메뉴 건너뛰기




Volumn 128, Issue 2, 2002, Pages 139-143

Incorporating practicability into genetic algorithm-based time-cost optimization

Author keywords

Algorithms; Construction management; Optimization; Project management; Scheduling

Indexed keywords

CONSTRUCTION INDUSTRY; DYNAMIC PROGRAMMING; GENETIC ALGORITHMS; HEURISTIC METHODS; LINEAR PROGRAMMING; OPTIMIZATION; SCHEDULING;

EID: 13944256583     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:2(139)     Document Type: Article
Times cited : (41)

References (7)
  • 1
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • Chan, W. T., Chua, D. K. H., and Kannan, G., (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.T.1    Chua, D.K.H.2    Kannan, G.3
  • 4
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H., and Love, P. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr. Eng. Manage., 123(3), 233-237.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.