메뉴 건너뛰기




Volumn 4, Issue 1, 2004, Pages 19-31

Project scheduling and monitoring: Current research status

Author keywords

Project monitoring; Project scheduling; Research status; Resource scheduling; Simulation techniques; Time cost optimization

Indexed keywords


EID: 33845702538     PISSN: 14714175     EISSN: 14770857     Source Type: Journal    
DOI: 10.1108/14714170410814980     Document Type: Article
Times cited : (32)

References (44)
  • 8
    • 0032189393 scopus 로고    scopus 로고
    • Practical proposals for managing uncertainty and risk in project planning
    • Dawson, R-J. and Dawson, C-W. 1998: Practical proposals for managing uncertainty and risk in project planning. International Journal of Project Management 16 (5), 299-310.
    • (1998) International Journal of Project Management , vol.16 , Issue.5 , pp. 299-310
    • Dawson, R.-J.1    Dawson, C.-W.2
  • 9
    • 5244300270 scopus 로고    scopus 로고
    • Parametric constraint management in planning and scheduling computational basis
    • El-Bibany, H. 1997: Parametric constraint management in planning and scheduling computational basis. Journal of Construction Engineering and Management 123 (3), 348-353.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 348-353
    • El-Bibany, H.1
  • 11
    • 0035335276 scopus 로고    scopus 로고
    • Object-oriented model for repetitive construction scheduling
    • El-Rayes, K. 2001: Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management 127 (3), 199-205.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 199-205
    • El-Rayes, K.1
  • 16
    • 0031153881 scopus 로고    scopus 로고
    • Optimization of float use in risk analysis-based network scheduling
    • Gong, D. 1997: Optimization of float use in risk analysis-based network scheduling. International Journal of Project Management 15 (3), 187-192.
    • (1997) International Journal of Project Management , vol.15 , Issue.3 , pp. 187-192
    • Gong, D.1
  • 21
    • 84992967906 scopus 로고
    • Delay management: a software approach
    • School of Planning and Architecture, New Delhi.
    • Kabre, C. 1989: Delay management: a software approach. Masters thesis, School of Planning and Architecture, New Delhi.
    • (1989) Masters thesis
    • Kabre, C.1
  • 23
    • 0032670219 scopus 로고    scopus 로고
    • CONSCOM: an OO construction scheduling and change management system
    • Karim, A. and Adeli, H. 1999: CONSCOM: an OO construction scheduling and change management system. Journal of Construction Engineering and Management 125 (5), 368-376.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.5 , pp. 368-376
    • Karim, A.1    Adeli, H.2
  • 24
    • 0032684769 scopus 로고    scopus 로고
    • Application of mathematical matrix to integrate project schedule and cost
    • Lee, H-S. and Yi, K-J. 1999: Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management 125 (5), 339-346.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.5 , pp. 339-346
    • Lee, H.-S.1    Yi, K.-J.2
  • 26
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H. and Love, P. 1997: Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management 123 (3), 233-237.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2
  • 30
    • 84993037387 scopus 로고
    • Subjective evaluation of duration of construction activities for probabilistic project management
    • School of Planning and Architecture, New Delhi.
    • Mishra, G-C. 1989: Subjective evaluation of duration of construction activities for probabilistic project management. Masters thesis, School of Planning and Architecture, New Delhi.
    • (1989) Masters thesis
    • Mishra, G.-C.1
  • 32
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design/build fast-track construction projects
    • Pena-Mora, F. and Li, M. 2001: Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management 127 (1), 1-17.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 1-17
    • Pena-Mora, F.1    Li, M.2
  • 33
    • 0035510392 scopus 로고    scopus 로고
    • Dynamic planning for fast-tracking building construction projects
    • PeNa-Mora, F. and Park, M. 2001: Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management 127 (6), 445-456.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.6 , pp. 445-456
    • PeNa-Mora, F.1    Park, M.2
  • 34
    • 13944256583 scopus 로고    scopus 로고
    • Incorporating practicability into genetic algorithm-based time-cost optimization
    • Que, B-C. 2002: Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management 128 (2), 139-143.
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.2 , pp. 139-143
    • Que, B.-C.1
  • 35
    • 84993028237 scopus 로고    scopus 로고
    • A dynamic programming approach to time-cost trade off
    • School of Planning and Architecture, New Delhi.
    • Sahoo, D. 1996: A dynamic programming approach to time-cost trade off. Masters thesis, School of Planning and Architecture, New Delhi.
    • (1996) Masters thesis
    • Sahoo, D.1
  • 36
    • 84993088379 scopus 로고
    • Construction scheduling of civil works of an industrial project - a fuzzy set approach
    • School of Planning and Architecture, New Delhi.
    • Sawhney, A. 1990: Construction scheduling of civil works of an industrial project - a fuzzy set approach. Masters thesis, School of Planning and Architecture, New Delhi.
    • (1990) Masters thesis
    • Sawhney, A.1
  • 38
    • 0029471402 scopus 로고
    • Late-time computation for task chains using discrete-event simulation
    • Senior, B-A. 1995: Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management 121 (4), 397–403.
    • (1995) Journal of Construction Engineering and Management , vol.121 , Issue.4 , pp. 397-403
    • Senior, B.-A.1
  • 41
    • 0032684768 scopus 로고    scopus 로고
    • Activity-based construction (ABC) modeling and simulation method
    • Shi, J-J. 1999: Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management 125 (5), 354-360.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.5 , pp. 354-360
    • Shi, J.-J.1
  • 42


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.