , pp. 131-142
    • Jackson, J.R.1
  • 9
    • 0027842088 scopus 로고
    • Practical issues in scheduling and dispatching in semiconductor wafer fabrication
    • Johri, P. K., 1992. Practical issues in scheduling and dispatching in semiconductor wafer fabrication. Journal of Manufacturing Systems, 12 (6):474–485.
    • (1992) Journal of Manufacturing Systems , vol.12 , Issue.6 , pp. 474-485
    • Johri, P.K.1
  • 10
    • 21144477219 scopus 로고
    • Re-entrant lines
    • Kumar, P. R., 1993. Re-entrant lines. Queueing Systems, 13:87–110.
    • (1993) Queueing Systems , vol.13 , pp. 87-110
    • Kumar, P.R.1
  • 11
    • 0001829813 scopus 로고
    • Modeling technique for automated production planning in the semiconductor industry
    • Ciriani T.A., Leachman R.C., (eds), England: John Wiley and Sons, Ltd
    • Leachman, R. C., 1993. “ Modeling technique for automated production planning in the semiconductor industry ”. In In Optimization in Industry Edited by:Ciriani, T. A., and Leachman, R. C., 1–30. England:John Wiley and Sons, Ltd.
    • (1993) In Optimization in Industry , pp. 1-30
    • Leachman, R.C.1
  • 13
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Lu, S. C. H., Ramaswamy, D., and Kumar, P. R., 1994. Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing, 7 (3):374–388.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 14
    • 0004139890 scopus 로고
    • England: John Wiley and Sons, Ltd
    • Murty, K. G., 1983. Linear Programming England:John Wiley and Sons, Ltd.
    • (1983) Linear Programming
    • Murty, K.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.