메뉴 건너뛰기




Volumn 2, Issue , 2002, Pages 1123-1129

Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems

Author keywords

[No Author keywords available]

Indexed keywords

APPROXIMATION THEORY; COMPUTER SIMULATION; FEEDBACK; MATERIALS SCIENCE; PARAMETER ESTIMATION;

EID: 0036928986     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (12)

References (9)
  • 1
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead time settings
    • Enns, S.T. 2001. MRP performance effects due to lot size and planned lead time settings, International Journal of Production Research, Vol. 39, No. 3, 461-480.
    • (2001) International Journal of Production Research , vol.39 , Issue.3 , pp. 461-480
    • Enns, S.T.1
  • 2
    • 0036532654 scopus 로고    scopus 로고
    • MRP performance effects due to forecasting bias and demand uncertainty
    • Enns, S.T. 2002a. MRP performance effects due to forecasting bias and demand uncertainty, European Journal of Operational Research, Vol. 138, No. 1, 87-102.
    • (2002) European Journal of Operational Research , vol.138 , Issue.1 , pp. 87-102
    • Enns, S.T.1
  • 3
    • 0012342797 scopus 로고    scopus 로고
    • Work load responsive adjustment of MRP planned lead times
    • ed. A. Baykasoglu and T. Dereli, Gaziantep, Turkey
    • nd International Responsive Manufacturing Conference, ed. A. Baykasoglu and T. Dereli, 658-662. Gaziantep, Turkey.
    • (2002) nd International Responsive Manufacturing Conference , pp. 658-662
    • Enns, S.T.1
  • 4
    • 0026880880 scopus 로고
    • A model for determining tactical parameters for Materials Requirements Planning systems
    • Hill, A.V., and A.S. Raturi. 1992. A model for determining tactical parameters for Materials Requirements Planning systems, Journal of the Operational Research Society, Vol. 43, 605-620.
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 605-620
    • Hill, A.V.1    Raturi, A.S.2
  • 5
    • 0012305344 scopus 로고
    • Impact of processing and queueing times on order quantities
    • Jonsson, H. and E.A. Silver. 1985. Impact of processing and queueing times on order quantities, Material Flow, Vol. 2, 221-230.
    • (1985) Material Flow , vol.2 , pp. 221-230
    • Jonsson, H.1    Silver, E.A.2
  • 7
    • 0030288024 scopus 로고    scopus 로고
    • A general approximation for the single product lot sizing model with queueing delays
    • Lambrecht, M.R., and N.J. Vandaele. 1996. A general approximation for the single product lot sizing model with queueing delays, European Journal of Operational Research, Vol. 95, 73-88.
    • (1996) European Journal of Operational Research , vol.95 , pp. 73-88
    • Lambrecht, M.R.1    Vandaele, N.J.2
  • 8
    • 0032208462 scopus 로고    scopus 로고
    • ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling
    • Lambrecht, M.R., P.L. Ivens, and N.J. Vandaele. 1998. ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling, Management Science, Vol. 44, 1548-1561.
    • (1998) Management Science , vol.44 , pp. 1548-1561
    • Lambrecht, M.R.1    Ivens, P.L.2    Vandaele, N.J.3
  • 9
    • 0020848139 scopus 로고
    • The queueing network analyzer
    • Whitt, W. 1983. The Queueing Network Analyzer, The Bell Systems Technical Journal, Vol. 62, No. 9, 2779-2813.
    • (1983) The Bell Systems Technical Journal , vol.62 , Issue.9 , pp. 2779-2813
    • Whitt, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.